MONTHYEARML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-2024-001, Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-01-26026 January 2024 Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24005A3242024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0040 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23352A2752024-01-23023 January 2024 Issuance of Amendment Nos. 274 and 276 Regarding Revision to Technical Specification 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-174, Subsequent License Renewal Application - Third Annual Update2023-12-13013 December 2023 Subsequent License Renewal Application - Third Annual Update L-2023-176, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-159, Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 3 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks and Security Event Notifications Final Rule IR 05000266/20234022023-11-14014 November 2023 Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 ML23279A0672023-11-0909 November 2023 Issuance of Relief Request I6 RR 02 - Examination of the Unit 2 Steam Generator Feedwater Nozzle Extension to Nozzle Weld Sixth 10 Year Inservice Inspection Program Interval IR 05000266/20230032023-10-16016 October 2023 Integrated Inspection Report 05000266/2023003 and 05000301/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published L-2023-128, License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program2023-09-19019 September 2023 License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23243A9102023-09-0606 September 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors IR 05000266/20235012023-08-29029 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 ML23208A2262023-08-28028 August 2023 Exemption from the Requirements of 10 CFR 50,46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors (EPID L-2022-LLE-0026) - Letter ML23208A0952023-08-28028 August 2023 Issuance of Amendment Nos. 273 and 275 Regarding Revising Licensing Basis to Address Generic Safety Issue-191 and Respond to Generic Letter 2004-02 Using a Risk Informed Approach IR 05000266/20230052023-08-24024 August 2023 Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) ML23160A0642023-08-21021 August 2023 Issuance of Amendment Nos. 272 and 274 Regarding Revision to Use Beacon Power Distribution Monitoring System L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections IR 05000266/20230022023-07-18018 July 2023 Integrated Inspection Report 05000266/2023002 and 05000301/2023002 IR 05000266/20234012023-07-13013 July 2023 Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-2023-088, 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval2023-06-27027 June 2023 10 CFR 50.55a Requests, Relief Requests I6-RR-1, I6-RR-2, and I6-RR-3 Sixth Ten-Year Inservice Inspection Program Interval ML23171B1062023-06-21021 June 2023 Info Meeting with a Question and Answer Session to Discuss NRC 2022 EOC Plant Performance Assessment of Ptbh, Units 1 and 2 ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 L-2023-073, Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response2023-06-0101 June 2023 Subsequent License Renewal Application, Second Annual Update Request for Additional Information Set 1 Response ML23103A1332023-06-0101 June 2023 Issuance of Amendment Nos. 271 and 273 Regarding Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal ML23118A1762023-05-0404 May 2023 Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191 IR 05000266/20230012023-05-0101 May 2023 Integrated Inspection Report 05000266/2023001 and 05000301/2023001 ML23114A1222023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-2023-058, 2022 Annual Monitoring Report2023-04-10010 April 2023 2022 Annual Monitoring Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications 2024-02-05
[Table view] Category:Map
MONTHYEARML21033B0902021-02-0808 February 2021 Letter to EPA ML21022A3162021-02-0101 February 2021 Request for Scoping Comments Concerning the Environmental Review of Point Beach SLRA (3) ML21022A3152021-02-0101 February 2021 Request for Scoping Comments Concerning the Environmental Review of Point Beach SLRA (5) ML21022A3122021-02-0101 February 2021 Request for Scoping Comments Concerning the Environmental Review of Point Beach SLRA ML21033A4022021-01-22022 January 2021 NextEra Energy Point Beach - Point Beach Nuclear Plant - Units 1 and 2 Subsequent License Renewal ML0412604142004-05-0505 May 2004 Encl. 1 (Maps) Figure 3-2: Transmission Line Map, and Figure 3-1: Facility Layout 2021-02-08
[Table view] |
Text
February 1, 2021 Ms. Daina Penkiunas State Historic Preservation Officer Wisconsin Historical Society 816 State Street Madison, WI 53706
SUBJECT:
REQUEST FOR SCOPING COMMENTS CONCERNING THE ENVIRONMENTAL REVIEW OF POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 SUBSEQUENT LICENSE RENEWAL APPLICATION (DOCKET NUMBER: 50-266 and 50-301)
Dear Ms. Penkiunas:
The U.S. Nuclear Regulatory Commission (NRC) is conducting a review of the environmental effects of renewing the operating licenses for Point Beach Nuclear Plant, Units 1 and 2 (PBN).
PBN is operated by NextEra Energy Point Beach, LLC (NEPB) and is located in Manitowoc County, Wisconsin on the western shore of Lake Michigan (see Enclosure 1). NEPB submitted an application for the subsequent renewal of PBN operating licenses in a letter dated November 16, 2020, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 54.
The NRC has defined subsequent license renewal to be the period of extended operation from 60 years to 80 years. The Atomic Energy Act of 1954, as amended, authorizes the NRC to issue 40-year initial licenses, and upon application and approval, renew licenses for nuclear power reactors. The NRCs regulations limit these renewals to 20-year increments. Approval of a renewed license is based on the outcome of a safety and environmental review. The NRC issued renewed PBN, Units 1 and 2 operating licenses in 2005; the current Unit 1 operating license expires on October 5, 2030, and the Unit 2 operating license expires on March 8, 2033.
The requested renewals would extend the operating license expiration dates for PBN, Units 1 and 2, to October 5, 2050 and March 8, 2053, respectively.
As part of the NRCs license renewal review, a site-specific supplement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG-1437, is prepared in accordance with 10 CFR Part 51, the NRCs environmental protection regulations.
These regulations also implement Section 102(2) of the National Environmental Policy Act of 1969, as amended (NEPA). In accordance with 36 CFR 800.8(c), the NRC intends to comply with Section 106 of the National Historic Preservation Act of 1966, as amended (NHPA),
through the NEPA process. Accordingly, the NRC is inviting parties who may be interested in the proposed action to consult on this matter. The purpose of this letter is to initiate Section 106 consultation with the Wisconsin Historical Society under NHPA.
D. Penkiunas 2 In the context of NHPA, the NRC has determined that the area of potential effects (APE) for this subsequent license renewal is the area at the power plant site and its immediate environs that may be impacted by ongoing routine maintenance and operational activities during the license renewal term (see Enclosure 2). The APE may extend beyond the immediate PBN environs if NEPB maintenance and operational activities affect offsite historic properties (see Enclosure 3).
This determination is made irrespective of ownership or control of the lands of interest.
Although Units 1 and 2 will exceed 50 years of age during the initial license renewal stage, no survey has been conducted to determine their eligibility for listing in the National Register of Historic Places. We would like to know whether an eligibility determination for Units 1 and 2 should be conducted as part of the subsequent license renewal undertaking.
Please provide any comments that you may have on the scope of the environmental review within 30 days of the date of this letter. Written comments should be submitted by mail to:
ATTN: Program Management, Announcements and Editing Staff Office of Administration Mail Stop: TWFN-7A60M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Electronic comments may be submitted to the NRC by accessing www.regulations.gov and searching for Docket ID NRC 2020-0277. Because there are limited personnel in NRC buildings at this time due to the COVID-19 public health emergency, the preferred method for providing your comments is through regulations.gov or through the NRC staff email contact listed below.
The NRC will hold a public environmental scoping webinar on February 17, 2021 at 2:00 p.m. to 4:00 p.m. eastern time. The webinar will be held online and will offer a telephone line for members of the public to submit comments. The public webinar information is as follows:
Microsoft Teams Meeting: Click here to join the meeting Telephone Bridgeline: 800-369-1750 Bridgeline Passcode: 4187785 The application is available through the web-based version of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible at https://www.nrc.gov/reading-rm/adams.html. The environmental report portion of the application is listed under ADAMS Accession No. ML20329A248. The NRC expects to publish a draft Supplemental Environmental Impact Statement in October 2021. The NRC will forward the draft supplement to you for your review and comment. This draft supplement will include identification of historic properties, assessment of impacts, and a preliminary determination.
After consideration of public comments received, the NRC plans to issue the final supplement, in June 2022.
D. Penkiunas 3 If you have any questions concerning the NRCs license renewal review, please contact Ms. Nancy Martinez, at 630-829-9734 or via e-mail at Nancy. Martinez@nrc.gov.
Sincerely, Signed by Elliott, Robert on 02/01/21 Robert B. Elliott, Chief Environmental Review License Renewal Branch Division of Rulemaking, Environment and Financial Support Office of Nuclear Material Safety and Safeguards Docket Nos: 50-266 and 50-301
Enclosures:
- 1. Area Map, 50-mile radius
- 2. PBN Site Area Map
- 3. Area Map, 6-mile radius cc: Listserv Jen Davel Deputy State Historic Preservation Officer Wisconsin Historical Society 816 State Street Madison, WI 53706 Tyler Howe Historic Preservation Compliance Supervisor 816 State Street.
Madison, WI 53706
Area Map, 50-mile radius Source: Modified from PBN Environmental Report Enclosure 1
PBN Site Area Map Source: PBN Environmental Report Enclosure 2
Area Map, 6-mile radius Source: Modified from PBN Environmental Report Enclosure 3
ML21022A325; Ltr ML21022A316 OFFICE NMSS/REFS/ERLRB NMSS/REFS/ERLRB NMSS/REFS/ERLRB NAME NMartinez NM PClark PC RElliott RE DATE Jan 25, 2021 Jan 28, 2021 Feb 1, 2021