Issue date | Title | Topic | |
---|---|---|---|
ML24032A470 | 1 February 2024 | Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC | |
ML24024A020 | 24 January 2024 | Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures | |
ML24024A245 | 24 January 2024 | 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures | |
ML23320A112 | 18 January 2024 | NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment | License Renewal Subsequent License Renewal |
ML23355A272 | 21 December 2023 | NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request | |
ML23326A013 | 22 November 2023 | Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel | |
ML23318A095 | 14 November 2023 | Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel | Anticipated operational occurrence Fuel cladding |
ML23318A117 | 13 November 2023 | NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) | High winds Earthquake |
ML23317A073 | 13 November 2023 | Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a | Surveillance Frequency Control Program |
ML23312A296 | 8 November 2023 | Email - Surry Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST P-3 P-4 Pumps | |
ML23312A202 | 8 November 2023 | Relief Request Acceptance Review Results; IST Impracticality P-1 P-2 RHR Containment Pumps | |
ML23297A231 | 24 October 2023 | E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel | Exemption Request Affidavit |
ML23283A326 | 10 October 2023 | Update Acceptance Review Status Surry TS Change Apply RG 1.97, Rev 3 Instrumentation to Lhsi | |
ML23265A230 | 22 September 2023 | Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC | |
ML23257A209 | 14 September 2023 | NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR | FLEX |
ML23255A277 | 12 September 2023 | Acceptance of Requested Licensing Action: Surry TS Change, Lhsi Indication and Instrumentation | |
ML23243A986 | 31 August 2023 | NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) | FLEX |
ML23258A055 | 31 August 2023 | Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) | Loop seal Exemption Request Fuel cladding |
ML23219A160 | 7 August 2023 | 003 Radiation Safety Baseline Inspection Information Request | Process Control Program |
ML23199A283 | 18 July 2023 | Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits | |
ML23193A955 | 12 July 2023 | NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) | |
ML23187A112 | 6 July 2023 | TSC Relocation LAR RAIs | High winds Earthquake |
ML23172A075 | 21 June 2023 | Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel | Fuel cladding |
ML23171B052 | 20 June 2023 | NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) | |
ML23145A005 | 25 May 2023 | Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding | Exemption Request |
ML23145A004 | 25 May 2023 | Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies | |
ML23115A302 | 24 April 2023 | 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints | |
ML23107A221 | 10 April 2023 | Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment | Earthquake |
ML23089A188 | 29 March 2023 | Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report | |
ML23075A023 | 15 March 2023 | NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 | Earthquake |
ML23068A024 | 8 March 2023 | RAI Issuance Fuel Handling Trolley LAR | Probabilistic Risk Assessment Aging Management Large early release frequency Earthquake Fuel cladding Fatality |
ML23067A216 | 7 March 2023 | NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code | |
ML23060A093 | 1 March 2023 | NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR | |
ML23059A228 | 28 February 2023 | NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) | Earthquake |
ML23054A241 | 23 February 2023 | NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification | Earthquake |
ML23039A171 | 8 February 2023 | NRR E-mail Capture - Acceptance Review for Technical Support Center (TSC) Relocation (L-2023-LLA-0006) | |
ML23038A015 | 7 February 2023 | Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures | |
ML23024A152 | 24 January 2023 | Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis | |
ML23018A164 | 17 January 2023 | Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) | Incorporated by reference |
ML23018A035 | 17 January 2023 | NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) | |
ML22354A035 | 19 December 2022 | Acceptance Email TSC Relocations LAR | |
ML22349A210 | 15 December 2022 | Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request | Earthquake |
ML23058A144 | 9 December 2022 | Record of Surry Verbal Relief Request Authorization - V-01 Mechanical Agitation Vavle 1-SI-241 | Incorporated by reference |
ML22342B147 | 8 December 2022 | NRR E-mail Capture - Acceptance Review for LAR Re NAPS Post LOCA Buffer Change (L-2022-LLA-0162) | |
ML22342A100 | 7 December 2022 | Relief Request Acceptance Review Results; Surry ISI Alternative, Prz and SG Welds and Nozzles | |
ML22335A484 | 1 December 2022 | NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166) | |
ML22320A575 | 16 November 2022 | E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel | |
ML22298A205 | 25 October 2022 | Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles |