OPERATING DATA IEPORT DOCKET NO.
50-341 COMPLETED BY P. M. Anthony DATE April 17, 1989 TELEPHONE (313)586-1617 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 l Notes:
l 2.
REPORTING PERIOD: -March, 1988 I
I 3
LICENSED THERMAL POWER (MWt):
3292 I
- To be determined-l 4.
NAMEPLATE RATING (GROSS MWe):
1154 l
l 5
DESIGN ELECT RATING (Net MWe): 1093 I
.I 6.
MAX DEPENDABLE CAP (GROSS MWe):
l l
7 MAX DEPENDABLE CAP (Net MWE):
l l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
None
- 10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 744 1646 1646
- 12. HRS REACTOR WAS CRITICAL 0
830.7 830.7
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE O
830.3 830 3
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 0 2,066,876 2,066,876
- 17. GROSS ELECT ENERGY GEN (MWH) 0 670,845 670,845
- 18. NET ELECT ENERGY GEN (MWH) 0 640,673 640,673 lI
- 19. UNIT SERVICE FACTOR 0
50.4 50.4
- 20. UNIT AVAILABILITY FACTOR 0
50.4 50.4
- 22. UNIT CAP FACTOR (USING DER NET) 0 35.6 35.6 I
- 23. UNIT FORCED OUTAGE RATE O
1.6 1.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)
Fermi 2 is currently in an LLRT outage which began February 26, 1988. The outage wit. last forty five days.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 04/15/88
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 06/27/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 01/23/88 01/23/88 4250I03 gyo437 ADOCK 0500034I R
PNU
)