Updated Inspection Plan for the Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2021005 and 05000412/2021005)
ML21243A105
Person / Time
Site: Beaver Valley
Issue date: 09/01/2021
From: Matt Young
Division of Operating Reactors
To: Grabnar J
Energy Harbor Nuclear Corp
Young M
References
IR 2021005
Download: ML21243A105 (6)


Text

September 1, 2021

SUBJECT:

UPDATED INSPECTION PLAN FOR THE BEAVER VALLEY POWER STATION, UNITS 1 AND 2 (REPORT 05000334/2021005 AND 05000412/2021005)

Dear Mr. Grabnar:

The enclosed inspection plan lists the inspections scheduled through June 30, 2023, for Beaver Valley Power Station (Beaver Valley), Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process (ROP). Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling. The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.

Additionally, during this period the NRC will schedule an additional inspection per a revised version of Temporary Instruction 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electrical Power Systems (NRC Bulletin 2012-01), for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ML19163A176), which included an option for relying on annunciation and operator manual actions instead of automatic protective features to isolate a power supply affected by an open phase condition. Licensees will be individually notified when the NRC schedules these inspections.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5205 with any questions you have regarding this letter.

Sincerely, Matthew R. Young, Chief Projects Branch 5 Division of Operating Reactor Safety

Docket Nos. 05000334 and 05000412 License Nos. DPR-66 and NPF-73

Enclosure:

Beaver Valley Inspection Plan

cc w/encl: Distribution via ListServ Matthew R.

Young Digitally signed by Matthew R. Young Date: 2021.09.01 07:00:32 -04'00'

ML21243A105

SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available

OFFICE RI/DORS RI/DORS

NAME LCline MYoung

DATE 8/26/21 8/27/21

Beaver Valley 07/01/2021 - 06/30/2023 Unit Start End Activity CAC Title Staff Count Rad Safety Inspection - ALARA

1, 2 7/8/2021 7/20/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls MATERIAL CONTROL AND ACCOUNTABILITY

1, 2 7/26/2021 7/29/2021 IP 71130.11 000742 Material Control and Accounting (MC&A)

Access Control, Protective Strategy, TSR, SPR

1, 2 8/2/2021 8/6/2021 IP 71130.02 000734 Access Control 1, 2 8/2/2021 8/6/2021 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 8/2/2021 8/6/2021 IP 71130.09 001656 Security Plan Changes 1, 2 8/2/2021 8/6/2021 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 8/2/2021 8/6/2021 IP 71151 001338 Performance Indicator Verification Fire Protection - Beaver Valley

1, 2 8/30/2021 9/3/2021 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1, 2 9/13/2021 9/17/2021 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

TI-194 Open Phase Condition Inspection - BV

1, 2 9/13/2021 9/17/2021 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)

Inservice Inspection - Beaver Valley Unit 2

2 10/25/2021 11/12/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

DBAI - Power Operated Valve - Beaver Valley

1, 2 3/14/2022 4/1/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - BV

1, 2 3/14/2022 3/18/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 4/4/2022 4/8/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing FY22 BV2 Initial Operator Licensing Exam

2 3/20/2022 3/25/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

4/17/2022 4/29/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

ISFSI - SFP Ops Dry Run & Review 72.212 - BV

1, 2 5/2/2022 5/6/2022 IP 60854 001000 Preoperational Testing Of An ISFSI 1, 2 5/2/2022 5/6/2022 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations Triennial Heat Sink - Beaver Valley

1, 2 5/9/2022 5/13/2022 IP 71111.07T 000700 Heat Sink Performance RP Rad Instrumentation 71124.05

Prepared on 8/20/2021 10:53:04 AM 1 of 3 IP 22b Site Inspection Activity Plan Enclosure

1, 2 5/23/2022 5/27/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation EP EXERCISE INSPECTION - BEAVER VALLEY

1, 2 6/6/2022 6/10/2022 IP 71114.01 000716 Exercise Evaluation 1, 2 6/6/2022 6/10/2022 IP 71151 001397 Performance Indicator Verification BV1 Requal Inspection with P/F Results

1 7/10/2022 7/15/2022 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance

7/10/2022 7/15/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RP Rad Environmental Monitoring Program (REMP) 71124.07

1, 2 7/11/2022 7/15/2022 IP 71124.07 000731 Radiological Environmental Monitoring Program 50.59 Inspection - Beaver Valley

1, 2 7/17/2022 7/23/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments RP Rad Waste and Transportation 71124.08

1, 2 9/19/2022 9/23/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation ISI Inspection - Beaver Valley Unit 1 1R28

1 10/17/2022 10/28/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP Rad Hazards and Control 71124.01

1, 2 10/17/2022 10/21/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Access Auth, Access Control, FFD, SPR, PI-BV

1, 2 12/5/2022 12/9/2022 IP 71130.01 000733 Access Authorization 1, 2 12/5/2022 12/9/2022 IP 71130.02 000734 Access Control 1, 2 12/5/2022 12/9/2022 IP 71130.08 000740 Fitness For Duty Program 1, 2 12/5/2022 12/9/2022 IP 71130.09 001656 Security Plan Changes 1, 2 12/5/2022 12/9/2022 IP 71151 001338 Performance Indicator Verification PI&R Biennial Team Inspection - BV

1, 2 1/30/2023 2/3/2023 IP 71152B 000747 Problem Identification and Resolution 1, 2 2/13/2023 2/17/2023 IP 71152B 000747 Problem Identification and Resolution RP - In-Plant Airborne 71124.03 and Occupational Dose Assessment 71124.04

1, 2 3/6/2023 3/10/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 3/6/2023 3/10/2023 IP 71124.04 000728 Occupational Dose Assessment Inservice Inspection - BV2R23

2 4/16/2023 4/29/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP Rad Hazards and Controls 71124.01

1, 2 4/24/2023 4/28/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls BV2 Requal Inspection with P/F Results

Prepared on 8/20/2021 10:53:04 AM 2 of 3 IP 22b Site Inspection Activity Plan

6/4/2023 6/16/2023 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance

6/4/2023 6/16/2023 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Prepared on 8/20/2021 10:53:04 AM 3 of 3 IP 22b Site Inspection Activity Plan