COL Docs - Acceptance Review of Southern Nuclear Operating Company'S Request for Alternative: Alternative for IST of Main Turbine Stop & Control Valves (IST-ALT-02)
ML22105A568
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/15/2022
From:
NRC
To:
NRC/NRR/DNRL
References
Download: ML22105A568 (3)


Text

From: Gleaves, Billy Sent: Friday, April 15, 2022 4:04 PM To: Chamberlain, Amy Christine; Eddie Grant - SoCo Contractor (x2edgran@southernco.com)

Cc: Vogtle PEmails; Hall, Victor; Santos, Cayetano; Tseng, Ian; Scarbrough, Thomas; Wong, Yuken; Patton, Rebecca; Miller, Joshua; Wittick, Brian; Karipineni, Nageswara; Coovert, Nicole

Subject:

Acceptance Review of Southern Nuclear Operating Company's Request for Alternative: Alternative for IST of Main Turbine Stop & Control Valves (IST-ALT-02)

Mr. Brian H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.

3535 Colonnade Parkway Birmingham, AL 35243

SUBJECT:

ACCEPTANCE REVIEW OF SOUTHERN NUCLEAR OPERATING COMPANYS REQUEST FOR ALTERNATIVE: ALTERNATIVE REQUIREMENTS FOR MAIN TURBINE SYSTEM VALVE TESTING, UNITS 3 & 4 (EPID NO. L-2022-LLR-0042)

Dear Mr. Whitley:

By letter dated April 8, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22098A144), Southern Nuclear Operating Company (SNC) submitted an alternative request for Vogtle Electric Generating Plant (VEGP), Units 3 & 4. The requested alternative, should it be approved, would change the full stroke testing of the main turbine system valves from quarterly to partial stroke testing on a six month frequency.

The purpose of this letter is to provide the results of the NRC staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the staff to complete its detailed technical review. The acceptance review is also intended to identify whether the submittal has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of the 10 CFR, the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. SNC will be advised of any further information needed to support the staffs detailed technical review by separate correspondence.

SNC has requested staff approval of this alternative by October 8, 2022, a date expected to be prior to the first required quarterly full stroke test of these valves at power. The staff will try to complete its review by this date unless we agree to a different date at a later time due to circumstances beyond our control. The staff estimates that it may take 110 hours0.00127 days <br />0.0306 hours <br />1.818783e-4 weeks <br />4.1855e-5 months <br /> to complete this licensing action.

If you have any questions, please contact me at (301) 415-5848 or bill.gleaves@nrc.gov.

Sincerely, Billy William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy or staff positions and are not binding on the Commission.

Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 633 Mail Envelope Properties (DM6PR09MB4839C5B86BDBD88A9466196A9FEE9)

Subject:

Acceptance Review of Southern Nuclear Operating Company's Request for Alternative: Alternative for IST of Main Turbine Stop & Control Valves (IST-ALT-02)

Sent Date: 4/15/2022 4:04:22 PM Received Date: 4/15/2022 4:04:32 PM From: Gleaves, Billy Created By: Bill.Gleaves@nrc.gov Recipients:

"Vogtle PEmails" <Vogtle.PEmails@usnrc.onmicrosoft.com>

Tracking Status: None "Hall, Victor" <Victor.Hall@nrc.gov>

Tracking Status: None "Santos, Cayetano" <Cayetano.Santos@nrc.gov>

Tracking Status: None "Tseng, Ian" <Ian.Tseng@nrc.gov>

Tracking Status: None "Scarbrough, Thomas" <Thomas.Scarbrough@nrc.gov>

Tracking Status: None "Wong, Yuken" <Yuken.Wong@nrc.gov>

Tracking Status: None "Patton, Rebecca" <Rebecca.Karas@nrc.gov>

Tracking Status: None "Miller, Joshua" <Joshua.Miller@nrc.gov>

Tracking Status: None "Wittick, Brian" <Brian.Wittick@nrc.gov>

Tracking Status: None "Karipineni, Nageswara" <Nageswara.Karipineni@nrc.gov>

Tracking Status: None "Coovert, Nicole" <Nicole.Coovert@nrc.gov>

Tracking Status: None "Chamberlain, Amy Christine" <acchambe@southernco.com>

Tracking Status: None "Eddie Grant - SoCo Contractor (x2edgran@southernco.com)" <x2edgran@southernco.com>

Tracking Status: None Post Office: DM6PR09MB4839.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3478 4/15/2022 4:04:32 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: