Letter Sequence Draft RAI |
---|
EPID:L-2020-LLA-0051, New York State Motion for Leave to Amend Contentions NY-2 and NY-3 (Approved, Closed) |
Results
Other: ML21092A091, ML21194A408, ML21231A182, ML21314A218, ML21346A000, ML21363A165, NL-20-021, Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device, RS-21-077, License Amendment to Revise Technical Specification 3.7.9, Ultimate Heat Sink
|
MONTHYEARNL-20-021, Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-03-24024 March 2020 Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device Project stage: Other ML20084Q1912020-03-24024 March 2020 New York State Motion for Leave to Amend Contentions NY-2 and NY-3 Project stage: Request ML20108E9482020-04-17017 April 2020 Acceptance Review Determination for Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device Project stage: Acceptance Review ML20184A0012020-07-0606 July 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21363A1582020-07-31031 July 2020 E-mail from A. Peterson,Nyserda to R. Guzman, NRC, Informal Questions Indian Point Unit 3, HI-LIFT Crane License Amendment Request Project stage: Request ML20233B0152020-08-20020 August 2020 Request for Additional Information (E-mail Dated 8/20/20) License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device Project stage: RAI ML20268C2352020-09-24024 September 2020 Request for Additional Information (E-mail Dated 9/24/20) License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device Project stage: RAI NL-20-070, Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-10-0202 October 2020 Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device Project stage: Response to RAI ML21363A1602020-10-22022 October 2020 E-mail from A. Peterson, NYSERDA, to R. Guzman, NRC, Informal Questions Indian Point Unit 3, HI-LIFT Crane License Amendment Request Project stage: Request NL-20-078, Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-11-0909 November 2020 Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device Project stage: Response to RAI ML21013A0142020-12-21021 December 2020 Clarification Call for Draft RAIs (E-mail Dated 12/21/20) License Amendmet Request to Revise Licensing Basis for New Auxiliary Lifting Device Project stage: Draft RAI ML21013A0152021-01-12012 January 2021 Draft Request for Additional Information (E-mail Dated 1/12/2021) License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device Project stage: Draft RAI ML21019A5672021-01-19019 January 2021 Second Round Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device Project stage: RAI ML21363A1642021-01-19019 January 2021 E-mail from A. Peterson, NYSERDA, to R. Guzman, NRC, Informal Questions Indian Point Unit 3, HI-LIFT Crane License Amendment Request Project stage: Request NL-21-014, Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2021-01-26026 January 2021 Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device Project stage: Request ML21060B6022021-03-11011 March 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21078A5102021-03-19019 March 2021 E-mail from P. Couture to R. Guzman) Hi-Lift Crane Proposed License Amendment Request Confirmatory Information Project stage: Request ML21363A1652021-03-23023 March 2021 3/23/2021 E-mail from R. Guzman, NRC, to A. Peterson, NYSERDA, State Comments for IP3 HI-LIFT Crane License Amendment Request Project stage: Other ML21092A0912021-04-0202 April 2021 E-mail NRR Review Hour Estimate Change Supporting the Hi-Lift Crane Proposed License Amendment Request Review Project stage: Other ML21096A3332021-04-0606 April 2021 E-mail Dated 4/6/2021, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device Project stage: Draft Approval ML21111A3612021-04-21021 April 2021 4/21/2021 Letter from A. Peterson (NYSERDA) to R. Guzman (Nrc), New York State Comments Indian Point Energy Center Unit 3 License Amendment Request (HI-LIFT Crane) Project stage: Request ML21112A2672021-04-22022 April 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (Public Redacted Version) Project stage: RAI NL-21-039, Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary2021-05-20020 May 2021 Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Project stage: Response to RAI ML21194A4082021-07-13013 July 2021 (7-13-2021) E-mail NRR Review Hour Estimate Change Supporting the Hi-Lift Crane Proposed License Amendment Request Review Project stage: Other RS-21-077, License Amendment to Revise Technical Specification 3.7.9, Ultimate Heat Sink2021-08-0202 August 2021 License Amendment to Revise Technical Specification 3.7.9, Ultimate Heat Sink Project stage: Other ML21231A1822021-08-26026 August 2021 Unit, No. 3 - Audit Plan in Support of Review of License Amendment Request Regarding the Installation and Use of a New Auxiliary Lifting Device Project stage: Other ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) Project stage: RAI ML21346A0002021-12-16016 December 2021 Unit, No. 3 - Regulatory Audit Summary Concerning License Amendment Request to Install and Use a New Auxiliary Lifting Device Project stage: Other ML22003A1932022-01-0303 January 2022 Response to Requests for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device Project stage: Response to RAI ML21314A2182022-01-18018 January 2022 Audit Plan in Support of Review of License Amendment Request Regarding the Ultimate Heat Sink Project stage: Other ML22028A1032022-01-28028 January 2022 E-mail Dated 1/28/2022, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device Project stage: Draft Approval ML21091A3052022-02-28028 February 2022 Issuance of Amendment No. 272 Revision to Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device (EPID L-2020-LLA-0051) (Non-Proprietary) Project stage: Approval 2021-12-03
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23341A2002023-12-0707 December 2023 Email - Indian Point Energy Center Generating Units 1, 2, and 3 Implementation Notice of Amendment No. 67, 300 and 276 to Independent Spent Fuel Storage Installation Only Emergency Plan (Ioep) ML23332A0802023-11-0808 November 2023 Email from State of New York on the Revised License Amendment for Indian Point Energy Center ISFSI Only Emergency Plan ML23325A1632023-11-0808 November 2023 State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23331A9542023-11-0808 November 2023 Email - State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23144A3452023-05-25025 May 2023 Adam Kahn of Monsey, New York Email Against Treated Water Release from Indian Point Site ML23144A3442023-05-25025 May 2023 Peggy Kurtz of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23144A3392023-05-25025 May 2023 David Morris of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3502023-05-25025 May 2023 Dan Kwilecki of Montebello, New York Email Against Treated Water Release from Indian Point Site ML23144A3422023-05-25025 May 2023 Peter Duda of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3382023-05-25025 May 2023 Dawn Giambalvo of Jersey City, New Jersey Email Against Treated Water Release from Indian Point Site ML23136B1622023-05-15015 May 2023 Town of North Salem, County of Westchester, New York Board Resolution Letter Regarding Treated Water Release from Indian Point Site ML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML23055A1112023-02-23023 February 2023 Alyse Peterson Email- NYSERDA No Comments on Indian Point Unit 2 - Regarding Holtec License Amendment Request to Revise Permanently Defueled Technical Specifications and Staffing Requirements with Spent Fuel Transfer to ISFSI (Dockets 50-24 ML23049A0032023-02-14014 February 2023 NRC Acceptance Email to Holtec for License Amendment Request for Approval of New ISFSI-Only Emergency Plan and Associated EAL Scheme ML22313A1682022-11-0909 November 2022 NRC Response to Updates to the Proposed Amended IP2 Master Trust ML22308A0912022-11-0303 November 2022 Email Acknowledgement for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22276A1642022-09-29029 September 2022 New York State Revised Draft EA Response E-Mail ML22271A8492022-09-28028 September 2022 E-Mail Transmitting Revised Indian Point Exemption Draft EA ML22269A3452022-09-22022 September 2022 Email Objection to Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2, EPID L-2022-LLA-0072 ML22259A1992022-09-0202 September 2022 Acceptance for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22265A0142022-08-31031 August 2022 Email Acknowledgement for Amended and Restated Holtec IP3 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 3 ML22242A2592022-08-19019 August 2022 E-mail from K. Sturzebecher, NRC, to B. Noval, HDI, Acknowledgement for Amended and Restated Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2 ML22228A1332022-08-0909 August 2022 Acknowledgement for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22215A0432022-08-0101 August 2022 E-Mail Transmitting NYS NSA Exemption Comments & Draft EA Review Completion ML22208A0292022-07-19019 July 2022 E-Mail Transmitting Indian Point Exemption Draft EA ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22103A2432022-04-13013 April 2022 E-mail - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0342022-04-13013 April 2022 E-mail from Z. Cruz, NRC to J. Fleming, Holtec - Request for Additional Information Related to Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML22028A1032022-01-28028 January 2022 E-mail Dated 1/28/2022, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device ML22038A1592022-01-24024 January 2022 NRR E-mail Capture - (External_Sender) 2021 IPEC Annual Sturgeon Impingement Report ML22006A0442022-01-0505 January 2022 Email from Z Cruz to J Fleming Request for Additional Information - HDI Indian Point Post-Shutdown Decommissioning Activities Report ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML21266A2972021-08-18018 August 2021 8/18/2021 E-mail from H. Specter to R. Guzman Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting on July 29, 2021 ML21225A6142021-08-0909 August 2021 Email from NRC to the Tuscarora Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5682021-08-0909 August 2021 Email from NRC to the Stockbridge-Munsee Community Band of Mohican Indians Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5012021-08-0909 August 2021 Email from NRC to the Shinnecock Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21224A3032021-08-0909 August 2021 Email from NRC to the Mashantucket Pequot Tribe of Connecticut Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4252021-08-0909 August 2021 Email from NRC to the Oneida Nation of Wisconsin Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A3142021-08-0606 August 2021 Email from NRC to the Oneida Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4402021-08-0606 August 2021 Email from NRC to the Onondaga Nation of Wisconsin Announcing the IPEC PSDAR Meeting on August 18, 2021 ML21225A5462021-08-0606 August 2021 Email from NRC to the St. Regis Mohawk Tribe Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5352021-08-0606 August 2021 Email from NRC to the Tonawanda Band of Seneca Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21266A2942021-07-25025 July 2021 E-mail from Paul Blanch to NRC (N. Sheehan, D. Screnci) Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting, July 29, 2021 ML21197A2002021-07-16016 July 2021 (E-mail 7/16/2021) NRC Staff Assessment and RAI Closeout HDI Fleet Decommissioning Quality Assurance Program and Indian Point Energy Center Quality Assurance Program Manual ML21194A4082021-07-13013 July 2021 (7-13-2021) E-mail NRR Review Hour Estimate Change Supporting the Hi-Lift Crane Proposed License Amendment Request Review 2023-05-25
[Table view] |
Text
From: Guzman, Richard To: Gaston, Ronald William; Schrage, John Cc: Mirzai, Mahvash Bcc: Guzman, Richard
Subject:
RE: Follow-up from Entergy - HI-LIFT RAI Clarification Call Date: Monday, December 21, 2020 7:36:00 PM John and Ron, The technical staff looked over the draft response and determined the two revised responses are not adequate as described below:
Specifically, the two revised responses are not adequate because they do not completely address the necessary quality assurance, acceptance criteria, and standard or method of analysis.
With respect to RAI 1.b, the response proposed a design verification through a HOLTEC evaluation of design documents to ASME B30.1. The problem with that approach is that the design criteria in ASME B30.1 for many structures and components are established by the manufacturer, so it is somewhat of a circular argument.
Another problem area for this RAI is that the discussion suggests that critical load bearing welds (i.e., welds whose failure could cause the load to drop) are included in the strand jack design. While that is acceptable for commercial use, the ASME NOG-1 standard prohibits inclusion of critical load bearing welds in the hoist mechanism and the applicant claims to meet that standard.
The response to RAI 3 is more incomplete because there are no drawings or supporting information addressing the design of the hydraulic system. However, beyond the incomplete nature of the response, it is not clear that an electrical interlock of the type discussed would resolve single failure concerns. For example, the interlock appears to prevent electrical power being applied to both upper and lower mini-jack control valves to open, but does not address the potential for a mechanical failure of one control valve causing it to stick open plus intended actuation of the other control valve to allow both mini-jacks to unseat the upper and lower wedges simultaneously.
Also, the draft is incomplete because it references additions to the proprietary document HI-2188549 that were not included with the draft response.
This is not an exhaustive list of the issues with the proposed approach, but the response needs to address all aspects of design (quality, acceptance criteria, and analysis methods) to demonstrate that the strand jack is reasonably reliable to be considered single-failure-proof.
You can contact me next week if youre available to discuss Entergys intended plan for resolving the stated insufficiencies and next steps. Recognizing that many of the individuals supporting this LAR / RAI response may still be on holiday break/leave, we can also target the week of Jan 4th to discuss the proposed path forward and have a follow-on clarification call if needed to go over any of the items above that may not be clear.
- Thanks, Rich Guzman Sr. PM, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Office: O-9C7 l Phone: (301) 415-1030 Richard.Guzman@nrc.gov From: Schrage, John <jschrag@entergy.com>
Sent: Friday, December 18, 2020 11:34 AM To: Guzman, Richard <Richard.Guzman@nrc.gov>
Subject:
[External_Sender] RE: Follow-up from Entergy - HI-LIFT RAI Clarification Call
- Rich, Thank you for the voice mail response message yesterday. In accordance with the proposed schedule specified in the 03-Dec-2020 email message below, Entergy has developed a draft response to the two clarification questions that were discussed on the 01-Dec-2020 teleconference with Mr. Jones (i.e., concerning Entergys response to RAI-1.b and RAI-3). The attached pdf file provides the two draft responses.
For sake of completeness, the two original RAIs are restated, followed, in order by:
- 1. Entergys initial response transmitted on 09-Nov-2020 (i.e., ADAMS Accession Nos.
ML20314A355 and ML20314A356);
- 2. Mr. Jones requests for clarification transmitted to Entergy on 19-Nov-2020 and discussed on 01-Dec-2020. This text is highlighted yellow;
- 3. Entergys response to each clarification request - also highlighted yellow.
Please note that each page is clearly marked with a DRAFT watermark, as well as HOLTEC PROPRIETARY AND CONFIDENTIAL. Therefore, the formal submittal on 05-Jan-2021 will include a redacted version and associated affidavit.
In addition, I would like to request a return email to verify receipt.
Thank you, John L. Schrage Senior Staff Engineer - Licensing Corporate Regulatory Assurance Entergy Services, Inc.
630-244-8848 (mobile)
From: Schrage, John Sent: Thursday, December 03, 2020 11:15 AM To: Guzman, Richard <Richard.Guzman@nrc.gov>
Subject:
RE: Follow-up from Entergy - HI-LIFT RAI Clarification Call Thanks Rich. I plan to bird dog the Holtec people as they proceed, and communicate with you frequently. We both know that this time of the year plays havoc with schedules.
From: Guzman, Richard <Richard.Guzman@nrc.gov>
Sent: Thursday, December 03, 2020 11:01 AM To: Schrage, John <jschrag@entergy.com>
Cc: Gaston, Ronald William <rgasto1@entergy.com>; Mirzai, Mahvash <mmirzai@entergy.com>;
GADO, THEODORE <tgado91@entergy.com>; Miller, Rich <rmill98@entergy.com>; Joseph Cascio
<J.Cascio@holtec.com>; Matt Naylor <M.Naylor@holtec.com>; Ryan Konop
<R.Konop@holtec.com>; Prithvish Gowda <P.Gowda@holtec.com>; Mackaman, Clyde D
<cmackam@entergy.com>; Malinski, Steven <smalins@entergy.com>; Skonieczny, John F
<jskonie@entergy.com>; Santis,Derek Dustin <dsantis@entergy.com>; Couture III, Philip
<pcoutur@entergy.com>
Subject:
RE: Follow-up from Entergy - HI-LIFT RAI Clarification Call EXTERNAL SENDER. DO NOT click links, or open attachments, if sender is unknown, or the message seems suspicious in any way.
DO NOT provide your user ID or password.
- John, Thanks for the summary; Ive provided your follow-up information to the technical staff.
Your understanding is correct. However, the original RAI 1.b. included the following statement: If commercial grade dedication would be used, describe the critical characteristics of the strand jack and how each characteristic would be evaluated against the related acceptance criteria. The NRC staff would like the supplemental response to, at a minimum, address the compliance matrices included in the LAR to identify which items applicable to the strand jack would be verified and how the verification would be done.
The proposed schedule is reasonable. Certainly, we would look forward to seeing the draft response on or before 12/18 to be in a better position to confirm the timeline is achievable (i.e., docketed response by 1/5/2021).
Please reach out to me early and often, as needed for any questions and to help ensure the supplement is both timely and responsive to close the RAIs.
- Thanks, Rich Guzman Sr. PM, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Office: O-9C7 l Phone: (301) 415-1030 Richard.Guzman@nrc.gov From: Schrage, John <jschrag@entergy.com>
Sent: Thursday, December 03, 2020 10:47 AM To: Guzman, Richard <Richard.Guzman@nrc.gov>
Cc: Gaston, Ronald William <rgasto1@entergy.com>; Mirzai, Mahvash <mmirzai@entergy.com>;
GADO, THEODORE <tgado91@entergy.com>; Miller, Rich <rmill98@entergy.com>; Joseph Cascio
<J.Cascio@holtec.com>; Matt Naylor <M.Naylor@holtec.com>; Ryan Konop
<R.Konop@holtec.com>; Prithvish Gowda <P.Gowda@holtec.com>; Mackaman, Clyde D
<cmackam@entergy.com>; Malinski, Steven <smalins@entergy.com>; Skonieczny, John F
<jskonie@entergy.com>; Santis,Derek Dustin <dsantis@entergy.com>; Couture III, Philip
<pcoutur@entergy.com>
Subject:
[External_Sender] Follow-up from Entergy - HI-LIFT RAI Clarification Call
- Rich, This is a follow-up message concerning the 01-Dec-2020 HI-LIFT LAR RAI clarification call. As I mentioned during that call, we have summarized our understanding of the information that Entergy needs to provide for the two RAIs in order for the NRC to complete the Safety Evaluation. In addition, we have identified a proposed schedule for transmitting that information to the NRC as a supplement. These two items are described below.
The objective of providing a summary of the needed information is to ensure that we are on the right path. Therefore, we would welcome any and all comments/adjustments from you and Mr.
Jones.
With respect to the proposed schedule, as you suggested during the teleconference, we intend to provide a draft response. Similar to the previous item, we would appreciate any feedback on the schedule.
John L. Schrage Senior Staff Engineer - Licensing Corporate Regulatory Assurance Entergy Services, Inc.
630-244-8848 (mobile)
- 1. Information Requirements
- a. RAI-1.b: The response does not add any new testing or other qualification measures to the initial proposal. The staff was looking for some elements that justify the quality of the design and fabrication beyond a load test. The RAI included, as an example, a review of manufacturer operating experience for the particular technology, which provides more than just the snapshot of performance provided by the load test.
Instead, the response just put the load test into the framework of NQA-1 commercial-grade dedication without justifying its adequacy to meet NUREG-0554 criteria for QA verification.
Our understanding is that there is a concern that the strand jack may include deficiencies that are not discovered during the planned program of functional testing and load testing. A plan for validating the quality of the design and manufacture of the strand jack is needed, to provide confidence that deficiencies are not embedded in the equipment. Such a plan must follow an endorsed method, such as NQA-1, and must be included in the docket.
- b. RAI-3: The response essentially moves the goalposts regarding how the system withstands single failures without addressing whether or not control system failures could cause a significant problem Our understanding is that more information is required on the role of the control system in the safety of the strand jack, and what specifically is in place to prevent system failures or malfunctions from impacting the safety of the strand jack.
Specifically, this relates to the mini-jacks that unseat the wedge collets to allow the strands to move. The response should include what features are in place to prevent this from occurring on the wedges supporting the load, and how will this be verified as a critical characteristic during acceptance testing and dedication.
- 2. Proposed Schedule Entergy will provide a draft response on or before 18-Dec-2020, and a final, docketed response on or before 05-Jan-2021.
This message is intended for the exclusive use of the intended addressee. If you have received this message in error or are not the intended addressee or his or her authorized agent, please notify me immediately by e-mail, discard any paper copies and delete all electronic files of this message.