MONTHYEARML23332A0012023-11-28028 November 2023 Public Summary of November 7 Tribal Consultation Response Letter to the NRC ML23317A3682023-11-0606 November 2023 Hermes CP Doc - (External_Sender) Construction of Kairos Power, LLC, Hermes Non-Power Test Reactor, Ettp - Project SHPO0001832 ML23305A0502023-11-0101 November 2023 NRR E-mail Capture - Response to Kairos Request for Non-Public Documents Related to Security ML23307A0552023-11-0101 November 2023 Hermes CP Doc - (External_Sender) Construction of Kairos Power, LLC, Hermes Non-Power Test Reactor, Ettp - Project SHPO0001832 ML23274A0062023-10-0101 October 2023 Hermes CP Doc - Public Summary of Sep 14 Meeting with Consulting Tribe NRC-2021-0193, Written Statement from the City of Oak Ridge Tennessee for the October 19, 2023 Evidentiary Hearing for the Kairos Power, LLC, Hermes Test Reactor Construction Permit Application2023-09-22022 September 2023 Written Statement from the City of Oak Ridge Tennessee for the October 19, 2023 Evidentiary Hearing for the Kairos Power, LLC, Hermes Test Reactor Construction Permit Application ML23268A3602023-09-12012 September 2023 Request to Speak Letter from the City of Oak Ridge, Tennessee at the October 19, 2023 Evidentiary Hearing for the Kairos Power, LLC, Hermes Test Reactor Construction Permit Application ML23226A1722023-08-10010 August 2023 NRR E-mail Capture - Hermes Construction Permit Application Mandatory Hearing Resource Estimate ML23185A0042023-07-0404 July 2023 Hermes CP Doc - Submittal of Supplemental Information from Kairos Power_Redacted (8).pdf ML23180A2982023-06-29029 June 2023 Hermes CP Doc - Public Summary of 6-27-23 Email from Consulting Tribe ML23180A2992023-06-29029 June 2023 Hermes CP Doc - FW Email Summary of the April 20 Kairos Submittal ML23177A1972023-06-26026 June 2023 Hermes CP Doc - Public Summary of 6-12-23 Letter from Consulting Tribe ML23173A0082023-06-21021 June 2023 Hermes CP Doc - Re Consultation Summaries from June 2023 Meetings with Consulting Tribe ML23160A2872023-06-0909 June 2023 Hermes CP Doc - General and Accident Analysis Audit Reports-Hermes Construction Permit PSAR (Docket Number 05007513) ML23157A3302023-06-0606 June 2023 Hermes CP Doc - Hermes CP Audit Questions 82-86 and 92-94 for Preliminary Safety Analysis Report Section 4.5 and Chapter 13 ML23157A3312023-06-0606 June 2023 Hermes CP Doc - Hermes CP Audit Questions 87-91 for Preliminary Safety Analysis Report Section 4.5 and Chapter 13 ML23139A2702023-05-19019 May 2023 Hermes CP Doc - Presentation for the 5-22-2023 Pre-Submittal Meeting on Kairos Power Fuel Qualification Supporting the Hermes Operating License Application ML23138A4032023-05-18018 May 2023 Hermes CP Doc - NRC General Audit Questions-Reactor Fuel, Reactor Vessel, Thermal Hydraulic Design, Reactor Coolant System ML23132A3262023-05-12012 May 2023 Hermes CP Doc - NRC Follow-up Emails to Federally Recognized Tribes Re Hermes CP Deis ML23129A7722023-05-0808 May 2023 Hermes CP Doc - Consultation Update for THC and Tdoa Re Kairos Hermes Test Reactor, Oak Ridge, Tn (Project SHPO0001832) ML23122A2922023-05-0202 May 2023 Hermes CP Doc - NRC Follow-Up Emails to Federally Recognized Tribes Re Hermes CP Deis ML23122A2932023-05-0202 May 2023 Hermes CP Doc - NRC Email to THC - Consultation Update Re - Kairos Hermes CP Review ML23115A4802023-04-25025 April 2023 NRR E-mail Capture - Hermes Audit Reports ML23064A0022023-03-0505 March 2023 Hermes CP Doc - Information Related to Government to Government Consultations - Section 106 of the National Historic Preservation Act ML23065A0582023-03-0202 March 2023 NRR E-mail Capture - Preliminary Hermes Construction Permit Application SE Appendix ML23058A2262023-02-27027 February 2023 NRR E-mail Capture - (External_Sender) Re Transmittal of NRC Staff Draft Safety Evaluation Regarding Kairos Power Graphite Materials Qualification Topical Report ML23065A0102023-02-0707 February 2023 NRR E-mail Capture - Remaining Preliminary Chapters of Hermes Construction Permit Application SE ML23036A0002023-02-0202 February 2023 Hermes CP Doc - (External_Sender) Re (External) Kairos Hermes Environmental Review ML23052A1272023-02-0101 February 2023 Hermes SE Chapter 4 - (External_Sender) Proprietary Check ML23031A0362023-01-31031 January 2023 Hermes CP Doc - Consultation Summary ML23006A1112023-01-14014 January 2023 Hermes PSAR General Audit Questions PSAR Section 6.3 ML23019A0502023-01-13013 January 2023 NRR E-mail Capture - General Audit Questions for Hermes PSAR Chapter 2 (Site Characteristics) ML23017A0812023-01-10010 January 2023 Email with Preliminary Chapters of Hermes SE ML23005A1072023-01-0202 January 2023 Hermes PSAR General Audit Question 1.3.9 Regarding 10 CFR 50.34(a)(8) ML23058A2252022-12-23023 December 2022 NRR E-mail Capture - (External_Sender) Re Transmittal of NRC Staff Draft Safety Evaluation Regarding Kairos Power Metallic Material Qualification Topical Report ML23006A1122022-12-16016 December 2022 Hermes SE Chapter 4 - Benjamin Beasley Has Invited You to Work Together in SE Text for Proprietary Review ML23006A1102022-12-16016 December 2022 Hermes SE Chapter 6 - Benjamin Beasley Has Invited You to Work Together in SE Text for Prop Review ML22297A1582022-10-18018 October 2022 Email W Elizabeth Toombs - Kairos Cultural Resource Reports Follow Up ML22242A2042022-08-30030 August 2022 Hermes CP Doc - (External_Sender) (External) Follow-up from NRC-NPS Teams Meeting on Aug 23 ML22220A2992022-08-0808 August 2022 Hermes CP Doc - NRC Final Request for Additional Information 339 for Hermes Construction Permit Application Regarding Inspection of Vessel Internals and the Natural Circulation Flow Path ML22227A1922022-08-0808 August 2022 Final RAI 350 for Air Ingress Into the Primary Heat Transport System ML22227A1802022-08-0808 August 2022 Final RAI 348 on Shutdown Rod Reliability ML22230D0762022-08-0505 August 2022 Final RCI 349 on Salt Purity in the Chemistry Control System and the Inert Gas System ML22224A2402022-07-29029 July 2022 Hermes CP Application General Audit Question on Load Combinations ML23150A2512022-07-19019 July 2022 NRR E-mail Capture - Questions on the Tritium Management System (Tms), Pebble Handling and Storage System (Phss), and Spent Fuel Cooling System (Sfcs) for the General Audit ML22196A0032022-07-14014 July 2022 Hermes CP Doc - Confirmation of Plateau Utility Numbers ML22204A0042022-07-0606 July 2022 Kairos Hermes CP Review - Email from J. Davis to Elizabeth Toombs Cherokee Nation ML22175A1502022-06-24024 June 2022 Hermes CP Doc - Kairos Hermes CP General Audit Question 5.1-13 ML22167A2012022-06-16016 June 2022 Hermes CP Doc - Transmittal of Hermes CP SE Section 3.2 ML22166A3242022-06-0909 June 2022 Hermes CP Doc - Follow-up Questions on the Inert Gas System for the General Audit 2023-09-22
[Table view] |
Text
From: Beasley, Benjamin Sent: Monday, April 18, 2022 1:14 PM To: Drew Peebles Cc: Darrell Gardner; Cuadrado de Jesus, Samuel; Schmidt, Jeffrey
Subject:
Questions for Accident Analysis Audit
- Drew, Below are some questions from our review of PSAR Chapter 4 for the Accident Analysis Audit.
Jeff may discuss these during his visit to Kairos this week. We would also like to schedule an audit meeting when you have had more time and are ready to discuss these. Since Sam is coordinating the Accident Analysis Audit, please coordinate with him on planning the meeting.
- Regards, Ben
~~~~~~~~~~~
Benjamin Beasley Senior Project Manager Advanced Reactor Licensing Branch 1 Office of Nuclear Reactor Regulation 301-415-2062 Benjamin.Beasley@nrc.gov 4.2-6 PSAR Table 4.2-1, Fuel Particle Properties, lists the PyC BAF values as less than or equal to 1.045 which is outside the range of the approved EPRI topical report, EPRI-AR-1-A. As stated in the EPRI topical report, Section 4.3.1, Sufficiently isotropic PyC layers (BAF <= l .035) are able to perform well out to high fast neutron fluences because the irradiation-induced strains and stresses are relaxed to some extent by irradiation-induced creep. What is the basis for exceeding the EPRI topical report PyC BAF value?
4.2-7 Does the peak SiC temperature given in PSAR Table 4.2-6 include peaking factors (1.8 total in PSAR Table 4.5-4) and conservative boundary conditions (i.e., maximum coolant outlet temperature)?
4.2-8 KP-TR-018, Section 3.4.2.1 states, there is negligible failures for peak fuel temperatures up to 1600 C.
4.2-8a Based on PSAR Table 4.2-5, the staff understands the 1600 C to be the SiC coating layer temperature. Is the staffs understanding correct?
4.2-8b Figure 7-5 of Reference 1 (EPRI-AR-1) indicates that SiC failures increase for temperatures above 1600 C. Therefore, its
unclear to the staff what no incremental transient induced failures up to 1600 C means. Please provide additional clarification regarding no incremental transient induced failures up to 1600 C.
4.2-8c KP-TR-018, Section 3.4.2.2 discusses two approaches to determine incremental fuel failures, the transient 1600 C limit and the methodology described in KP-TR-018, Section 4.2 using KP-Bison. PSAR Section 4.2.1 seems to refer only to the KP-Bison methodology where transient induced failures are added to the normal operation in-service failures. Please clarify the intended approach.
4.2-8d In KP-TR-018, Tables A1-1 and A4-3 show no increase in postulated event SiC failures. Do Tables A1-1 and A4-3 use the postulated event temperatures as given by Figures A1-2 and A4-1? If not, what temperatures or assumptions are used?
4.2-8e Does Table A4-4 differ from Table A4-3 due to including manufacturing defects (in addition to in-service failures)?
4.2-9 Are the maximum TRISO temperatures given in KP-TR-018, Figures A1-2 and A4-1 the maximum kernel values? If not, what does the maximum TRISO temperature correspond to?
4.2-10 The initial maximum TRISO temperature in KP-TR-018, Figure A1-2 is approximately 1030 C. The SiC temperature given in PSAR Table 4.2-5 is less than 830 C. Using the kernel to SiC coating layer delta-T of 45 C from KP-TR-011, Table 3-17, the estimated initial transient temperature would be approximately 875 C which is well below 1030 C. Please provide additional information as to why the Figure A1-2 initial maximum TRISO is higher than 875 C?
4.2-11 On PSAR page 4-8 the peak SiC temp is described as provided in Figure 4.2-6 but the staff believe this should refer to Table 4.2-6.
4.2-12 No confirmatory destructive testing is documented in the PSAR.
Review of KP-TR-011, Section 3.9.3, Fuel Pebble Destructive Examination, notes that destructive confirmatory testing for the KP-FHR fuel will be performed. The staff understood that destructive confirmatory testing was being planned for the Hermes fuel. Is destructive testing of the Hermes fuel still planned? If so, why is it not included as confirmatory testing in the PSAR?
Hearing Identifier: KairosPower_CPDocs_Public Email Number: 16 Mail Envelope Properties (BY3PR09MB7361979AAD368C92B1B97C6596F39)
Subject:
Questions for Accident Analysis Audit Sent Date: 4/18/2022 1:13:38 PM Received Date: 4/18/2022 1:13:00 PM From: Beasley, Benjamin Created By: Benjamin.Beasley@nrc.gov Recipients:
"Darrell Gardner" <gardner@kairospower.com>
Tracking Status: None "Cuadrado de Jesus, Samuel" <Samuel.CuadradoDeJesus@nrc.gov>
Tracking Status: None "Schmidt, Jeffrey" <Jeffrey.Schmidt2@nrc.gov>
Tracking Status: None "Drew Peebles" <peebles@kairospower.com>
Tracking Status: None Post Office: BY3PR09MB7361.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3868 4/18/2022 1:13:00 PM image001.gif 4401 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: