Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24032A4701 February 2024Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC
ML24024A02024 January 2024Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures
ML24024A24524 January 20241/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures
ML23320A11218 January 2024NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public CommentLicense Renewal
Subsequent License Renewal
ML23355A27221 December 2023NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request
ML23326A01322 November 2023Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel
ML23318A09514 November 2023Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia FuelAnticipated operational occurrence
Fuel cladding
ML23318A11713 November 2023NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006)High winds
Earthquake
ML23317A07313 November 2023Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.aSurveillance Frequency Control Program
ML23312A2968 November 2023Email - Surry Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST P-3 P-4 Pumps
ML23312A2028 November 2023Relief Request Acceptance Review Results; IST Impracticality P-1 P-2 RHR Containment Pumps
ML23297A23124 October 2023E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia FuelExemption Request
Affidavit
ML23283A32610 October 2023Update Acceptance Review Status Surry TS Change Apply RG 1.97, Rev 3 Instrumentation to Lhsi
ML23265A23022 September 2023Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC
ML23257A20914 September 2023NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LARFLEX
ML23255A27712 September 2023Acceptance of Requested Licensing Action: Surry TS Change, Lhsi Indication and Instrumentation
ML23243A98631 August 2023NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166)FLEX
ML23258A05531 August 2023Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail)Loop seal
Exemption Request
Fuel cladding
ML23219A1607 August 2023003 Radiation Safety Baseline Inspection Information RequestProcess Control Program
ML23199A28318 July 2023Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits
ML23193A95512 July 2023NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029)
ML23187A1126 July 2023TSC Relocation LAR RAIsHigh winds
Earthquake
ML23172A07521 June 2023Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia FuelFuel cladding
ML23171B05220 June 2023NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted)
ML23145A00525 May 2023Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod CladdingExemption Request
ML23145A00425 May 2023Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies
ML23115A30224 April 20234/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints
ML23107A22110 April 2023Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No CommentEarthquake
ML23089A18829 March 2023Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report
ML23075A02315 March 2023NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162Earthquake
ML23068A0248 March 2023RAI Issuance Fuel Handling Trolley LARProbabilistic Risk Assessment
Aging Management
Large early release frequency
Earthquake
Fuel cladding
Fatality
ML23067A2167 March 2023NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code
ML23060A0931 March 2023NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR
ML23059A22828 February 2023NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162)Earthquake
ML23054A24123 February 2023NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado ReclassificationEarthquake
ML23039A1718 February 2023NRR E-mail Capture - Acceptance Review for Technical Support Center (TSC) Relocation (L-2023-LLA-0006)
ML23038A0157 February 2023Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures
ML23024A15224 January 2023Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis
ML23018A16417 January 2023Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email)Incorporated by reference
ML23018A03517 January 2023NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003)
ML22354A03519 December 2022Acceptance Email TSC Relocations LAR
ML22349A21015 December 2022Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment RequestEarthquake
ML23058A1449 December 2022Record of Surry Verbal Relief Request Authorization - V-01 Mechanical Agitation Vavle 1-SI-241Incorporated by reference
ML22342B1478 December 2022NRR E-mail Capture - Acceptance Review for LAR Re NAPS Post LOCA Buffer Change (L-2022-LLA-0162)
ML22342A1007 December 2022Relief Request Acceptance Review Results; Surry ISI Alternative, Prz and SG Welds and Nozzles
ML22335A4841 December 2022NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166)
ML22320A57516 November 2022E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel
ML22298A20525 October 2022Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles