OPERATING DATA REPORT DOCKET No.- 50-341 COMPLETED BY. P. M. Anthony DATE April 17, 1989 TELEPHONE (313)586-1617 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 l Notes:
I 2.
REPORTING PERIOD: April, 1988 l
l 3
LICENSED THERMAL POWER (MWt): 3292 l
- To be determined l
4.
NAMEPLATE RATING (GROSS MWe):
1154 l
1
- 5. -DESIGN ELECT RATING (Net MWe): 1093 I
I 6.
MAX DEPENDABLE CAP (GROSS MWe):
l l
7 MAX DEPENDABLE CAP (Net MWE):
l l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
None
- 10. REASONS FOR RESTRICTION, IF ANY:
None THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 719 2365 2365
- 12. HRS REACTOR WAS CRITICAL 0
830.7 830.7
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE O
830.3 830.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 0 2.066.876 2,066,876
- 17. GROSS ELECT ENERGY GEN (MWH) 0 670,845 670,845
- 18. NET ELECT ENERGY GEN (MWH) 0 640,673 640,673 ll
- 19. UNIT SERVICE FACTOR 0
35.1 35.1
- 20. UNIT AVAILABILITY FACTOR 0
35.1 35.1
- 22. UNIT CAP FACTOR (USING DER NET) 0 24.8 24.8 j
- 23. UNIT FORCED OUTAGE RATE O
1.6 1.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)
Fermi 2 was in an LLRT outage which ended May 5, 1988.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 05/05/88
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 01/23/88 01/23/88 8904250106 890417 PDR ADOCK 05000341 R