|
---|
Category:Letter
MONTHYEARML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule IR 05000266/20234022023-11-14014 November 2023 Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval IR 05000266/20230032023-10-16016 October 2023 Integrated Inspection Report 05000266/2023003 and 05000301/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23243A9102023-09-0606 September 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors IR 05000266/20235012023-08-29029 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 ML23208A2262023-08-28028 August 2023 Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - Letter ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections IR 05000266/20230022023-07-18018 July 2023 Integrated Inspection Report 05000266/2023002 and 05000301/2023002 IR 05000266/20234012023-07-13013 July 2023 Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval2023-06-27027 June 2023 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval ML23171B1062023-06-21021 June 2023 Info Meeting with a Question and Answer Session to Discuss NRC 2022 EOC Plant Performance Assessment of Ptbh, Units 1 and 2 ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response2023-06-0101 June 2023 Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal ML23118A1762023-05-0404 May 2023 Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191 IR 05000266/20230012023-05-0101 May 2023 Integrated Inspection Report 05000266/2023001 and 05000301/2023001 ML23114A1222023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-2023-058, 2022 Annual Monitoring Report2023-04-10010 April 2023 2022 Annual Monitoring Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications 2024-02-05
[Table view] Category:Map
MONTHYEARML21033B0902021-02-0808 February 2021 Letter to EPA ML21022A3162021-02-0101 February 2021 Request for Scoping Comments Concerning the Environmental Review of Point Beach SLRA (3) ML21022A3152021-02-0101 February 2021 Request for Scoping Comments Concerning the Environmental Review of Point Beach SLRA (5) ML21022A3122021-02-0101 February 2021 Request for Scoping Comments Concerning the Environmental Review of Point Beach SLRA ML21033A4022021-01-22022 January 2021 NextEra Energy Point Beach - Point Beach Nuclear Plant - Units 1 and 2 Subsequent License Renewal ML0412604142004-05-0505 May 2004 Encl. 1 (Maps) Figure 3-2: Transmission Line Map, and Figure 3-1: Facility Layout 2021-02-08
[Table view] |
Text
February 8, 2021 Mr. Jason Knutson Wastewater Section Chief Wisconsin Department of Natural Resources P.O. Box 7921 Madison, WI 53707-7921 Jason.Knutson@wisconsin.gov
SUBJECT:
CLEAN WATER ACT SECTION 401 REASONABLE PERIOD OF TIME CONCERNING THE POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 SUBSEQUENT LICENSE RENEWAL APPLICATION
Dear Mr. Knutson:
By letter dated November 16, 2020 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML20329A292), NextEra Energy Point Beach, LLC (NextEra) submitted to the U.S. Nuclear Regulatory Commission (NRC) an application for subsequent license renewal (SLR) of Renewed Facility Operating License Nos. DPR-24 and DPR-27 for Point Beach Nuclear Plant, Units 1 and 2 (Point Beach), respectively. The Point Beach units are pressurized water reactors designed by Westinghouse Electric Corporation and are located on the shore of Lake Michigan, in the Town of Two Creeks, Manitowoc County, Wisconsin, approximately 15 miles north-northeast of Manitowoc (see Enclosures 1 and 2). The SLR application seeks to extend for an additional 20 years the renewed facility operating license for Unit 1 to midnight on October 5, 2050, and the renewed facility operating license for Unit 2 to midnight on March 8, 2053. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 54.29, the NRC may grant the SLR application if it finds that specific safety and environmental requirements are satisfied. In accordance with 10 CFR 51.95(c), the NRC will prepare an environmental impact statement regarding the SLR application as a supplement to NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants, dated June 2013. Background information and milestones associated with the NRCs review of the SLR application is available at:
https://www.nrc.gov/reactors/operating/licensing/renewal/applications/point-beach-subsequent.html.
By letter dated January 22, 2021 (ADAMS Accession No. ML21033A402), NextEra requested confirmation from the Wisconsin Department of Natural Resources, Division of Environmental Management that a waiver to the Clean Water Act section 401 Water Quality Certification requirement applicable to Point Beachs license renewal is provided by Wis. Adm. Code NR 299.01(2)(c) given that Point Beach holds Wisconsin Pollutant Discharge Elimination System permits granted under the permit authority of Wis. Adm. Code NR 283.
J. Knutson In accordance with Title 40 Code of Federal Regulations (40 CFR) Part 121.6, Establishing the reasonable period of time, the NRC staff is providing the following information. The NRC staff received the NextEra letter dated January 22, 2021 on January 26, 2021. The reasonable period of time to act on the NextEra certification request is 6 months after the NRC staffs receipt of the request. Accordingly, unless the NRC extends this 6-month time period at the request of the certifying authority or NextEra, July 26, 2021 is, per 40 CFR 121.6(b)(3), [t]he date upon which waiver will occur if the certifying authority fails or refuses to act on the certification request.
The NRC cannot issue subsequent renewed facility operating licenses unless the SLR applicant has either been granted a Clean Water Act section 401 Water Quality Certification from the responsible certifying agency, or the certifying agency has issued a waiver or similar documentation that water quality certification is not required or does not apply. The NRC recognizes that a number of states have their own policy and regulatory requirements governing the Clean Water Act section 401 certification process, such as integrating the process with their National Pollutant Discharge Elimination System permitting process.
If you have any questions concerning the NRCs review of NextEras SLR application or this letter, please contact Mr. Kevin Folk at 301-415-6944 or via e-mail at Kevin.Folk@nrc.gov.
Sincerely, Signed by Elliott, Robert on 02/08/21 Robert B. Elliott, Chief Environmental Review License Renewal Branch Division of Rulemaking, Environmental and Financial Support Office of Nuclear Material Safety and Safeguards Docket Nos. 50-266 and 50-301
Enclosures:
- 1. Area Map, 50-mile radius
- 2. Point Beach Site Area Map cc: Listserv
Area Map, 50-mile radius Source: Modified from PBN Environmental Report Enclosure 1
Point Beach Site Area Map Source: PBN Environmental Report Enclosure 2
Ltr ML21033B090 NMSS/REFS NMSS/REFS NMSS/REFS NMSS/REFS OFFICE
/ERLRB /ERLRB /ERLRB /ERLRB NAME KFolk KF PClark PC KFolk KF RElliott RE DATE Feb 3, 2021 Feb 8, 2021 Feb 8, 2021 Feb 8, 2021