Integrated Inspection Report 05000338/2020003 and 05000339/2020003 and Exercise of Enforcement Discretion
ML20310A166
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 11/05/2020
From: Mark Miller
Division Reactor Projects II
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
References
EA-20-092 IR 2020003
Download: ML20310A166 (35)


Text

November 5, 2020

SUBJECT:

NORTH ANNA POWER STATION - INTEGRATED INSPECTION REPORT 05000338/2020003 AND 05000339/2020003 AND EXERCISE OF ENFORCEMENT DISCRETION

Dear Mr. Stoddard:

On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at North Anna Power Station. On October 14, 2020, the NRC inspectors discussed the results of this inspection with Mr. F. Mladen and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This inspection report documents an exercise of enforcement discretion in accordance with the NRC Enforcement Policy, Section 3.10, Reactor Violations With No Performance Deficiencies, for an issue that closely matched a Severity Level III violation example in Section 6.1.c.1 of the Enforcement Policy. The inspectors concluded that there was no performance deficiency associated with the 1J emergency diesel generator piston pin bushing failure because the equipment failure was not avoidable by reasonable licensee quality assurance measures or management controls.

Based on the facts detailed in the enclosed report, and consultation with the Office of Enforcement and the Regional Administrator, I have been authorized to exercise enforcement discretion in accordance with Section 3.10 of the Enforcement Policy, and refrain from issuing enforcement for the violation. This violation will not be considered in the assessment process or the NRCs Action Matrix. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Mark S. Miller, Director Division of Reactor Projects

Docket Nos. 05000338 and 05000339 License Nos. NPF-4 and NPF-7

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000338 and 05000339

License Numbers:

NPF-4 and NPF-7

Report Numbers:

05000338/2020003 and 05000339/2020003

Enterprise Identifier: I-2020-003-0062

Licensee:

Virginia Electric & Power Co

Facility:

North Anna Power Station

Location:

Mineral, VA

Inspection Dates:

July 1, 2020 to September 30, 2020

Inspectors:

M. Tobin, Senior Resident Inspector

G. Eatmon, Resident Inspector

P. Niebaum, Senior Project Engineer

A. Patz, Resident Inspector

B. Towne, Resident Inspector

D. Jackson, Project Engineer

D. Bacon, Senior Operations Engineer

B. Collins, Senior Reactor Inspector

J. Diaz-Velez, Senior Health Physicist

B. Kellner, Senior Health Physicist

W. Pursley, Health Physicist

S. Sanchez, Senior Emergency Preparedness Inspector

C. Fontana, Emergency Preparedness Inspector

J. Walker, Emergency Response Inspector

Approved By:

Stewart N. Bailey, Chief

Reactor Projects Branch 4

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at North Anna Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

Type Issue Number Title Report Section Status LER 05000338/2020-001-01 Degraded Upper Cylinder Piston Pin Bushing Discovered during Maintenance Activities on Emergency Diesel Generator [Rev. 1]

71153 Closed LER 05000338/2020-001-00 Degraded Upper Cylinder Piston Pin Bushing Discovered during Maintenance Activities on Emergency Diesel Generator [Rev. 0]

71153 Closed EDG EA-20-092 Enforcement Action (EA) 20-092: 1J Emergency Diesel Generator (EDG)

Exceeded TS Allowed Outage Time -

Violation Without a Performance Deficiency 71153 Closed

PLANT STATUS

Unit 1 operated at or near rated thermal power for the entire inspection period.

Unit 2 began the inspection period at rated thermal power. On September 13, 2020, the unit was shut down for a planned refueling outage. The unit remained shut down for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week, increasing the amount of time on site as local COVID-19 conditions permitted. As part of their onsite activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities; and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

External Flooding Sample (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated that flood protection barriers, mitigation plans, procedures, and equipment are consistent with the licensees design requirements and risk analysis assumptions for coping with external flooding.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1, Low Head Safety Injection, Train A, while Unit 1, Charging Pump 'A' was out of service on July 15, 2020.
(2) Unit 2, Quench Spray, Train A, while Unit 2, Quench Spray Pump 'B' was out of service on August 11, 2020.

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the Unit 2 casing cooling system on August 26, 2020.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Unit 1 and Unit 2, Cable Tray Spreading and Battery Room 2-1, 1-1, 2-3, 1-3 on July 6, 2020
(2) Unit 2, Cable Vault and Tunnel and 280' Rod Drive on July 16, 2020
(3) Unit 1 and Unit 2, Safeguards Area on August 13, 2020
(4) Unit 2, Motor Generator Set House on August 22, 2020
(5) Station Blackout Diesel Building on August 23, 2020

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Unit 1 and Unit 2 Safeguards Areas on August 13, 2020

71111.07A - Heat Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) Common spent fuel pool heat exchangers

===71111.07T - Heat Sink Performance

Triennial Review (IP Section 03.02)===

The inspectors evaluated heat exchanger/sink performance on the following from July 27-31, 2020:

(1) Unit 1 B component cooling water heat exchanger (1-CC-E-1B), Section 02.02b
(2) Unit 1 A residual heat removal heat exchanger (1-RH-E-1A), Section 02.02b
(3) Unit 2 C main control room/switchgear room cooler (2-HV-E-4C-2), Section 02.02b
(4) Unit 2 B charging pump lube oil/gearbox coolers (2-CH-E-1B1, 2-CH-E-5B),

Section 02.02b

71111.08P - Inservice Inspection Activities (PWR) PWR Inservice Inspection Activities Sample (IP Section 03.01)

The inspectors evaluated pressurized water reactor non-destructive testing by reviewing the following examinations from September 21-25, 2020:

(1)03.01.a - Nondestructive Examination and Welding Activities.

1. Ultrasonic Examination (UT)

a. pressurizer longitudinal weld (12050-WMKS-RC-E-2 / 2-RC-E-2 / 1), ASME Class 1 (reviewed)b. 6" feedwater system weld (12050-WMKS-0102D / 6-WFPD-419 / 27 BPL 551), ASME Class 2 (reviewed)c. 2" reactor coolant system welds (12050-WMKS-0103CB/2-RC-455/10, /78,

/SW-64, /SW-65), ASME Class 1 (reviewed, including weld documentation)d. 4" control rod drive mechanism weld (12050-WMKS-RC-R-1.2 / 2-RC-R-1 /

CRD-43), ASME Class 1 (reviewed)

2. Liquid Penetrant Examination (PT)

a. 2" reactor coolant system welds (12050-WMKS-0103CB/2-RC-455/10, /78,

/SW-64, /SW-65), ASME Class 1 (reviewed, including weld documentation)

03.01.b - Pressurized-Water Reactor Vessel Upper Head Penetration Examination Activities.

1. Bare Metal Visual Examination

a. reactor vessel head (all visible surfaces under insulation package), ASME Class 1 (reviewed)

03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities.

The inspectors reviewed the licensee's boric acid corrosion control program performance.

03.01.d - Pressurized-Water Reactor Steam Generator Tube Examination Activities.

The inspectors reviewed the licensee's justification for skip-cycle approach on steam generator ISI activities.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (2 Samples)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during a fire drill on August 24, 2020
(2) The inspectors observed and evaluated licensed operator performance in the Control Room during the Unit 2 shutdown for refueling outage on September 12, 2020

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated a training drill on July 14, 2020

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Unit 1: 1H emergency diesel generator (EDG) tripped after starting on April 19, 2020
(2) Unit 1: 1J EDG removed from service due to elevated copper levels in the oil on February 16, 2020

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed;

(1) Unit 1 and 2 in elevated green risk due to the diesel fuel above ground tank inspections on August 10, 2020
(2) Unit 2 in elevated shutdown risk due to decreased inventory for vessel head removal on September 16, 2020

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 1 H EDG following crankcase overpressure trip on July 22, 2020
(2) Unit 2 control rods following an urgent rod failure alarm on August 3, 2020
(3) Station Blackout diesel following an aborted surveillance due to high engine temperatures on August 11, 2020
(4) Turbine-driven auxiliary feedwater pump with water intrusion into the oil system on September 8, 2020
(5) C reserve station service transformer (RSST) trouble alarm on August 10, 2020
(6) Unit 1 and Unit 2 condensate storage tank due to leakage from the auxiliary feedwater pump seals on July 13, 2020

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 2 service water motor-operated valves (2-SW-MOV-203 A/C and 2-SW-MOV-204A/C) replacements on September 30, 2020

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:

(1) Unit 1, Control Room Chiller, 1-HV-E-4A, corrective maintenance after failure to pass a Technical Specification surveillance requirement on July 15, 2020
(2) Unit 2, repair of MIC leak in Service Water pipe associated with Charging Pump 'C' oil cooler, 2-CH-P-1C, on July 15, 2020
(3) Unit 1 and 2, station blackout diesel generator after surveillance run failure on September 22, 2020
(4) Unit 2, 2-PT-88.3J, Station Battery 2-III Modified Performance Test, on September 28, 2020

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)

(1)

(Partial)

The inspectors evaluated refueling outage 2R27 activities from September 13, 2020 to September 30, 2020

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Unit 1, Control Room Chiller, 1-HV-E-4A, performance test and associated chiller failure of the performance test on July 7, 2020
(2) Unit 1 Reactor Protection System and Engineered Safety Features Resistance Temperature Detector response time testing on July 24, 2020

Inservice Testing (IP Section 03.01) (1 Sample)

(1) Unit 2, Quench Spray Pump, Train B, 2-QS-P-1B, performance test on August 11, 2020

Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)

(1) 2-PT-61.3, Type C testing, penetration 94 on September 28, 2020

FLEX Testing (IP Section 03.02) (1 Sample)

(1) Unit 1 and 2 Beyond Design Basis Auxiliary Feedwater Pump test on September 22, 2020

71114.01 - Exercise Evaluation

Inspection Review (IP Section 02.01-02.11) (1 Sample)

(1) The inspectors evaluated the biennial emergency plan exercise during the week of August 17, 2020. The simulated scenario began with an earthquake of magnitude greater than the Operational Bases Earthquake, thus meeting the criteria for declaration of an Alert. A significant aftershock caused damage to the spent fuel pool, resulting in a 300 gallon per minute leak. Subsequently, a small break loss of coolant accident (LOCA) occurred, resulting in a reactor trip and safety injection, along with a report from Chemistry that the dose equivalent iodine exceeded the threshold for indication of a loss of fuel clad barrier. This met the conditions for declaring a Site Area Emergency. When a large break LOCA occurred and both containment spray trains became inoperable for different reasons, conditions for a General Emergency were met, and the offsite response organizations were able to demonstrate their ability to implement emergency actions.

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated submitted Emergency Action Level, Emergency Plan, and Emergency Plan Implementing Procedure changes during the week of August 17, 2020. This evaluation does not constitute NRC approval.

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) Emergency Preparedness Drill on July 14, 2020

71114.08 - Exercise Evaluation Scenario Review

Inspection Review (IP Section 02.01 - 02.04) (1 Sample)

(1) The inspectors reviewed and evaluated in-office, the proposed scenario for the biennial emergency plan exercise at least 30 days prior to the day of the exercise.

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazard Assessment (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.

Instructions to Workers (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated radiological protection-related instructions to plant workers.

Contamination and Radioactive Material Control (IP Section 03.03) (3 Samples)

The inspectors evaluated licensee processes for monitoring and controlling contamination and radioactive material.

(1) Evaluated the licensee's physical and programmatic controls for non-fuel radioactive material in the spent fuel pool.
(2) Observed material handlers supported by radiation protection technicians during the installation and removal of radioactive outage support equipment at the Unit 2 reactor building containment equipment hatch during the Unit 2 fall Outage.
(3) Observed workers removing protective clothing exiting Unit 2 containment at the personnel hatch during the Unit 2 fall Outage.

Radiological Hazards Control and Work Coverage (IP Section 03.04) (5 Samples)

The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.

(1) Removal of Pressurizer Safety Relief Valve under RWP #20-2115. This work involved a breach of the reactor coolant system boundary.
(2) Removal of the Unit 2 Transfer Canal Blind Flange under RWP #20-2253 which involved high dose rates, high contamination levels, high dose gradients, and the use of respiratory protection.
(3) Reactor vessel head stud de-tensioning on RWP #20-2251 which involved dose gradients in a high radiation area.
(4) NDE testing and preparations for the removal of 2B reactor coolant pump motor under RWP # 20-2204 involving work in a high radiation area.
(5) Maintenance check outs of the fuel handling bridge gripper tube assembly on RWP
  1. 20-2251 involving potential alpha level III controls.

High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (4 Samples)

The inspectors evaluated licensee controls of the following High Radiation Areas and Very High Radiation Areas:

(1) Unit 1 Volume Control Tank Room in the Auxiliary Building
(2) Unit 2 A Gas Stripper Room in the Auxiliary Building
(3) Unit 2 B Reactor Coolant Pump Cubicle in Containment
(4) Unit 1 personnel hatch

Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)

(1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Permanent Ventilation Systems (IP Section 03.01) (2 Samples)

The inspectors evaluated the configuration of the following permanently installed ventilation systems:

(1) Unit 1 and 2 Auxiliary Building Ventilation System
(2) Fuel Handling Building Ventilation System

Temporary Ventilation Systems (IP Section 03.02) (5 Samples)

The inspectors evaluated the configuration of the following temporary ventilation systems:

(1) HEPA #26 Setup for valve test stand/booth - DOP Test Date 06/26/2020
(2) S/N 2045 Staged for use in Unit 2 Containment - DOP Test Date 08/21/2020
(3) S/N 2090 Staged for use in Unit 2 Containment - DOP Test Date 08/21/2020
(4) Air powered Vacuum S/N 30 Staged for use in Unit 2 Containment - DOP Test Date 07/11/2019
(5) Air powered Vacuum S/N 34 Staged for use in Unit 2 Containment - DOP Test Date 07/11/2019

Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees use of respiratory protection devices.

Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses.

71124.04 - Occupational Dose Assessment

Source Term Characterization (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated licensee performance as it pertains to radioactive source term characterization. Reviewed Alpha Source Term Characterization Reports for Units 1 and 2, dated August 8, 2019, and January 28, 2019, respectively.

External Dosimetry (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated licensee performance as it pertains to external dosimetry that is used to assign occupational dose.

Internal Dosimetry (IP Section 03.03) (3 Samples)

The inspectors evaluated the following internal dose assessments for actual internal exposures:

(1) Whole Body Count (WBC) records for a personnel contamination event (facial),09/15/2019
(2) Reviewed WBC records for CR 1117959 for positive random WBC, 03/11/2019
(3) Reviewed WBC records for CR 1131001 for positive random WBC, 09/15/2019

Special Dosimetric Situations (IP Section 03.04) (2 Samples)

The inspectors evaluated the following special dosimetric situations:

(1) Reviewed dose assessment for two declared pregnant workers
(2) Multi-badging of workers removing the blind flange in the Unit 2 fuel transfer canal

71124.05 - Radiation Monitoring Instrumentation

Walkdowns and Observations (IP Section 03.01) (6 Samples)

The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:

(1) Unit 2 Containment High Range Radiation Monitors RMS-265A and B
(2) Unit 2 Containment Entrance Area Radiation Monitor 2-RM-ARM-261
(3) Unit 1 Containment Airborne Radiation Monitor 1-RM-RMS-159/160
(4) Unit 2 Containment Airborne Radiation Monitor 2-RM-RMS-259/260
(5) Unit 1 and 2 Steam Generator Blowdown Radiation Monitors RMS-122, 123, 124 and RMS 222, 223, 224
(6) Portable friskers located at various locations in the auxiliary building

Calibration and Testing Program (IP Section 03.02) (13 Samples)

The inspectors evaluated the calibration and testing of the following radiation detection instruments:

(1) Telepole survey meter - Serial Number (S/N) 6607-037, 09/11/2019 and 0729/2020
(2) RO20AA Ion Chamber survey meter - S/N 176AA, 02/14/2018, 02/26/2019
(3) RadEye G survey meter - S/N 30039, 08/24/2018, 01/31/2019
(4) RadEye GX frisker survey meter - S/N 11635, 02/08/2019, 03/06/2020
(5) Sirius-5PAB hand and foot monitor - S/N 1508-117, 02/11/2019, 07/30/2020
(6) SAM-11 (small article monitor) - S/N 601, 01/21/2019, 0716/2020
(7) AMP-100 underwater survey meter - S/N 5097-021/021, 07/17/2017, 09/18/2019
(8) AMS-4 Continuous air monitor - S/N 1551, 10/24/2018, 10/09/2019; S/N 1040, 02/04/2019, 02/13/2020
(9) GEM-5 portal monitor - S/N 1810-300, 12/11/2019
(10) Ludlum 3030 alpha/beta scaler - S/N 328901, 07/23/2019, 01/14/2020; S/N 328913, 07/24/2019, 08/19/2020
(11) Ludlum 2000 alpha scaler - S/N 310621/PR329674, 10/03/2017, 01/23/2020
(12) Low Volume Gooseneck air sampler - S/N 6244, 09/27/2018, 03/03/2020; S/N 6245, 09/05/2017 02/28/2019
(13) High Volume air sampler - S/N 8629, 08/19/2019, 08/03/2020; S/N 11909, 08/01/2019, 08/03/2020

Effluent Monitoring Calibration and Testing Program Sample (IP Sample 03.03) (2 Samples)

The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:

(1) Liquid effluent radiation monitors 1-LW-RM-110 and 111
(2) Normal-Range and High Range Process Vent, Ventilation Vent A, and Ventilation Vent B Effluent Monitor skids

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

EP01: Drill/Exercise Performance (IP Section 02.12)===

(1) April 1, 2019, through June 30, 2020

EP02: ERO Drill Participation (IP Section 02.13) (1 Sample)

(1) April 1, 2019, through June 30, 2020

EP03: Alert & Notification System Reliability (IP Section 02.14) (1 Sample)

(1) April 1, 2019, through June 30, 2020

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (2 Samples)

(1) Unit 1 (July 2019 - June 2020)
(2) Unit 2 (July 2019 - June 2020)

MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)

(1) Unit 1 (July 2019 - June 2020)
(2) Unit 2 (July 2019 - June 2020)

BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (2 Samples)

(1) Unit 1 (July 2019 - June 2020)
(2) Unit 2 (July 2019 - June 2020)

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1) April 2019 to June 2020

PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)

(1) August 2019 to June 2020

71152 - Problem Identification and Resolution

Semiannual Trend Review (IP Section 02.02) (1 Sample)

(1) Inspectors reviewed a licensee-identified trend in missed surveillances and preventative maintenance to determine if a larger issue is occurring on site. The inspectors did not identify any trend beyond what the licensee had already identified, and licensee corrective actions appear to be adequate to address the trend.

Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Unit 1 J emergency diesel generator inoperability on September 16, 2020
(2) Unit 1 and Unit 2 intercell connection resistance readings for the station and diesel batteries on September 22, 2020

71153 - Followup of Events and Notices of Enforcement Discretion Event Report (IP Section 03.02)

The inspectors evaluated the following licensee event reports (LERs):

(1) LER 05000338/2020-001-00, and -01, Degraded Upper Cylinder Piston Pin Bushing Discovered during Maintenance Activities on Emergency Diesel Generator, (Agency Document and Management System (ADAMS) Accession No. ML20122A056). The NRC exercised enforcement discretion in Enforcement Action (EA)-2020-092, in accordance with Section 3.10 of the Enforcement Policy because the violation was not associated with a licensee performance deficiency. The enforcement discretion is documented in the results section of this report. This LER is closed.

INSPECTION RESULTS

Enforcement Discretion Enforcement Action EA-20-092: 1J Emergency Diesel Generator (EDG) Exceeded TS Allowed Outage Time - Violation Without a Performance Deficiency 71153

Description:

On February 18, 2020, during planned maintenance activities, brass shavings were discovered on the upper crankcase of the 1J emergency diesel generator (EDG). Further investigation revealed degradation of the number one cylinder upper piston pin bushing. This was likely caused by a degradation of the connecting rod aluminum cooling oil spherical retainer ring, which resulted in an increased oil bypass flow and subsequent inadequate lubrication (oil wedge) between the piston pin and the piston pin bushing. Over time, the inadequate lubrication led to bushing degradation that created the shavings that were the visual indication of a failure. Subsequent maintenance activities and inspections were performed on additional EDG cylinders with no indication of abnormal wear or degradation. The affected cylinder and cylinder internals were all replaced, and the EDG was returned to service on February 26, 2020.

The licensee determined that the significant bushing degradation occurred during the surveillance run on January 22, 2020. Although the EDG never actually failed any surveillance tests, it was determined that the EDG would likely have been unable to meet its 30-day mission time following the previous successful surveillance on December 16, 2019.

Prior to the failure, the on-site diesel engineer determined that the slowly rising trend in engine oil copper concentration warranted increased observation, including increased frequency of surveillances for trending purposes, and an increased scope of the maintenance planned for February 2020. At no point did the EDG exceed the allowable copper levels that were provided by the equipment manufacturer. Therefore, the licensee identified that the EDG internals were experiencing wear but had no reason to suspect that the extent of the wear could challenge the operability of the EDG.

The inspectors reviewed the LER and the Level of Effort Evaluation (cause evaluation)conducted by the licensee, and conducted a review of relevant operating experience to determine whether a performance deficiency was associated with this type of EDG degradation. Although the LER discussed that inadequate lubrication was the apparent cause of the failure, there was no evidence in the timeframe of the increasing copper trend that would have indicated a loss of lubrication, nor did the EDG copper levels enter the alert range or require any specific action based on vendor recommendations. Following identification of the failed bushing, the licensee completed extensive inspection, analysis and operating experience review to identify the root cause. The licensee and vendor determined that this was a first-of-a-kind failure in nuclear applications.

The inspectors concluded that this failure was not reasonably foreseeable and preventable by the licensee and subsequently, the technical specification (TS) violation was not a result of a clearly defined and identifiable performance deficiency, therefore this event will be appropriately addressed using traditional enforcement under the NRCs Enforcement Policy.

The LER documented that the latent failure of the 1J EDG existed for approximately 72 days, which exceeded the T.S. 3.8.1 Condition B allowed outage time of 14 days. The LER additionally documented that both EDGs were out of service for approximately 39.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, which exceeded the T.S. 3.8.1 Condition I allowed outage time of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

The NRC Enforcement Policy, Section 6, Violation Examples states, in part, that when an enforcement case scenario very nearly achieves all or some of the criteria set forth in an example, the case should be considered to be at the severity level of that example. For this event, the TS violation closely matched example 6.1.c.1 for a Severity Level (SL) III violation for the licensees failure to shut down the reactor or follow actions required by TS when a Limited Condition for Operation was not met (i.e., noncompliance with 10 CFR 50.36(c)(2)(i)).

The NRC did not complete a detailed risk assessment of this event. This decision was based on not having an underlining performance deficiency associated with the event, the ability to use enforcement discretion for violations without a performance deficiency, and having an applicable SL III violation example in the NRC Enforcement Policy. The SL III example approximately bounded the upper severity level of the event.

Corrective Actions: The licensee replaced the piston pin bushing and associated components. Additionally, the licensee plans to review and modify the elemental analysis wear metal criteria for the EDG lubricating oil to establish a more conservative criterion and communicate these results to the Fairbanks Morse Diesel Owners Group.

Corrective Action References: CR1136269, CR1141471, CA7899887

Enforcement:

Violation:

T.S. 3.8.1, AC SourcesOperating, requires, in part, that two diesel generators capable of supplying the onsite Class 1E power shall be operable in Modes 1, 2, 3, and 4. T.S. 3.8.1, Action B, requires, in part, that if one diesel generator is inoperable, then restore the diesel generator to operable status within 14 days or be in at least hot standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in cold shutdown within the following 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

TS 3.8.1, Action I, requires, that if two EDGs are inoperable, restore one EDG to operable status within two hours.

Contrary to the above, from December 16, 2019, to February 26, 2020, the 1J EDG was inoperable due to a failed piston pin bushing. The EDG was not returned to operable status within 14 days and was not placed in hot standby within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Additionally, during several instances, from December 16, 2019, the 1H EDG was inoperable for normal maintenance and surveillance activities for approximately 39.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> concurrently with the 1J EDG. With both EDGs inoperable during this period, the licensee failed to restore one EDG to operable status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Basis for Discretion: The NRC exercised enforcement discretion in Enforcement Action (EA)-20-092, in accordance with Section 3.10 of the Enforcement Policy, because the violation was not associated with a licensee performance deficiency. Specifically, the violation was not attributable to equipment failures that were avoidable by reasonable licensee quality assurance measures or management controls. Therefore, inspectors concluded that there was no performance deficiency associated with the 1J EDG piston pin bushing failure. The affected 1J EDG cylinder and cylinder internals were replaced and the EDG was returned to an operable condition. This enforcement discretion will not be considered in the assessment process of the NRCs Action Matrix.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 14, 2020, the inspectors presented the integrated inspection results to Mr. F. Mladen, Site Vice President (VP) and other members of the licensee staff.
  • On July 30, 2020, the inspectors presented the Triennial Heat Sink Performance Inspection results to Ms. Lisa Hilbert, Plant Manager and other members of the licensee staff.
  • On September 24, 2020, the inspectors presented the North Anna Unit 2 Inservice Inspection results to Mr. Fred Mladen, Site VP and other members of the licensee staff.
  • On September 25, 2020, the inspectors presented the RP Inspection results to Mr. F. Mladen, Site VP and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Procedures

0-AP-41

Severe Weather Conditions

71111.04

Corrective Action

Documents

CR1144261

2-QS-ICV-3001 has dried boric acid on valve stem and

stem nut

04/04/2020

CR1152813

2K-E7 (RS Pump Casing Cooling Tank Level Hi/Lo) is

locked in.

Corrective Action

Documents

Resulting from

Inspection

CR1151645

NRC Identified: equipment staged in yard near U1

QSPH/SFGDS

7/15/2020

Drawings

2050-FM-091B

Flow/Valve Operating Numbers Diagram Containment

Quench and Recirc Spray Sub System, North Anna Unit 2

Miscellaneous

System Health Report for Recirc Spray System - Q2-2020

NCRODP-54-NA

System Description - Recirculation Spray System

10/16/2018

Procedures

1-OP-7.1A

Operating Procedure, Valve Checkoff - Low Head Safety

Injection System

2-OP-7.10

Operation of Casing Cooling Subsystem of the Recirc

Spray System

2-OP-7.10A

Valve Checkoff - Casing Cooling System

2-OP-7.4A

Valve Checkoff - Quench Spray System

71111.05

Corrective Action

Documents

Resulting from

Inspection

CR1153950

Fire Plans

0-FS-CT-1

Loss Prevention Fire Strategy, Cable Tray Spreading and

Battery Room 2-1, 1-1, 2-3, 1-3

1-FS-SBO-1

Station Blackout Building Fire Fighting Strategy

1-FS-SG-1

Fire Fighting Strategy for Safeguards Area Safe Shutdown

Equipment Unit 1

2-FS-MG-1

Fire Fighting Strategy for Motor Generator Set House Unit

2-FS-S-2

Fire Fighting Preplan for Cable Vault and Tunnel and 280'

Rod Drive Unit 2 Safe Shutdown Equipment

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2-FS-SG-1

Fire Fighting Strategy for Safeguards Area Safe Shutdown

Equipment Unit 2

Procedures

0-PT-105.3

Hose House Inspection

CM-AA-FPA-100

Fire Protection/ Appendix R (Fire Safe Shutdown) Program

71111.06

Engineering

Evaluations

NOTEBK-PRA-

NAPS-IF.1B

Probabilistic Risk Assessment Model Notebook -

Partitioning and Source Identification and Characterization

- Flood Area Definition

NOTEBK-PRA-

NAPS-IF.2

Probabilistic Risk Assessment Model Notebook - Internal

Flooding - Flood Scenario Development

Miscellaneous

DNES-AA-GN-BAR-

1001

Passive Design Features and Barriers

71111.07A Corrective Action

Documents

CR1116423,

CR1115668,

CR555082

NDE Reports

WO 59102749337

Final Eddy Current Inspection Report for 1-FC-E-1A

2/07/2019

WO59102754078

Final Eddy Current Inspection Report for 1-FC-E-1B

2/20/2019

Procedures

ER-AA-HTX-10

Heat Exchanger Program

ER-AA-HTX-1004

Heat Exchanger Program Eddy Current Testing

71111.07T Calculations

NA-CALC-MEC-

ME-0530

Component Cooling Heat Exchanger Tube Plugging Study

Rev. 0

Corrective Action

Documents

CR1089486

Pipe Tee downstream of 1-SW-1110 Pin Hole Leak,

2/06/2018

CR1112654

Through-wall Leak on Service Water Socket Weld

associated with 2-CH-P-1A

2/17/2018

CR1131315

1-SW-P-25A Discharge Piping Leak

09/19/2019

CR1136853

Leak in Copper Pipe Elbow Upstream of 1-VSW-2

11/27/2019

CR1150998

MIC Leak in SW Piping Associated with 2-CH-P-1C

07/06/2020

Drawings

11715-FV-091A

Component Cooling Heat Exchangers Tube Sheet Bundle

- Tube Identification, 1-CC-E-1A, North Anna Power

Station

Rev. 0

11715-FV-091B

Component Cooling Heat Exchangers Tube Sheet Bundle

- Tube Identification, 1-CC-E-1B, North Anna Power

Station

Rev. 2

Miscellaneous

System Health Report Q2-2020 - Service Water

July 15,

20

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

89-572H

Letter from W.L. Stewart to United States Nuclear

Regulatory Commission, Virginia Electric and Power

Company North Anna Power Station Units 1 and 2

Consolidated Response to Generic Letter 89-13 Service

Water System Problems Affecting Safety-Related

Equipment"

October 18,

1991

Procedures

0-EPM-2303-01

Inspection of Service Water Cathodic Protection System

Rev. 14

0-EPM-2303-02

Corrosion Survey of Service Water Cathodic Protection

System

Rev. 1

0-PT-75.15

Generic Letter 89-13 Service Water System Testing

Requirements Coordination

Rev. 8

ER-AA-HTX-1002

Heat Exchanger Program Visual and Leak Testing

Rev. 6

ER-AA-HTX-1003

Heat Exchanger Monitoring and Assessment

Rev. 7

ER-AA-HTX-1004

Heat Exchanger Program Eddy Current Testing

Rev. 5

ER-AA-HTX-1005

Dominion Nuclear Fleet Heat Exchanger Guidelines for

Administrative Limits for Tube Plugging

Rev. 4

ER-NA-SYS-320

Generic Letter 89-13 Program

Rev. 6

VPAP-0811

Service Water System Inspection and Maintenance

Program

Rev. 6

71111.08P Calibration

Records

Dominion Energy Calibration Certificate: Digital

Thermometer (ATK-2)

4/25/2018

Dominion Energy Calibration Certificate: Digital

Thermometer (ATK-1)

7/22/2020

2018-59-003

Eastern NDT Certificate of Calibration: CA-811 Light Meter

(SN 1046JGCY)

11/30/2018

Corrective Action

Documents

CR1104243

Part 21 Notification: CRDM Sleeve Vulnerability

08/29/2018

CR1156057

Discoloration Noted on RV Head Surface

09/22/2020

Engineering

Evaluations

BACCP Evaluation Form: Boric Acid Found on 2-SS-TV-

200B

05.02.2019

BACCP Evaluation Form: Boric Acid Found on 2-CH-P-1B

05.02.2019

BACCP Evaluation Form: Boric Acid Noted on 1-RS-P-3B

06.12.2018

BACCP Evaluation Form: Seal Leakage from 2-RC-P-1C

05/06/2020

Inservice Inspection Indication Evaluation Record for Code

Case N-566-2 Compliance for 2-RC-P-1A

4/13/20

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

ETE-NA-2019-1002

Steam Generator Condition Monitoring and Operational

Assessment North Anna Unit 2

Rev. 0

Miscellaneous

Curtiss-Wright Personnel Certification Statement: UT

(Sauter)

07/24/2020

Curtiss-Wright Certification of Visual Acuity and Color

Vision per LMT Procedure PVE-1 (Sauter)

07/24/2020

Ray-Check Mfg. Inc. Certificate of Compliance: Angle

Beam Test Block (S/N 05-5560, S/N 05-8258)

9/6/05

Curtiss-Wright Personnel Certification Statement: UT

(Fish)

07/15/2020

Curtiss-Wright Certification of Visual Acuity and Color

Vision per LMT Procedure PVE-1 (Fish)

8/21/2020

Curtiss-Wright Personnel Certification Statement: UT

(Cochran)

07/15/2020

Curtiss-Wright Certification of Visual Acuity and Color

Vision per LMT Procedure PVE-1 (Cochran)

03/13/2020

ITLS Vision Acuity Certification (Dunn)

1/29/2019

Industrial Testing Laboratory Services, L.L.C. Certificate of

Qualification and Certification Summary: PT (Dunn)

2/5/2019

Curtiss-Wright Personnel Certification Statement: UT

(Hacker)

2/11/2018

Curtiss-Wright Certification of Visual Acuity and Color

Vision per LMT Procedure PVE-1 (Hacker)

8/15/18

Magnaflux Certificate of Certification: Spotcheck Developer

SKD-S2 (Batch 14F02K)

6/20/14

Magnaflux Certificate of Certification: Spotcheck Penetrant

SKL-SP2 (Batch 15J02K)

09/08/2015

Magnaflux Certification: Ultragel II Couplant (Batch

17F087)

06/30/2017

NDE Reports

UT-20-011

UT Calibration/Examination Record: 12050-WMKS-

0102D/6-WFPD-419/27 (BPL 551)

9/17/2020

UT-20-019

UT Calibration/Examination Record: 12050-WMKS-RC-E-

2/2-RC-E-2/1

9/22/2020

UT-20-020

UT Calibration/Examination Record: 12050-WMKS-RC-R-

9/25/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1.2/2-RC-R-1/CRD-43

Procedures

2-PT-48.6

Vessel Head Bare Metal Visual Inspection

Rev. 7

ER-AP-BAC-10

Boric Acid Corrosion Control Program

Rev. 13

ER-AP-BAC-101

Boric Acid Corrosion Control Program (BACCP)

Inspections

Rev. 13

ER-AP-BAC-102

Boric Acid Corrosion Control Program (BACCP)

Evaluations

Rev. 14

Work Orders

WO59203285848

Replacement of A Loop Drain Piping

Rev. 0

71111.12

Corrective Action

Documents

CA7876917

Maintenance Rule (MR) Functional Failure Evaluation for

1-EE-EG-1J Upper Crank Debris

04/24/2020

CA7908528

Perform maintenance rule functional failure evaluation for

1H EDG

05/28/2020

CR1145061

1H EDG tripped after starting during 1-PT-82.2A

04/19/2020

Drawings

11715-ESK-11C

Elem. Diagram Emer Diesel Gen 1H Unit1, Sheet 1

11715-ESK-11C

Elem. Diagram Emer Diesel Gen 1H Unit1, Sheet 2

Procedures

ER-AA-MRL-100

Implementing Maintenance Rule

71111.13

Procedures

0-GOP-13.3

Assessment of Maintenance Activities for Potential Loss of

Reactor Coolant Inventory

2-OP-5.4

Draining the Reactor Coolant System

71111.15

Corrective Action

Documents

CA8082309

Investigate "self-test" programming of seismic sudden

pressure relay

08/14/2020

CR1152481

07/29/2020

CR1152649

07/31/2020

CR1152700

08/02/2020

CR1152700

08/02/2020

CR1152855

08/04/2020

CR1153080

08/07/2020

CR1153081

08/07/2020

CR1153223

Received XFMR 1C Trouble [H-D7]

08/10/2020

Drawings

11715-FE-21P

DC Elementary Diagram, Reserve Station Service

Transformer Protection, Units 1 and 2, Sheet 3

Engineering

Changes

NA-20-00058

Splash Guard on 1-FW-T-2 Turbine Shaft

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Engineering

Evaluations

OP-AA-102

Water in oil discovered from 1-FW-P-2 following quarterly

PT performance

Miscellaneous

Troubleshooting

Sheet for

CR1152481

Unit 2 IAC Rod Control Cabinet

Procedures

1-AR-42

1-EP-ST-2C, C Reserve Station Service Transformer

71111.18

Corrective Action

Documents

CA7672277

SW MOVs HBC-0 Qualified Stroke Count Exceeded

Engineering

Changes

NA-20-00006

2-SW-MOV-203A/C and 2-SW-MOV-204A/C Replacement

Miscellaneous

DNES-VA-EEN-

0011, Attachment 5

Standard for Protective Device Settings, Thermal Overload

Relays and Heater Coil Selection GL-89-10 MOVs

71111.19

Procedures

0-MCM-0803-01

Repair of the Control Room Air Conditioning Chillers (1/2-

HV-E-4A, B, and C) and Front Office Air Conditioning

Chillers (1-HV-E-3A, B, and C)

2-PT-88.3J

Station Battery 2-III Modified Performance Test

Work Orders

203311984

Repair of MIC Leak in SW piping associated with 2-CH-P-

1C

7/7/2020

203311997

Remove/Reinstall Piping to Support MIC Leak

7/7/2020

71111.20

Corrective Action

Documents

CR1154838

09/06/2020

CR1156216

09/24/2020

CR1156222

09/24/2020

Procedures

2-OP-3.7

Unit Shutdown from Mode 1 to Mode 5 for Refueling

71111.22

Corrective Action

Documents

CR1151128

CR1155066

09/10/2020

CR1155095

09/10/2020

Corrective Action

Documents

Resulting from

Inspection

CR1151508

Drawings

2050-FM-091A

Containment Quench and Recirc Spray Subsystem, Unit 2

Procedures

0-PT-9.4

Inspection of Roof Drains, Yard Drains, Roofs, and BDB

Lip Flood Barriers

1-PT-36.3.1

Reactor Protection and ESF RTD Response-Time Test

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

1-PT-77.13A

Control Room Chiller Equipment Performance Test (1-HV-

E-4A)

2-PT-63.1B

Operations Periodic Test - Quench Spray System - B

Subsystem

ER-AA-IST-PMP-

101

Inservice Testing of Pumps Implementation

Work Orders

WO59203294489

WO59203294614

WO59203305922

71124.01

Corrective Action

Documents

Condition Report

(CR) numbers:

CR1128473,

CR1130250,

CR1130457,

CR1130460,

CR1131921,

CR1132546,

CR1137961,

CR1139656,

CR1142362,

CR1149400, and

CR1153635

Condition Reports Reviewed during the Inspection

Procedures

RP-AA-201

Access Controls for High and Very High Radiation Areas

Revision 10

RP-AA-202

Radiological Posting

Revision 13

RP-AA-203

Radiological Labeling and Marking

Revision 5

RP-AA-222

Radiation Surveys

Revision 3

RP-AA-223

Contamination Surveys

Revision 4

RP-AA-225

Unrestricted Release of Material

Revision 8

RP-AA-232

Radioactive Material Control

Revision 9

RP-AA-274

Radiation Work Permits

Revision 9

Radiation

Surveys

20-2115/4

Remove Pressurizer Relief Valve 2RC-5V-255/C

09/15/2020

20-2251

Unit 2 Reactor Cavity Survey

09/17/2020

20-2251

Reactor Gripper Tube Assembly

09/16/2020

20-2253

Remove Blind Flange in Fuel Transfer Canal

09/14/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

20-2254

Unit 2 Reactor Containment 292 Shutdown Survey

09/13/2020

RWP Survey 20-

2018

Second Quarter ISFSI Pad Survey

06/01/2020

Survey RWP 20-

218-1

First Quarter ISFSI Pad Survey

2/20/2020

Radiation Work

Permits (RWPs)

20-2024

Reactor Coolant Pump Motor Removal

Revision 0

20-2115

Valves in HRA <50mr/hr

Revision 0

20-2251

Rx Head Disassembly

Revision 0

20-2253

Blind Flange Removal

Revision 0

Self-

Assessments

Audit 20-06

Radiological Protection, Process Control Program, and

Chemistry

07/24/2020

PA #7487304

Radioactive Contamination Control Program Assessment

09/19/2019

PA7487345

Radioactive Material Control Program Assessment

09/19/2019

PIR 1145372

Radiological Protection Review Dominion Fleet Collective

Radiation Exposure (CRE) Performance t

February

20

71124.03

Calibration

Records

LAC174790

Posi3 Complete SCBA Test

09/20/2020

LAC174790

Posi3 Complete SCBA Test

07/31/2019

LAC174790

Posi3 Complete SCBA Test

09/13/2018

LAC175813

Posi3 Complete SCBA Test

09/02/2020

LAC175813

Posi3 Complete SCBA Test

07/25/2019

LAC175818

Posi3 Complete SCBA Test

09/19/2019

LAC175825

Posi3 Complete SCBA Test, 09/12/2020

09/12/2020

LAC175825

Posi3 Complete SCBA Test

2/19/2020

LAC175825

Posi3 Complete SCBA Test

01/31/2019

Corrective Action

Documents

CR1104267,

CR1128465, and

CR1141954

Condition Reports Reviewed during the Inspection

Various

Miscellaneous

0-PT-114

Emergency Kit Inspection [of full face respirators] dated

2/26/2020, 05/21/2020, 06/16/2020, 07/14/2020, and

08/19/2020

Various

2-SA-109 Grade D

Air Certificate

2-SA-109 Grade D Air Certificate

2/18/2020

2-SA-109 Grade D

2-SA-109 Grade D Air Certificate

08/29/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Air Certificate

2-SA-111 Grade D

Air Certificate

2-SA-111 Grade D Air Certificate

08/29/2019

2-SA-111 Grade D

Air Certificate

2-SA-111 Grade D Air Certificate

2/18/2020

LAC175825

SCBA Repair Log

09/12/2020

Paint Shop Grade D

Air Certificate

Paint Shop Grade D Air Certificate

2/18/2020

Paint Shop Grade D

Air Certificate

Paint Shop Grade D Air Certificate

08/29/2019

RP-AA-163,

Monthly Radiological Use SCBA Inspection Record for

July, August, and September 2020

Various

Operability

Evaluations

1-PT-76.10A,

CONTROL ROOM

EMERGENCY

VENTILATION

SYSTEM

LABORATORY

ANALYSIS FOR

1-HV-FL-8, Feb.

20

1-PT-76.10A, CONTROL ROOM EMERGENCY

VENTILATION SYSTEM LABORATORY ANALYSIS

FOR

1-HV-FL-8, Feb. 2020

2/12/2020

1-PT-76.12B,

CONTROL ROOM

EMERGENCY

VENTILATION

SYSTEM - POST-

MAINTENANCE

TEST ON THE

HEPA FILTER OF

1-HV-FL-9, Jan.

20

1-PT-76.12B, CONTROL ROOM EMERGENCY

VENTILATION SYSTEM - POST-MAINTENANCE TEST

ON THE HEPA FILTER OF 1-HV-FL-9, Jan. 2020

01/20/2020

O-PT-77.14A -

ECCS PREACS

TRAIN A FILTER

O-PT-77.14A - ECCS PREACS TRAIN A FILTER IN-

PLACE TEST (1 -H V-FL-3A)

09/10/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

IN-PLACE TEST (1

-H V-FL-3A)

O-PT-77.14B -

ECCS PREACS

TRAIN B FILTER

IN-PLACE TEST (1-

HV-FL-3B)

O-PT-77.14B - ECCS PREACS TRAIN B FILTER IN-

PLACE TEST (1-HV-FL-3B)

11/14/2018

O-PT95.3 - FUEL

BUILDING

VENTILATION

SYSTEM -

NEGATIVE

PRESSURE TEST

O-PT95.3 - FUEL BUILDING VENTILATION SYSTEM -

NEGATIVE PRESSURE TEST

09/06/2019

RP-AA-163,

RP-AA-163 Inspection and Inventory of Respiratory

Protection Equipment-July 2020

07/16/2020

RP-AA-163,

RP-AA-163, Inspection and Inventory of Respiratory

Protection Equipment - August 2020

08/17/2020

Procedures

C-HP-1033.620

PORTABLE AIR SAMPLERS CALIBRATION AND

OPERATION

Rev. 9

C-HP-1033.640

PORTABLE SAMPLING PUMPS CALIBRATION AND

OPERATION

Rev. 6

C-HP-1033.650

RADECO RAD-PRO 5/10 PERSONAL AIR SAMPLERS:

CALIBRATION AND OPERATION

Rev. 1

C-HP-1042.122

QUANTITATIVE FIT TESTING: PORTACOUNT PRO FIT

TESTING SYSTEM

Rev. 12

C-HP-1042.210

RESPIRATORY HAZARDS EVALUATION AND

RESPIRATORY PROTECTION SELECTION

Rev. 4

C-HP-1042.220

AIRBORNE RADIOACTIVE MATERIAL EXPOSURE

AUTHORIZATION

Rev. 4

C-HP-1042.510

ATMOSPHERE-SUPPLYING RESPIRATORY

EQUIPMENT PERFORMANCE VERIFICATION

Rev. 8

C-HP-1042.520

RESPIRATORY PROTECTION PROGRAM EQUIPMENT

CRITERIA AND VERIFICATION

Rev. 6

HP-1042.405

RESPIRATORY PROTECTION EQUIPMENT: CLEANING

Rev. 6

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AND CONTAMINATION MONITORING

HP-1042.451

SELF-CONTAINED BREATHING APPARATUS

MAINTENANCE

Rev. 5

HP-1042.525

USE OF THE POSICHEK 3 COMPUTERIZED

PERFORMANCE TESTER TO VERIFY PERFORMANCE

OF RESPIRATORY PROTECTION EQUIPMENT

Rev. 4

RP-AA-160

Donning and Removal of Respiratory Protection

Equipment

Rev. 0

RP-AA-162

Issue and Control of Respiratory Protection Equipment

Rev. 5

RP-AA-163

Inspection and Inventory of Respiratory Protection

Equipment

Rev. 6

RP-AA-226

ALPHA MONITORING

Rev. 5

RP-AA-243

Portable HEPA Ventilation Units

Rev. 4

RP-AA-300

ALARA Reviews and Reports

Rev. 10

Self-

Assessments

Assessment #

PA7487388

Radiological Respiratory Protection Program Review

11/12/2019

71124.04

Corrective Action

Documents

CR1117838,

CR1117959, and

CR1131001

Condition Reports Reviewed during the Inspection

Various

Miscellaneous

North Anna Unit 1

Alpha Source Term

Characterization for

N1R27

North Anna Unit 1 Alpha Source Term Characterization for

N1R27

08/08/2019

North Anna Unit 2

Alpha Source Term

Characterization for

N2R26

North Anna Unit 2 Alpha Source Term Characterization for

N2R26

01/28/2019

NVLAP

Accreditation

Certificates

NVLAP Accreditation Certificates (07/2017-06/2020)

Various

Procedures

C-HP-1031.023

RWP DOSIMETRY: EXPOSURE CONTROL SUPPORT

Rev. 9

C-HP-1041.057

WHOLE BODY COUNTING INDIVIDUALS USING THE

PM-7

Rev. 3

C-HP-1042.210

RESPIRATORY HAZARDS EVALUATION AND

Rev. 4

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

RESPIRATORY PROTECTION SELECTION

HP-1041.048

APEX INVIVO WHOLE BODY COUNTER: OPERATION

AND PERFORMANCE CHECKS

Rev. 2

HP-1041.058

APEX INVIVO WHOLE BODY COUNTER: WHOLE BODY

COUNTING INDIVIDUALS

Rev. 0

HP-1041.068

APEX INVIVO WHOLE BODY COUNTER: CALIBRATION

Rev. 3

RP-AA-104

Internal Radiation Exposure Control Program

Rev. 2

RP-AA-105

External Radiation Exposure Control Program

Rev. 2

RP-AA-124

Dosimetry Investigation and Processing

Rev. 9

RP-AA-131

Whole Body Monitoring

Rev. 2

RP-AA-132

Urine and Fecal Sampling and Analysis

Rev. 1

RP-AA-133

Internal Dose Calculation Based on Radionuclide Intake

Rev. 0

RP-AA-134

Radionuclide Intake Determination Based on Bioassay

Results

Rev. 2

RP-AA-136

Internal Dose Calculations Based on DAC-Hour Exposure

Rev. 0

RP-AA-138

Declared or Expected Pregnant Woman

Rev. 2

RP-AA-224

Airborne Radioactivity Surveys

Rev. 5

RP-AA-230

Personnel Contamination Monitoring and Decontamination

Rev. 12

RP-AA-274

Radiation Work Permits

Rev. 9

Radiation

Surveys

0-HSP-ISFSI-001

INDEPENDENT SPENT FUEL STORAGE INSTALLATION

(ISFSI), HEALTH PHYSICS TLD SURVEY

SURVEILLANCE

08/26/2019

0-HSP-ISFSI-001

INDEPENDENT SPENT FUEL STORAGE INSTALLATION

(ISFSI), HEALTH PHYSICS TLD SURVEY

SURVEILLANCE

2/10/2019

0-HSP-ISFSI-001

INDEPENDENT SPENT FUEL STORAGE INSTALLATION

(ISFSI), HEALTH PHYSICS TLD SURVEY

SURVEILLANCE

2/24/2020

0-HSP-RCAD-001

QTR RESTRICTED AND CONTROLLED AREA DOSE

EVALUATION

06/15/2020

0-HSP-RCAD-001

QTR RESTRICTED AND CONTROLLED AREA DOSE

EVALUATION

06/19/2019

0-HSP-RCAD-001

QTR RESTRICTED AND CONTROLLED AREA DOSE

EVALUATION

09/20/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

0-HSP-RCAD-001

QTR RESTRICTED AND CONTROLLED AREA DOSE

EVALUATION

2/16/2019

0-HSP-RCAD-001

QTR RESTRICTED AND CONTROLLED AREA DOSE

EVALUATION

03/27/2020

71124.05

Calibration

Records

0-ICP-LW-RM-110

LIQUID WASTE EVAPORATOR RADIATION MONITOR

(RM-LW-1 10) CALIBRATION

05/07/2019

0-PT-44.2.48

PROCESS VENT NORMAL AND HIGH RANGE

EFFLUENT RADIATION MONITOR (GW-RM-178)

CHANNEL CALIBRATION

09/14/2018

0-PT-44.2.48

PROCESS VENT NORMAL AND HIGH RANGE

EFFLUENT RADIATION MONITOR

(GW-RM-178) CHANNEL CALIBRATION

03/17/2020

1-PT-38.2.2

LIQUID WASTE CLARIFIER RADIATION MONITOR (RM-

LW-111) CHANNEL CALIBRATION

08/24/2018

2-PT-34.8.5.3

CONTAINMENT RADIATION MONITORING

INSTRUMENT CALIBRATION (RMS-265)

03/22/2019

2-PT-34.8.5.4

CONTAINMENT RADIATION MONITORING

INSTRUMENT CALIBRATION (RMS-266)

03/22/2019

89-400 SN: 8282

DOSE RATE PROFILES FOR 89-400 SN: 8282 SOURCE

06/16/2020

89-400 SN:8256

DOSE RATE PROFILES FOR 89-400 SN:8256 SOURCE

06/16/2020

I -PT-38 2.2

LIQUID WASTE CLARIFIER RADIATION MONITOR (RM-

LW-111) CHANNEL CALIBRATION

08/29/2019

Corrective Action

Documents

CR1105666,

CR1114718,

CR1128265,

CR1128445,

CR1129493,

CR1131469,

CR1138758,

CR1139938,

CR1142555, and

CR1142758

Condition Reports Reviewed during the Inspection

Various

Miscellaneous

& 3 QTR

& 3 QTR RESULTS OF RADIOCHEMISTRY CROSS

Various

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

RESULTS OF

RADIOCHEMISTRY

CROSS CHECK

PROGRAM (2018)

CHECK PROGRAM (INSTRUMENT

INTERCOMPARISON: 2018)

Co-60 Source

Number 6012

Calibration

Certificate

Co-60 Source Number 6012 Calibration Certificate

10/19/2000

Cs-137 Source

Number 02-691

Calibration

Certificate

Cs-137 Source Number 02-691 Calibration Certificate

07/1989

CS-137 Source

Number 02-754

Calibration

Certificate

CS-137 Source Number 02-754 Calibration Certificate

07/1989

TL-204 Source

Number 6054

Calibration

Certificate

TL-204 Source Number 6054 Calibration Certificate

10/19/2000

Operability

Evaluations

1-PT-38.1.12

CONDENSER AIR EJECTOR IN-LINE RADIO GAS

RADIATION MONITOR (1-SV-RM-121) QUARTERLY

CHANNEL OPERATIONAL TEST

2/04/2020

2-PT-44.2.32

Main Steam Loop A Noble Gas High Range Effluent

Radiation Monitor (2-MS-RM-270) Channel Operational

Test

07/28/2020

Procedures

C-HP-1033.012

PORTABLE RADIATION PROTECTION

INSTRUMENTATION CONTROL

Rev. 7

C-HP-1033.440

NE TECHNOLOGY SAM-9/SAM-11 CALIBRATION AND

OPERATION

Rev. 10

C-HP-1033.533

MGP TELEPOLE: CALIBRATION AND OPERATION

Rev. 4

C-HP-1033.650

RADECO RAD-PRO 5/10 PERSONAL AIR SAMPLERS:

CALIBRATION AND OPERATION

Rev. 1

HP-1033.022

JL SHEPHERD MODEL 89 SHIELDED CALIBRATION

Rev. 4

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SYSTEM, OPERATION AND SURVEILLANCE

Self-

Assessments

PA7793983

Self-Assessment (Instruments) 2020

06/22/2020

Work Orders

59101904056

RAD MONITOR REPAIR

03/24/2017

59102865764

IPM/01-RM-RM-157 (RAD MONITOR CALIBRATION)

05/18/2017

59103069394

IPM/01-LW-RM-110 (RAD MONITOR CALIBRATION)

05/08/2019

59103085831

IPM/01-RM-RM-157 (RAD MONITOR CALIBRATION)

08/21/2019

71151

Corrective Action

Documents

CR1117403,

CR1128633,

CR1136184, and

CR1137727

Condition reports reviewed during inspection

Various

Miscellaneous

Electronic

Dosimeter

Dose/Dose Rate

Alarm Log

March 2019 through August 2020

Various

HP-3010.032

Gaseous Effluents Cumulative Dose Summary (January-

July/2020)

08/05/2020

HP-3010.22

Liquid Effluents Cumulative Dose Summary (January-

July/2020)

08/05/2020

ML20122A157

North Anna Power Station 2019 Annual Radiological

Environmental Operating Report

Procedures

LI-AA-500

NRC/INPO/WANO Performance Indicator and MOR

Reporting

Rev. 3

PI-AA-100-1000

Performance Indicators

Rev. 5

RP-AA-112

Radiation Safety Performance Indicator Reporting

Rev. 4

71152

Calculations

EE-0857

NAPS Station Batter 1-III Voltage Profile Calculation

Corrective Action

Documents

CA004535

01/08/2007

CR1143414

3/18/2020

CR1152771

08/03/2020

CR1153807

08/20/2020

Miscellaneous

PI-AA-100-1003 --

Performance Improvement Action Plan

71153

Miscellaneous

LER 2020-001-00

Technical Specification Required Shutdown due to Reactor

Coolant System Pressure Boundary Leakage

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

LER 2020-001-01

Degraded Upper Cylinder Piston Pin Bushing Discovered

during Maintenance Activities on Emergency Diesel

Generator

1