ML20245B829

From kanterella
Jump to navigation Jump to search
Forwards Amend 44 to GESSAR-238 Std Sar.Amend Provides Addl Info for Continuing Effort to Expedite Resolution of post- Preliminary Design Approval Items
ML20245B829
Person / Time
Site: 05000000, 05000447
Issue date: 08/16/1976
From: Gilbert W
GENERAL ELECTRIC CO.
To: Rusche B
Office of Nuclear Reactor Regulation
Shared Package
ML20234A777 List: ... further results
References
FOIA-87-40 183-211-76, MFN-288-76, NUDOCS 8707010322
Download: ML20245B829 (1)


Text

_

)-

j l

NUCLEAR ENERGY SYSTEMS DIVISION GENERAL ELECTRIC COMPANY,175 CURTNER AVENUE, SAN JOSE, CALIFORNIA 95125 Mail Code 685' Phone (408) 297 3000 TWX No. 910-338-0116 BWR PROJECTS DEPARTMENT f

' August 16, 1976 Letter No Spal,4-76 d,ie.3F__

c l-Director of Nuclear Reactor Regulation 2-

)

. ATTN:

Mr. B.C. Rusche, Director C

MCl3 Office of Nuclear Reactor Regulation

% swun.m$ $ % -

I

)

l U.S. Nuclear Regulatory Commission

$"A5p,". e l

Washington, D.C.

20555 i

1 f

l 4

\\

SUBJECT:

In the Matter of General Electric Standard Safety Analysis Report (238 Nuclear i

Island [NI] GESSAR); Docket No. STN 50-447 l

I

Dear Mr."Rusche:

Enclosed please find 3 original copies (transmitted under separate cover i

are 60 conformed copies) of Amendment No. 44 to the 238 General Electric Standard Safety Analysis Report (238 NI GESSAR) for the above numbered 1

application.

Amendment No. 44 provides additional information in a continuing effort to expedite resolution of post-PDA items.

Very truly yours, Y-W.D. Gilbert, Manager Safety and Standards i

/ dew Enclosures (f

pt y.

dNWhd E y he,'

cc:

L.S. Gifford J.D. Thomas MFN 288-76 s

b O

a 30 id0$ 36m0V8 from AGPuS Osfice 8707010322 870610 PDR FOIA THOMASB7-40 PDR

- ___ __ _ _-