OPERATING DATA REPORT DOCKET NO.
50-341 COMPLETED BY P. M. Anthony DATE April 17, 1989 TELEPHONE (313)586-1617 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 l Notes:
l 2.
REPORTING PERIOD: June, 1988 I
i 3
LICENSED THERMAL POWER (MWL):
3292 I
- To be determined I
4.
NAMEPLATE RATING (GROSS MWe):
1154 l
l 5.
DESIGN ELECT RATING (Net MWe): 1093 I
I 6.
MAX DEPENDABLE CAP (GROSS MWe):
l l
7 MAX DEPENDABLE CAP (Net MWE):
l l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 5 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
None
- 10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 720 3829 3829
- 12. HRS REACTOR WAS CRITICAL 720 2077.9 2077.9
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 720 1980 3 1980 3
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 1,912,920 4,845,692 4,845,692
- 17. GROSS ELECT ENERGY GEN (MWH) 631,947 1,561,153 1,561,153
- 18. NET ELECT ENERGY GEN (MWH) 601,169 1,485,057 1,485,057 g
- 19. UNIT SERVICE FACTOR 100 51.7 51.7
- 20. UNIT AVAILABILITY FACTOR 100 51.7 51.7
- 22. UNIT CAP F.'.CTOR (USING DER NET) 76.4 35.5 35.5 1
- 23. UNIT FORCED OUTAGE RATE 0
0.7 0.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)
None
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A l
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 8904250111 890417 DR ADOCK 050 1