Question: 76 Given the following:

  • Unit I is cooling down for refueling outage.
  • RCS Tave is 349 °F.
  • RCS Pressure is 360 psig.

Which ONE of the following correctly states:

1) The maximum number of charging pumps that are allowed per Tech Specs 3.1 .G, RCS Overpressure Mitigation for sustained operation
2) The basis for that requirement?

A. 1. one charging pump capable of injecting into the RCS.

2. To ensure that the mass addition transient, can be relieved by the operation of a single PORV or equivalent.

B. 1. one charging pump capable of injecting into the RCS.

2. To ensure that the mass addition transient, can be relieved by the operation of both PORVs, or equivalent.

C. 1. two charging pumps capable of injecting into the RCS.

2. To ensure that the mass addition transient, can be relieved by the operation of both PORVs, or equivalent.

D. 1. two charging pumps capable of injecting into the RCS.

2. To ensure that the mass addition transient can be relieved by the operation of a single PORV, or equivalent.

.4 Question: 77 Unit 1 initially operating at 100% power when a reactor trip occurs due to A reactor trip breaker spuriously opening.

On transition to ES-0.1, The RD reports the following:

  • Charging flow indicates 25 gpm.
  • Letdown flow is 0 gpm.
  • RD identified 1-CH-TV-1204A, Inside Letdown Trip Valve, is closed and cannot be re-opened.

Which ONE of the following states:

1) The operating Team used to close and de-activate 1-CH-TV-1204B, Outside Letdown Trip Valve.
2) The Letdown penetration is A. 1) 1 -OPT-CT-306, Containment Integrity Verification
2) Inoperable (4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> clock in effect)

B. 1) 1-OPT-CT-306, Containment Integrity Verification

2) Operable (Exit the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> clock)

C. 1) 0-OP-CT-001, Containment Isolation Barriers

2) Inoperable(4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> clock in effect)

D. 1) 0-OP-CT-001, Containment Isolation Barriers

2) Operable (Exit the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> clock)

Question: 78 An entry into 1-FR-S. 1, Response to Nuclear Power Generation ATVVS was made from step 1 of E-O, Reactor Trip or SI.

The following conditions currently exist:

  • Rods are being inserted manually.
  • Control Bank D is at 24 steps.
  • Power range instruments are all indicating 8%.
  • Intermediate Range SUR is negative.
  • An operator has just been dispatched to open reactor trip breakers per step 8 of 1-FR-S. 1.

Which of the following conditions is required by 1-FR-S. 1 to allow a return to 1 -E-O?

A. Both of the RPS MG Set output breakers must be opened.

B. Both of the reactor trip breakers must be opened.

C. Power range indication must be reduced below 5%.

D. All rods must be fully inserted.

Question: 79 Initial Conditions Unit 1 is operating at 100% power.

  • All control channels have been aligned to Channel IV in preparation for Channel Ill process PTs.
  • Turbine First Stage Pressure, 1-MS-PT-1446, fails low.
  • The Team has completed the Immediate Actions of 0-AP-53.00, Loss of Vital Instrumentation/Controls.

Which ONE of the following states:

1) Rod Control required to be placed in Manual in accordance with 0-AP-53.00.
2) In accordance with Tech Spec 3.7-1, Item 20, Operator Action 13; 1-OPT-RP-001, Check of Permissive Status Lights P-6, P-7, P-8, and P-b, required to be completed.

REFERENCE PROVIDED A. 1) is not

2) is B. 1) is not
2) is not C. 1) is
2) is D. 1) is
2) is not

Question: 80 Initial Conditions for Unit 1:

  • Unit 1 at 100% power.
  • Delta Flux is at -2.7% with a target of -1%.
  • Spurious Instrument failure causes rods to insert.

Current Conditions:

  • Reactor Power is 89% and stable.
  • Delta Flux is at -15%.
  • Tave is 571.5 °F, Tref is 571.0 °F.

Based on the current conditions, which ONE of the following states:

1) The next action required to be taken to comply with Technical Specifications.
2) The most restrictive Tech. Spec basis for this CONDITION.

(REFERENCE PROVIDED)

A. 1) Restore Delta flux to target band within 1-hour or reduce power to < 50% in 1-hour.

2) Minimize the effects of Xenon redistribution during load-follow maneuvers.

B. 1) Restore Delta flux to target band within 1-hour or reduce power to < 50% in 1-hour.

2) Provide a limit on rod worth in the event of a rod ejection accident.

C. 1) Reduce reactor power to <50% within 30 minutes.

2) Minimize the effects of Xenon redistribution during load-follow maneuvers.

D. 1) Reduce reactor power to <50% within 30 minutes.

2) Provide a limit on rod worth in the event of a rod ejection accident.

Question: 81 Initial Conditions:

  • Unit 1 and Unit 2 operating at 100% power.
  • Unit 2 is performing 2-PT-41 .1, CC Pump Performance.
  • CC is split out in the Turbine Building.
  • 1-CC-E-1A, A CC HX, has been isolated due to a through wall SW leak.

Current Conditions:

  • CTMT pressure is 10.6 PSIA and rising slowly.
  • The operating Team is performing ARP 1 B-A7, and has raised SW flow to the C CC Heat Exchanger.

Which ONE of the following describes:

1) The effect on Unit 1 Containment Temperature.
2) The basis of the sloped line from 70 °F to 100°F on the Containment Allowable Air Partial Pressure VS. Service Water Temperature Curve (Figure TS-3.8-1) is (REFERENCE PROVIDED)

A. 1) No change.

2) MSLB Peak Calculated Pressure B. 1) Lower.
2) LOCA depressurization C. 1) No change.
2) LOCA depressurization D. 1) Lower.
2) MSLB Peak Calculated Pressure

Question: 82 Given the following:

  • Unit 1 is ramping down in accordance with 0-AP-23.00, Rapid Load Reduction.
  • Emergency Boration has been initiated.
  • Emergency Borate Flow, 1-OH-Fl-ill 0, rises to 80 gpm then drops to 0 gpm indicated flow.
  • Emergency Borate MOV, 1-CH-MOV-i 350, indicates intermediate.
  • A Boric Acid Transfer Pump, i-CH-P-2A, FAST light is LIT.
  • A Boric Acid Storage Tank level, LI-i-i 06/LI-i-161, indicate 93% and stable.

Which ONE of the following states:

1) The cause for the change Emergency Borate Flow, 1-OH-Fl-il i 0.
2) Are the minimum Boric Acid flowpaths OPERABLE?

A. i) i-CH-P-2A shaft has sheared.

2) No.

B. 1) l-CH-P-2A shaft has sheared.

2) Yes.
0. 1) 1-OH-Fl-ill 0, Emergency Borate Flow has failed low.
2) No.

D. 1) i-OH-Fl-il i 0, Emergency Borate Flow has failed low.

2) Yes.

Question: 83 Initial Conditions:

  • The reactor has been tripped and SI initiated due to a Large Break LOCA inside Containment.
  • A Outside Recirc Spray pump (ORS) discharge pressure and amp indications are fluctuating.

Which ONE of the following identifies:

1) The operator required to locally open the supply breaker after placing the A ORS pump in PTL.
2) The required procedural flow path is i-E-O, Reactor Trip or SI; l-E-i, Loss of Reactor or Secondary Coolant; and A. 1) is
2) 1-ES-i .2, Post LOCA Cooldown and Depressurization B. 1) is not
2) 1-ES-1.3, Transfer to Cold Leg Recirculation C. 1) is not
2) 1-ES-i .2, Post LOCA Cooldown and Depressurization D. i) is
2) 1-ES-1.3, Transfer to Cold Leg Recirculation

Question: 84 Initial Conditions:

  • Unit 1 is operating at 100%.
  • 1-CC-TV-i 05B, RCP B CLR CC RTN TV, fails closed.
  • The crew enters i-AP-9.00, RCP Abnormal Conditions.

Current Conditions:

o 1C-G4, RCP FRAME ALERT.

  • RCP B parameter changes over the last 5 minutes Parameter Initial reading Current reading Frame Vibration 1.6 mils 2.9 mils and stable Shaft Vibration 5.5 mils 10.8 mils and stable Which ONE of the following answers the questions below:
1) Is it required at this time to remove the unit from service and secure the B RCP in accordance with 1-AP-9.00, RCP Abnormal Conditions?
2) What is the Tech Spec Bases for the most limiting LCO that is entered?

A. 1) No.

2) Provide cooling water for the removal of residual and sensible heat from the Reactor Coolant system, cool the containment recirculation air coolers, and the reactor coolant pump motor coolers.

B. 1) No.

2) Ensures the containment atmosphere will be isolated from the outside environment in the event of a release of radioactive material to the containment atmosphere or pressurization of the containment.

C. 1) Yes.

2) Provide cooling water for the removal of residual and sensible heat from the Reactor Coolant system, cool the containment recirculation air coolers, and the reactor coolant pump motor coolers.

D. 1) Yes.

2) Ensures the containment atmosphere will be isolated from the outside environment in the event of a release of radioactive material to the containment atmosphere or pressurization of the containment.

Question: 85 Unit 1 is operating at 100% power; Unit 2 is in Refueling shutdown.

  • The eighth fuel assembly has just been lifted into the Manipulator Crane when it is dropped, and bubbles begin issuing from the assembly.
  • Containment is open.
  • 1-VS-F-42, Relay Room Emergency Supply Fan, is tagged out for maintenance.

Which ONE of the following identifies:

1) In accordance with 0-AP-22.00, Fuel Handling Abnormal Conditions, Containment Closure is required to be set within minutes.
2) In accordance with TS 3.21 Basis, the Minimum number of OPERABLE trains of the Control Room Emergency Ventilation System is A. 1) 45
2) 3 B. 1) 60
3) 3 C. 1) 45
2) 2 D. 1) 60
2) 2

Question: 86 Initial Conditions:

With the plant at 100% power, a loss of all feedwater occurs.

Current Conditions:

  • The crew is NOT successful at tripping the reactor manually.
  • The reactor fails to trip automatically.
  • The crew enters FR-S. 1, RESPONSE TO NUCLEAR POWER GENERATION ATWS. -

In accordance with the FR-S.1 background document which ONE of the following states:

1) The maximum amount of time for tripping the turbine to prevent unacceptable consequences.
2) The basis for tripping the main turbine shortly after the onset of the event.

A. 1) 30 seconds.

2) Shut down the reactor by allowing the RCS to heat up.

B. 1) 60 seconds.

2) Shut down the reactor by allowing the RCS to heat up.

C. 1) 60 seconds.

2) Prevent the RCS from exceeding its RCS pressure limit.

D. 1) 30 seconds.

2) Prevent the RCS from exceeding its RCS pressure limit.

Question: 87 Initial Conditions:

  • Unit 1 is operating at 100

% power.

  • A charging pump, 1-CH-P-1A, running.
  • Breaker 25J3, EDG #3 Output breaker to 2J bus,
  • A RSST Pilot Wire Locko tagged out for breaker PM ut foflowed one (1) minut s.

occurs due to Maintenance e later by C RSST Pilot Crew error in the Switch Wire Lockout yard.

Which ONE of the follow ing identifies:

1) The and B Charging Pump
2) The non-running chargi s are running on Unit 1.

ng pump is A. 1) A

2) Operable B. 1) A
2) Inoperable C. 1) C
2) Operable D. 1) C
2) Inoperable

Question: 88 Initial Conditions:

  • Refueling operations in progress for Unit 1.
  • Recorder traces for 1-RM-RR-127, and 1-RM-128 are shown below.

i .,

ULt flW £d J- £L F

hi:LLi EZEZ l.OOE*OO .

1.DO+OO 1k __

CONTHIRANGE

  • 1-RM-RR427

.Tr IRMR CONVf4HANGE 1L- RIZB Current Conditions:

  • The operator depresses the SAFE/RE SET pushbutton to attempt to reset the
  • There is no change from the initial con alarm.

ditions.

Which ONE of the following describes:

1) The actions that must be performed in accordance with 1-RMA-A1, Unit 1 ALERT/TRBL? CTMT HI RAD
2) The Technical specification basis for this Radiation Monitor?

A. I) Stop refueling, notify HP, and evacuate Unit 1 containment.

2) Provide information to the operato rs that will enable them to determine gross breach of barriers to radioactive the likelihood of a release.

B. 1) Review Technical Specifications and monitor activity using the redund

2) Provide information to the operato ant monitor.

rs that will enable them to determine gross breach of barriers to radioactive the likelihood of a release.

C. 1) Stop refueling, notify HP, and eva cuate Unit 1 containment.

2) Provide a sensitive indication of prim ary system leakage.

D. 1) Review Technical Specifications and monitor activity using the redund

2) Provide a sensitive indication of prim ant monitor.

ary system leakage.

Question: 89 Tech Specs Section 4.6, Emergency Power System Periodic Testing, states that a minimum fuel oil storage of 35,000 gallons shall be maintained on-site.

Concerning the basis for this capacity, which ONE of the following states:

1) The number of EDG(s) running at full power assumed?
2) The time elapsed before the fuel supply is exhausted?

A. 1) Two (2).

2) 1 Day.

B. 1) Two(2).

2) 7 Days.

C. 1) One(1).

2) 1 Day.

D. 1) One(1).

2) 7 Days.

Question: 90 Given the following:

  • Team is responding to a SGTR on Unit 2 B S/G following a sustained loss of off-site power.
  • Instrument air pressure on PI-IA-100 is 50 psig and lowering rapidly.
  • Temporary Diesel Air compressor will not start.

Team is ready to perform RCS cooldown.

Which ONE of the following correctly describes:

1) The initial actions for RCS cooldown in accordance with 2-E-3.
2) The post-SGTR procedure to use following initial cooldown.

A. 1) Cooldown by dumping steam from intact SIGs via local operation of the BIG PORVs.

2) 2-ES-3.1, POST SGTR COOLDOWN USING BACKFILL.

B. 1) Cooldown by dumping steam from intact SIGs via local operation of the steam dumps.

2) 2-ES-3.1, POST SGTR COOLDOWN USING BACKFILL.

C. 1) Cooldown by dumping steam from intact SIGs via local operation of the SIG PORVs.

2) 2-ES-3.2, POST SGTR COOLDOWN USING BLOWDOWN.

D. 1) Cooldown by dumping steam from intact S/Gs via local operation of the steam dumps.

2) 2-ES-3.2, POST SGTR COOLDOWN USING BLOWDOWN.

Question: 91 Unit 1 has experienced a LBLOCA coincident with a loss of off-site power.

Initial Conditions:

  • 4160 V Emergency bus 1 H is de-energized due to a fault.
  • CTMT pressure is 55 psia and slowly rising.
  • 1-CS-P-i B, B CS pump tripped on start.
  • The Team has performed 1-FR-Z.1, Response to Containment High Pressure, and returned to 1-E-i, Loss of Reactor or Secondary Coolant.

Current Conditions:

  • CTMT Pressure 58 psia and stable.

Which ONE of the following states:

1) The procedure and Path Color in effect.
2) Based upon Current Conditions, does 1-FR-Z.1 need to be implemented again?

A. 1) FR-Z.i, Response to Containment High Pressure; RED Path.

2) Yes.

B. 1) FR-Z.1, Response to Containment High Pressure; RED Path.

2) No.

C. 1) FR-Z.i, Response to Containment High Pressure; ORANGE Path.

2) Yes.

D. 1) FR-Z.1, Response to Containment High Pressure; ORANGE Path.

2) No.

Question: 92 Given the following conditions:

  • Unit 1 is at 100% power when a fire occurs in the Unit 1 Emergency Switchgear Room.
  • The emergency switchgear Fire Suppression system could NOT be manually actuated.
  • The team entered 1-FCA-4.00, Limiting ESGR Number 1 Fire.
  • The team has placed the MS PRESS CONT VLV FIRE EM ERG CLOSE switches to EM ERG CLOSE position for the SG PORVs.
  • The fire has resulted in a loss of all three transfer busses.
  • Condenser Waterbox Vacuum breakers have been opened.

Which one of the following states:

1) The correct method available for controlling the RCS cooldown in accordance with 0-FCA-17.00.
2) The maximum amount of time for restoring the Fire Suppression system to a FUNCTIONAL status per the TRM.

(REFERENCE PROVIDED)

A. 1) Operate the SG PORVs from the MCR.

2) 14 days.

B. 1) Operate the SG PORVs from the MCR.

2) 7 days.

C. 1) Locally operate the SG PORVs using the air bottles.

2) 14 days.

D. 1) Locally operate the SG PORVs using the air bottles.

2) 7 days.

Question: 93 The Unit is operating at 100% when the following events occur:

  • 1236 #2 EDG is started for Monthly Performance Test.
  • 1330 Heavy black smoke is reported coming from #2 EDG Engine Control Cabinet.
  • 1333 #2 EDG tripped.
  • 1340 An alert is declared based on Tab HA2. 1, Fire or explosion affecting the operability of structures, systems, or components required to establish or maintain Safe Shutdown.

Which ONE of the following identifies:

1) The first method used to notify Plant personnel to report to their Emergency Assembly Area(s) in accordance with EPIP-1 .01.
2) The maximum time allowed for Security to report initial results of Accountability of Plant personnel.

A. 1) Contact Station Personnel with Beepers.

2) 15 minutes.

B. 1) Contact Station Personnel with Beepers.

2) 30 minutes.

C. 1) Station Emergency Manager announcement using Gai-tronics.

2) 15 minutes.

D. 1) Station Emergency Manager announcement using Gai-tronics.

2) 30 minutes.

Question: 94 Preparations are in progress to conduct a Reactor startup following a refueling outage for Unit 2. The operations and support personnel have assembled to conduct a Pre-job briefing for 2-NPT-RX-008, Startup Physics Testing (ICCE II).

Which ONE of the following correctly describes the requirements per OP-AA-1 06, Infrequently Conducted or Complex Evolutions, Attachment 3 Management Expectations Briefing checklist, for covering the expectations regarding the need for open communication?

1) The individual must have a position of or above.
2) The individual must be qualified at a minimum as A. 1) Test Coordinator
2) Current Reactor Engineer B. 1) Test Coordinator
2) Senior Reactor Operator, past or present C. 1) Second Line Supervisor
2) Senior Reactor Operator, past or present D. 1) Second Line Supervisor
2) Current Reactor Engineer

Question: 95 Initial Conditions:

  • The reactor is operating at 100% power.
  • An RCS Leak Rate is in progress in accordance with 1-OPT-RC-10.0, Reactor Coolant Leakage Computer Calculated.

Current Conditions:

Which of the following identifies:

1) In accordance with OP-AP-105, Post Trip Review, the minimum authority who must authorize Reactor Restart following completion of recovery actions is the
2) The RCS Leakrate is required to be completed in accordance with TS-4.13 Basis.

A. 1) Manager Nuclear Operations.

2) Shiftly.

B. 1) Manager Nuclear Operations.

2) Daily.

C. 1) Site Vice President.

2) Shiftly.

D. 1) Site Vice President.

2) Daily.

Question: 96 Given the following:

  • Unit 1 and Unit 2 are at 100%.
  • 1 -EPT-Ol 06-03, Emergency Diesel No. 1 Battery Service Test has just been turned in for review as UNSAT.
  • All other PMT items have been completed as Sat.

Which ONE of the following correctly answers the questions regarding returning Emergency Diesel No.

1 to service per VPAP 2003, Post Maintenance Testing:

1) Can Emergency Diesel No. 1 be returned to service without performing rework, with an Engineering justification that the test failure does not affect operability?
2) Which department is responsible for making the final determination of operability?

A. 1)Yes.

2) Engineering.

B. 1)Yes.

2) Operations.

C. 1)No.

2) Engineering.

D. 1)No.

2) Operations.

Question: 97 A licensed operator commences the release of a waste gas decay tank in accordance with OP-23.2.4, Release of Waste Gas Decay Tank 1 B. Initial Hydrogen concentration in WGDT 1 B is 67.3%. A spike results in the process vent radiation monitor, 1-GW-Rl-130, entering into ACCIDENT mode. The release is subsequently isolated in accordance with O-RMA-C7, Process Vent Normal Range Gas Alert/HI, and activity returns to pre-event levels.

Which ONE of the following states:

1) The maximum release rate from a WGDT 1 B is based on
2) The procedure used to return the radiation monitor to Normal Mode.

A. 1) the release permit

2) l&C resets the RM using an Instrument Maintenance Procedure.

B. 1) the Hydrogen concentration

2) I&C resets the RM using an Instrument Maintenance Procedure.

C. 1) release permit

2) Operations resets the RM using O-RMA-C7.

D. 1) the Hydrogen concentration

2) Operations resets the RM using O-RMA-C7.

Question: 98 Given the following conditions:

  • A General Emergency has been declared.
  • An individual has been injured in the Auxiliary Building penetration area.
  • Dose rates in the area are 140 Rem/hr.
  • It will take a maximum of 10 minutes to remove the individual from the area.

Which ONE of the following correctly describes the EPIP 4.04 requirements for:

1) Solicitation of a volunteer to rescue the individual.
2) Use of an RWP.

A. 1) Anticipated dose rates do NOT require the SEM to solicit volunteers to remove the injured worker.

2) An RWP is NOT required provided the SEM authorizes the activity.

B. 1) Due to anticipated dose for rescue workers, the SEM can assign ONLY volunteers to remove the injured worker.

2) An RWP is NOT required provided the SEM authorizes the activity.

C. 1) Anticipated dose rates do NOT require the SEM to solicit volunteers to remove the injured worker.

2) The SEM may NOT waive the requirement for an RWP.

D. 1) Due to anticipated dose for rescue workers, the SEM can assign ONLY volunteers to remove the injured worker.

2) The SEM may NOT waive the requirement for an RWP.

Question: 99 Initial Conditions:

  • Unit 1 was initially at 100% power.

Current Conditions:

  • A severe thunderstorm has caused a Loss of Off-Site Power (LOOP).
  • Storm generated missiles have destroyed the following tanks.
  • 1 & 2-CN-TK-2 (Normal ON Storage Tanks).
  • 1-CN-TK-1 (Emergency ON Storage Tank).
  • 1-FP-TK-1A & lB (Fire Protection Tanks).
  • At the completion of 1-ES-0.1, Reactor Trip Response, the operating team determines that a Natural Circulation Oooldown must be performed at a rate that will cause Reactor Vessel Head void formation.

Which ONE of the following states the required procedural transition for Unit 1?

A. Go directly to 1-ES-0.3, Natural Circulation Cooldown with Steam Void in Rx Vessel.

B. Go directly to 1-ES-0.4, Natural Circulation Cooldown with Steam Void in Rx Vessel Without RVLIS.

C. Go to 1-ES-0.2, Natural Circulation Cooldown. Initiate ROS cooldown, then transition to 1-ES-0.3, Natural Circulation Cooldown with Steam Void in Rx Vessel.

D. Go to 1-ES-0.2, Natural Circulation Cooldown. Initiate RCS cooldown, then transition to 1-ES-0.4, Natural Circulation Cooldown with Steam Void in Rx Vessel Without RVLIS.

Question: 100 Given the following sequence of events:

  • Unit 1 tripped from 100% power due to A SG fault in Unit 1 Safeguards.
  • The TDAFW pump, 1-FW-P-2, tripped on startup.
  • SG narrow-range levels are off-scale low.
  • A and B MDAFW pump trip and lock-out.
  • The Team has completed Step 1 when the STA reports a red-path exists on Heat Sink CSF status tree.

Which ONE of the following describes:

1) The first source of AFW directed to be restored in accordance with 1-FR-Hi, Response to Loss of Heat Sink.
2) Sequence of procedure transitions for this event.

A. 1) AFW from Unit 2 via the cross-tie.

2) 1-FR-H.1, Response to Loss of Heat Sink; 1-ECA-2.1, Uncontrolled Depressurization of All S/Gs.

B. 1) Unit 1 Main Feed Water.

2) 1-FR-Hi, Response to Loss of Heat Sink; 1-ECA-2.1, Uncontrolled Depressurization of All S/Gs.

C. 1) Unit 1 Main Feed Water.

2) 1-FR-H.i, Response to Loss of Heat Sink; 1-E-2, Faulted S/G Isolation; 1-ECA-2.i, Uncontrolled Depressurization of All S/Gs.

D. 1) AFW from Unit 2 via the cross-tie.

2) i-FR-Hi, Response to Loss of Heat Sink; i-E-2, Faulted S/G Isolation; i-ECA-2.i, Uncontrolled Depressurization of All S/Gs.

-t.

5-3 (D
5

-f 1:::

-IHHH a

(D - - (D r (D (D I

-f Li 0

0) V)
0) -1 0 Wf -*
5 )

0

_._i n,

-f ><

I I

2015 NRC ANSWER KEY Question # Answer SRO 76 A 77 D 78 C 79 A 80 C 81 C 82 A 83 B 84 B 85 C 86 D 87 D 88 B 89 D 90 A 91 D 92 C 93 D 94 C 95 D 96 B 97 A 98 A 99 C 100 D NRC Validation Page 2

Question: 76 Given the following:

  • Unit I is cooling down for refueling outage.
  • RCS Tave is 349 °F.
  • RCS Pressure is 360 psig.

Which ONE of the following correctly states:

1) The maximum number of charging pumps that are allowed per Tech Specs 3.1 .G, RCS Overpressure Mitigation for sustained operation
2) The basis for that requirement?

A. 1. one charging pump capable of injecting into the RCS.

2. To ensure that the mass addition transient, can be relieved by the operation of a single PORV or equivalent.

B. 1. one charging pump capable of injecting into the RCS.

2. To ensure that the mass addition transient, can be relieved by the operation of both PORVs, or equivalent.

C. 1. two charging pumps capable of injecting into the RCS.

2. To ensure that the mass addition transient, can be relieved by the operation of both PORVs, or equivalent.

D. 1. two charging pumps capable of injecting into the RCS.

2. To ensure that the mass addition transient can be relieved by the operation of a single PORV, or equivalent.

.4 Question: 77 Unit 1 initially operating at 100% power when a reactor trip occurs due to A reactor trip breaker spuriously opening.

On transition to ES-0.1, The RD reports the following:

  • Charging flow indicates 25 gpm.
  • Letdown flow is 0 gpm.
  • RD identified 1-CH-TV-1204A, Inside Letdown Trip Valve, is closed and cannot be re-opened.

Which ONE of the following states:

1) The operating Team used to close and de-activate 1-CH-TV-1204B, Outside Letdown Trip Valve.
2) The Letdown penetration is A. 1) 1 -OPT-CT-306, Containment Integrity Verification
2) Inoperable (4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> clock in effect)

B. 1) 1-OPT-CT-306, Containment Integrity Verification

2) Operable (Exit the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> clock)

C. 1) 0-OP-CT-001, Containment Isolation Barriers

2) Inoperable(4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> clock in effect)

D. 1) 0-OP-CT-001, Containment Isolation Barriers

2) Operable (Exit the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> clock)

Question: 78 An entry into 1-FR-S. 1, Response to Nuclear Power Generation ATVVS was made from step 1 of E-O, Reactor Trip or SI.

The following conditions currently exist:

  • Rods are being inserted manually.
  • Control Bank D is at 24 steps.
  • Power range instruments are all indicating 8%.
  • Intermediate Range SUR is negative.
  • An operator has just been dispatched to open reactor trip breakers per step 8 of 1-FR-S. 1.

Which of the following conditions is required by 1-FR-S. 1 to allow a return to 1 -E-O?

A. Both of the RPS MG Set output breakers must be opened.

B. Both of the reactor trip breakers must be opened.

C. Power range indication must be reduced below 5%.

D. All rods must be fully inserted.

Question: 79 Initial Conditions Unit 1 is operating at 100% power.

  • All control channels have been aligned to Channel IV in preparation for Channel Ill process PTs.
  • Turbine First Stage Pressure, 1-MS-PT-1446, fails low.
  • The Team has completed the Immediate Actions of 0-AP-53.00, Loss of Vital Instrumentation/Controls.

Which ONE of the following states:

1) Rod Control required to be placed in Manual in accordance with 0-AP-53.00.
2) In accordance with Tech Spec 3.7-1, Item 20, Operator Action 13; 1-OPT-RP-001, Check of Permissive Status Lights P-6, P-7, P-8, and P-b, required to be completed.

REFERENCE PROVIDED A. 1) is not

2) is B. 1) is not
2) is not C. 1) is
2) is D. 1) is
2) is not

Question: 80 Initial Conditions for Unit 1:

  • Unit 1 at 100% power.
  • Delta Flux is at -2.7% with a target of -1%.
  • Spurious Instrument failure causes rods to insert.

Current Conditions:

  • Reactor Power is 89% and stable.
  • Delta Flux is at -15%.
  • Tave is 571.5 °F, Tref is 571.0 °F.

Based on the current conditions, which ONE of the following states:

1) The next action required to be taken to comply with Technical Specifications.
2) The most restrictive Tech. Spec basis for this CONDITION.

(REFERENCE PROVIDED)

A. 1) Restore Delta flux to target band within 1-hour or reduce power to < 50% in 1-hour.

2) Minimize the effects of Xenon redistribution during load-follow maneuvers.

B. 1) Restore Delta flux to target band within 1-hour or reduce power to < 50% in 1-hour.

2) Provide a limit on rod worth in the event of a rod ejection accident.

C. 1) Reduce reactor power to <50% within 30 minutes.

2) Minimize the effects of Xenon redistribution during load-follow maneuvers.

D. 1) Reduce reactor power to <50% within 30 minutes.

2) Provide a limit on rod worth in the event of a rod ejection accident.

Question: 81 Initial Conditions:

  • Unit 1 and Unit 2 operating at 100% power.
  • Unit 2 is performing 2-PT-41 .1, CC Pump Performance.
  • CC is split out in the Turbine Building.
  • 1-CC-E-1A, A CC HX, has been isolated due to a through wall SW leak.

Current Conditions:

  • CTMT pressure is 10.6 PSIA and rising slowly.
  • The operating Team is performing ARP 1 B-A7, and has raised SW flow to the C CC Heat Exchanger.

Which ONE of the following describes:

1) The effect on Unit 1 Containment Temperature.
2) The basis of the sloped line from 70 °F to 100°F on the Containment Allowable Air Partial Pressure VS. Service Water Temperature Curve (Figure TS-3.8-1) is (REFERENCE PROVIDED)

A. 1) No change.

2) MSLB Peak Calculated Pressure B. 1) Lower.
2) LOCA depressurization C. 1) No change.
2) LOCA depressurization D. 1) Lower.
2) MSLB Peak Calculated Pressure

Question: 82 Given the following:

  • Unit 1 is ramping down in accordance with 0-AP-23.00, Rapid Load Reduction.
  • Emergency Boration has been initiated.
  • Emergency Borate Flow, 1-OH-Fl-ill 0, rises to 80 gpm then drops to 0 gpm indicated flow.
  • Emergency Borate MOV, 1-CH-MOV-i 350, indicates intermediate.
  • A Boric Acid Transfer Pump, i-CH-P-2A, FAST light is LIT.
  • A Boric Acid Storage Tank level, LI-i-i 06/LI-i-161, indicate 93% and stable.

Which ONE of the following states:

1) The cause for the change Emergency Borate Flow, 1-OH-Fl-il i 0.
2) Are the minimum Boric Acid flowpaths OPERABLE?

A. i) i-CH-P-2A shaft has sheared.

2) No.

B. 1) l-CH-P-2A shaft has sheared.

2) Yes.
0. 1) 1-OH-Fl-ill 0, Emergency Borate Flow has failed low.
2) No.

D. 1) i-OH-Fl-il i 0, Emergency Borate Flow has failed low.

2) Yes.

Question: 83 Initial Conditions:

  • The reactor has been tripped and SI initiated due to a Large Break LOCA inside Containment.
  • A Outside Recirc Spray pump (ORS) discharge pressure and amp indications are fluctuating.

Which ONE of the following identifies:

1) The operator required to locally open the supply breaker after placing the A ORS pump in PTL.
2) The required procedural flow path is i-E-O, Reactor Trip or SI; l-E-i, Loss of Reactor or Secondary Coolant; and A. 1) is
2) 1-ES-i .2, Post LOCA Cooldown and Depressurization B. 1) is not
2) 1-ES-1.3, Transfer to Cold Leg Recirculation C. 1) is not
2) 1-ES-i .2, Post LOCA Cooldown and Depressurization D. i) is
2) 1-ES-1.3, Transfer to Cold Leg Recirculation

Question: 84 Initial Conditions:

  • Unit 1 is operating at 100%.
  • 1-CC-TV-i 05B, RCP B CLR CC RTN TV, fails closed.
  • The crew enters i-AP-9.00, RCP Abnormal Conditions.

Current Conditions:

o 1C-G4, RCP FRAME ALERT.

  • RCP B parameter changes over the last 5 minutes Parameter Initial reading Current reading Frame Vibration 1.6 mils 2.9 mils and stable Shaft Vibration 5.5 mils 10.8 mils and stable Which ONE of the following answers the questions below:
1) Is it required at this time to remove the unit from service and secure the B RCP in accordance with 1-AP-9.00, RCP Abnormal Conditions?
2) What is the Tech Spec Bases for the most limiting LCO that is entered?

A. 1) No.

2) Provide cooling water for the removal of residual and sensible heat from the Reactor Coolant system, cool the containment recirculation air coolers, and the reactor coolant pump motor coolers.

B. 1) No.

2) Ensures the containment atmosphere will be isolated from the outside environment in the event of a release of radioactive material to the containment atmosphere or pressurization of the containment.

C. 1) Yes.

2) Provide cooling water for the removal of residual and sensible heat from the Reactor Coolant system, cool the containment recirculation air coolers, and the reactor coolant pump motor coolers.

D. 1) Yes.

2) Ensures the containment atmosphere will be isolated from the outside environment in the event of a release of radioactive material to the containment atmosphere or pressurization of the containment.

Question: 85 Unit 1 is operating at 100% power; Unit 2 is in Refueling shutdown.

  • The eighth fuel assembly has just been lifted into the Manipulator Crane when it is dropped, and bubbles begin issuing from the assembly.
  • Containment is open.
  • 1-VS-F-42, Relay Room Emergency Supply Fan, is tagged out for maintenance.

Which ONE of the following identifies:

1) In accordance with 0-AP-22.00, Fuel Handling Abnormal Conditions, Containment Closure is required to be set within minutes.
2) In accordance with TS 3.21 Basis, the Minimum number of OPERABLE trains of the Control Room Emergency Ventilation System is A. 1) 45
2) 3 B. 1) 60
3) 3 C. 1) 45
2) 2 D. 1) 60
2) 2

Question: 86 Initial Conditions:

With the plant at 100% power, a loss of all feedwater occurs.

Current Conditions:

  • The crew is NOT successful at tripping the reactor manually.
  • The reactor fails to trip automatically.
  • The crew enters FR-S. 1, RESPONSE TO NUCLEAR POWER GENERATION ATWS. -

In accordance with the FR-S.1 background document which ONE of the following states:

1) The maximum amount of time for tripping the turbine to prevent unacceptable consequences.
2) The basis for tripping the main turbine shortly after the onset of the event.

A. 1) 30 seconds.

2) Shut down the reactor by allowing the RCS to heat up.

B. 1) 60 seconds.

2) Shut down the reactor by allowing the RCS to heat up.

C. 1) 60 seconds.

2) Prevent the RCS from exceeding its RCS pressure limit.

D. 1) 30 seconds.

2) Prevent the RCS from exceeding its RCS pressure limit.

Question: 87 Initial Conditions:

  • Unit 1 is operating at 100

% power.

  • A charging pump, 1-CH-P-1A, running.
  • Breaker 25J3, EDG #3 Output breaker to 2J bus,
  • A RSST Pilot Wire Locko tagged out for breaker PM ut foflowed one (1) minut s.

occurs due to Maintenance e later by C RSST Pilot Crew error in the Switch Wire Lockout yard.

Which ONE of the follow ing identifies:

1) The and B Charging Pump
2) The non-running chargi s are running on Unit 1.

ng pump is A. 1) A

2) Operable B. 1) A
2) Inoperable C. 1) C
2) Operable D. 1) C
2) Inoperable

Question: 88 Initial Conditions:

  • Refueling operations in progress for Unit 1.
  • Recorder traces for 1-RM-RR-127, and 1-RM-128 are shown below.

i .,

ULt flW £d J- £L F

hi:LLi EZEZ l.OOE*OO .

1.DO+OO 1k __

CONTHIRANGE

  • 1-RM-RR427

.Tr IRMR CONVf4HANGE 1L- RIZB Current Conditions:

  • The operator depresses the SAFE/RE SET pushbutton to attempt to reset the
  • There is no change from the initial con alarm.

ditions.

Which ONE of the following describes:

1) The actions that must be performed in accordance with 1-RMA-A1, Unit 1 ALERT/TRBL? CTMT HI RAD
2) The Technical specification basis for this Radiation Monitor?

A. I) Stop refueling, notify HP, and evacuate Unit 1 containment.

2) Provide information to the operato rs that will enable them to determine gross breach of barriers to radioactive the likelihood of a release.

B. 1) Review Technical Specifications and monitor activity using the redund

2) Provide information to the operato ant monitor.

rs that will enable them to determine gross breach of barriers to radioactive the likelihood of a release.

C. 1) Stop refueling, notify HP, and eva cuate Unit 1 containment.

2) Provide a sensitive indication of prim ary system leakage.

D. 1) Review Technical Specifications and monitor activity using the redund

2) Provide a sensitive indication of prim ant monitor.

ary system leakage.

Question: 89 Tech Specs Section 4.6, Emergency Power System Periodic Testing, states that a minimum fuel oil storage of 35,000 gallons shall be maintained on-site.

Concerning the basis for this capacity, which ONE of the following states:

1) The number of EDG(s) running at full power assumed?
2) The time elapsed before the fuel supply is exhausted?

A. 1) Two (2).

2) 1 Day.

B. 1) Two(2).

2) 7 Days.

C. 1) One(1).

2) 1 Day.

D. 1) One(1).

2) 7 Days.

Question: 90 Given the following:

  • Team is responding to a SGTR on Unit 2 B S/G following a sustained loss of off-site power.
  • Instrument air pressure on PI-IA-100 is 50 psig and lowering rapidly.
  • Temporary Diesel Air compressor will not start.

Team is ready to perform RCS cooldown.

Which ONE of the following correctly describes:

1) The initial actions for RCS cooldown in accordance with 2-E-3.
2) The post-SGTR procedure to use following initial cooldown.

A. 1) Cooldown by dumping steam from intact SIGs via local operation of the BIG PORVs.

2) 2-ES-3.1, POST SGTR COOLDOWN USING BACKFILL.

B. 1) Cooldown by dumping steam from intact SIGs via local operation of the steam dumps.

2) 2-ES-3.1, POST SGTR COOLDOWN USING BACKFILL.

C. 1) Cooldown by dumping steam from intact SIGs via local operation of the SIG PORVs.

2) 2-ES-3.2, POST SGTR COOLDOWN USING BLOWDOWN.

D. 1) Cooldown by dumping steam from intact S/Gs via local operation of the steam dumps.

2) 2-ES-3.2, POST SGTR COOLDOWN USING BLOWDOWN.

Question: 91 Unit 1 has experienced a LBLOCA coincident with a loss of off-site power.

Initial Conditions:

  • 4160 V Emergency bus 1 H is de-energized due to a fault.
  • CTMT pressure is 55 psia and slowly rising.
  • 1-CS-P-i B, B CS pump tripped on start.
  • The Team has performed 1-FR-Z.1, Response to Containment High Pressure, and returned to 1-E-i, Loss of Reactor or Secondary Coolant.

Current Conditions:

  • CTMT Pressure 58 psia and stable.

Which ONE of the following states:

1) The procedure and Path Color in effect.
2) Based upon Current Conditions, does 1-FR-Z.1 need to be implemented again?

A. 1) FR-Z.i, Response to Containment High Pressure; RED Path.

2) Yes.

B. 1) FR-Z.1, Response to Containment High Pressure; RED Path.

2) No.

C. 1) FR-Z.i, Response to Containment High Pressure; ORANGE Path.

2) Yes.

D. 1) FR-Z.1, Response to Containment High Pressure; ORANGE Path.

2) No.

Question: 92 Given the following conditions:

  • Unit 1 is at 100% power when a fire occurs in the Unit 1 Emergency Switchgear Room.
  • The emergency switchgear Fire Suppression system could NOT be manually actuated.
  • The team entered 1-FCA-4.00, Limiting ESGR Number 1 Fire.
  • The team has placed the MS PRESS CONT VLV FIRE EM ERG CLOSE switches to EM ERG CLOSE position for the SG PORVs.
  • The fire has resulted in a loss of all three transfer busses.
  • Condenser Waterbox Vacuum breakers have been opened.

Which one of the following states:

1) The correct method available for controlling the RCS cooldown in accordance with 0-FCA-17.00.
2) The maximum amount of time for restoring the Fire Suppression system to a FUNCTIONAL status per the TRM.

(REFERENCE PROVIDED)

A. 1) Operate the SG PORVs from the MCR.

2) 14 days.

B. 1) Operate the SG PORVs from the MCR.

2) 7 days.

C. 1) Locally operate the SG PORVs using the air bottles.

2) 14 days.

D. 1) Locally operate the SG PORVs using the air bottles.

2) 7 days.

Question: 93 The Unit is operating at 100% when the following events occur:

  • 1236 #2 EDG is started for Monthly Performance Test.
  • 1330 Heavy black smoke is reported coming from #2 EDG Engine Control Cabinet.
  • 1333 #2 EDG tripped.
  • 1340 An alert is declared based on Tab HA2. 1, Fire or explosion affecting the operability of structures, systems, or components required to establish or maintain Safe Shutdown.

Which ONE of the following identifies:

1) The first method used to notify Plant personnel to report to their Emergency Assembly Area(s) in accordance with EPIP-1 .01.
2) The maximum time allowed for Security to report initial results of Accountability of Plant personnel.

A. 1) Contact Station Personnel with Beepers.

2) 15 minutes.

B. 1) Contact Station Personnel with Beepers.

2) 30 minutes.

C. 1) Station Emergency Manager announcement using Gai-tronics.

2) 15 minutes.

D. 1) Station Emergency Manager announcement using Gai-tronics.

2) 30 minutes.

Question: 94 Preparations are in progress to conduct a Reactor startup following a refueling outage for Unit 2. The operations and support personnel have assembled to conduct a Pre-job briefing for 2-NPT-RX-008, Startup Physics Testing (ICCE II).

Which ONE of the following correctly describes the requirements per OP-AA-1 06, Infrequently Conducted or Complex Evolutions, Attachment 3 Management Expectations Briefing checklist, for covering the expectations regarding the need for open communication?

1) The individual must have a position of or above.
2) The individual must be qualified at a minimum as A. 1) Test Coordinator
2) Current Reactor Engineer B. 1) Test Coordinator
2) Senior Reactor Operator, past or present C. 1) Second Line Supervisor
2) Senior Reactor Operator, past or present D. 1) Second Line Supervisor
2) Current Reactor Engineer

Question: 95 Initial Conditions:

  • The reactor is operating at 100% power.
  • An RCS Leak Rate is in progress in accordance with 1-OPT-RC-10.0, Reactor Coolant Leakage Computer Calculated.

Current Conditions:

Which of the following identifies:

1) In accordance with OP-AP-105, Post Trip Review, the minimum authority who must authorize Reactor Restart following completion of recovery actions is the
2) The RCS Leakrate is required to be completed in accordance with TS-4.13 Basis.

A. 1) Manager Nuclear Operations.

2) Shiftly.

B. 1) Manager Nuclear Operations.

2) Daily.

C. 1) Site Vice President.

2) Shiftly.

D. 1) Site Vice President.

2) Daily.

Question: 96 Given the following:

  • Unit 1 and Unit 2 are at 100%.
  • 1 -EPT-Ol 06-03, Emergency Diesel No. 1 Battery Service Test has just been turned in for review as UNSAT.
  • All other PMT items have been completed as Sat.

Which ONE of the following correctly answers the questions regarding returning Emergency Diesel No.

1 to service per VPAP 2003, Post Maintenance Testing:

1) Can Emergency Diesel No. 1 be returned to service without performing rework, with an Engineering justification that the test failure does not affect operability?
2) Which department is responsible for making the final determination of operability?

A. 1)Yes.

2) Engineering.

B. 1)Yes.

2) Operations.

C. 1)No.

2) Engineering.

D. 1)No.

2) Operations.

Question: 97 A licensed operator commences the release of a waste gas decay tank in accordance with OP-23.2.4, Release of Waste Gas Decay Tank 1 B. Initial Hydrogen concentration in WGDT 1 B is 67.3%. A spike results in the process vent radiation monitor, 1-GW-Rl-130, entering into ACCIDENT mode. The release is subsequently isolated in accordance with O-RMA-C7, Process Vent Normal Range Gas Alert/HI, and activity returns to pre-event levels.

Which ONE of the following states:

1) The maximum release rate from a WGDT 1 B is based on
2) The procedure used to return the radiation monitor to Normal Mode.

A. 1) the release permit

2) l&C resets the RM using an Instrument Maintenance Procedure.

B. 1) the Hydrogen concentration

2) I&C resets the RM using an Instrument Maintenance Procedure.

C. 1) release permit

2) Operations resets the RM using O-RMA-C7.

D. 1) the Hydrogen concentration

2) Operations resets the RM using O-RMA-C7.

Question: 98 Given the following conditions:

  • A General Emergency has been declared.
  • An individual has been injured in the Auxiliary Building penetration area.
  • Dose rates in the area are 140 Rem/hr.
  • It will take a maximum of 10 minutes to remove the individual from the area.

Which ONE of the following correctly describes the EPIP 4.04 requirements for:

1) Solicitation of a volunteer to rescue the individual.
2) Use of an RWP.

A. 1) Anticipated dose rates do NOT require the SEM to solicit volunteers to remove the injured worker.

2) An RWP is NOT required provided the SEM authorizes the activity.

B. 1) Due to anticipated dose for rescue workers, the SEM can assign ONLY volunteers to remove the injured worker.

2) An RWP is NOT required provided the SEM authorizes the activity.

C. 1) Anticipated dose rates do NOT require the SEM to solicit volunteers to remove the injured worker.

2) The SEM may NOT waive the requirement for an RWP.

D. 1) Due to anticipated dose for rescue workers, the SEM can assign ONLY volunteers to remove the injured worker.

2) The SEM may NOT waive the requirement for an RWP.

Question: 99 Initial Conditions:

  • Unit 1 was initially at 100% power.

Current Conditions:

  • A severe thunderstorm has caused a Loss of Off-Site Power (LOOP).
  • Storm generated missiles have destroyed the following tanks.
  • 1 & 2-CN-TK-2 (Normal ON Storage Tanks).
  • 1-CN-TK-1 (Emergency ON Storage Tank).
  • 1-FP-TK-1A & lB (Fire Protection Tanks).
  • At the completion of 1-ES-0.1, Reactor Trip Response, the operating team determines that a Natural Circulation Oooldown must be performed at a rate that will cause Reactor Vessel Head void formation.

Which ONE of the following states the required procedural transition for Unit 1?

A. Go directly to 1-ES-0.3, Natural Circulation Cooldown with Steam Void in Rx Vessel.

B. Go directly to 1-ES-0.4, Natural Circulation Cooldown with Steam Void in Rx Vessel Without RVLIS.

C. Go to 1-ES-0.2, Natural Circulation Cooldown. Initiate ROS cooldown, then transition to 1-ES-0.3, Natural Circulation Cooldown with Steam Void in Rx Vessel.

D. Go to 1-ES-0.2, Natural Circulation Cooldown. Initiate RCS cooldown, then transition to 1-ES-0.4, Natural Circulation Cooldown with Steam Void in Rx Vessel Without RVLIS.

Question: 100 Given the following sequence of events:

  • Unit 1 tripped from 100% power due to A SG fault in Unit 1 Safeguards.
  • The TDAFW pump, 1-FW-P-2, tripped on startup.
  • SG narrow-range levels are off-scale low.
  • A and B MDAFW pump trip and lock-out.
  • The Team has completed Step 1 when the STA reports a red-path exists on Heat Sink CSF status tree.

Which ONE of the following describes:

1) The first source of AFW directed to be restored in accordance with 1-FR-Hi, Response to Loss of Heat Sink.
2) Sequence of procedure transitions for this event.

A. 1) AFW from Unit 2 via the cross-tie.

2) 1-FR-H.1, Response to Loss of Heat Sink; 1-ECA-2.1, Uncontrolled Depressurization of All S/Gs.

B. 1) Unit 1 Main Feed Water.

2) 1-FR-Hi, Response to Loss of Heat Sink; 1-ECA-2.1, Uncontrolled Depressurization of All S/Gs.

C. 1) Unit 1 Main Feed Water.

2) 1-FR-H.i, Response to Loss of Heat Sink; 1-E-2, Faulted S/G Isolation; 1-ECA-2.i, Uncontrolled Depressurization of All S/Gs.

D. 1) AFW from Unit 2 via the cross-tie.

2) i-FR-Hi, Response to Loss of Heat Sink; i-E-2, Faulted S/G Isolation; i-ECA-2.i, Uncontrolled Depressurization of All S/Gs.

-t.

5-3 (D
5

-f 1:::

-IHHH a

(D - - (D r (D (D I

-f Li 0

0) V)
0) -1 0 Wf -*
5 )

0

_._i n,

-f ><

I I

2015 NRC ANSWER KEY Question # Answer SRO 76 A 77 D 78 C 79 A 80 C 81 C 82 A 83 B 84 B 85 C 86 D 87 D 88 B 89 D 90 A 91 D 92 C 93 D 94 C 95 D 96 B 97 A 98 A 99 C 100 D NRC Validation Page 2