ML21096A333

From kanterella
Jump to navigation Jump to search

E-mail Dated 4/6/2021, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device
ML21096A333
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 04/06/2021
From: Richard Guzman
NRC/NRR/DORL/LPL1
To: Couture P
Entergy Nuclear Operations
Guzman R
References
EPID L-2020-LLA-0051
Download: ML21096A333 (1)


Text

From: Guzman, Richard To: Couture III, Philip (pcoutur@entergy.com)

Subject:

Indian Point Unit 3 - Transmittal of Draft Safety Evaluation - Proposed License Amendment re: Revision to Licensing Basis to Incorporate the Installation and Use of New Auxiliary Lifting Device (EPID L-2020-LLA-0051)

Date: Tuesday, April 06, 2021 6:26:21 PM Attachments: image003.png Mr. Couture, By letter dated March 24, 2020, as supplemented by letters dated October 2, 2020, November 9, 2020, and February 26, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML20084U773, ML20276A322, ML20314A355, and ML21057A186, respectively), Entergy Nuclear Operations Inc.

submitted a license amendment request to revise the Technical Specifications for Indian Point Nuclear Generating Unit No. 3 (IP3). The amendment would revise the current licensing basis in the Updated Final Safety Analysis Report with regards to the installation and use of a new single failure proof auxiliary lifting device (HI-LIFT) in the Indian Point 3 Fuel Storage Building.

A draft proprietary copy of the NRC staffs safety evaluation has been placed in the cloud-based collaboration tool application, BOX - Enterprise File Synchronization and Sharing (BOX-EFSS) in the folder called IP3 HI-LIFT Crane at https://account.box.com/login?

redirect_url=/.

Pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR 2.390),

we have determined that the draft SE contains proprietary information as identified in bolded brackets (( proprietary information )). Please review the document to ensure the intended information to be withheld is properly marked.

Per our discussion, please provide an electronic marked-up copy of the draft SE via the same BOX-EFSS folder by April 16. The electronic copy should be in redline/strikeout to help facilitate the NRC staffs review of the mark-up and/or comments.

This email and draft SE will be placed in ADAMS and made an official agency record. The draft SE will be non-public. If you have questions, please contact me.

Richard V. Guzman Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Office: O-9C7 l Phone: (301) 415-1030 Richard.Guzman@nrc.gov