mua i

i DOCKET NO.

50-341 COMPLETED BY P. M. Anthony DATE April 17, 1989 TELEPHONE (313)586-1617 OPERATING STATUS 1.

UNIT NAME:

Fermi 2 l Notes:

I j

2.

REPORTING PERIOD: May, 1988 l

l l

I 3

LICENSED THERMAL POWER (MWL): 3292 I

  • To be determined I

4.

NAMEPLATE RATING (GROSS MWe):

1154 I

I 5

DESIGN ELECT RATING (Net MWe): 1093 I

I 6.

MAX DEPENDABLE CAP (GROSS MWe):

I I

7 MAX DEPENDABLE CAP (Net MWE):

l I

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

None 9

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):

None

10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUMULATIVE
11. HRS IN REPORTING PERIOD 744 3109 3109
12. HRS REACTOR WAS CRITICAL 527.2 1357.9 1357.9
13. REACTOR RESEF VE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE 430 1260 3 1260 3
15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (MWH) 865,896 2,932,772 2,932,772
17. GROSS ELECT ENERGY GEN (MWH) 258,361 929,206 929,206
18. NET ELECT ENERGY GEN (MWH) 243,215 883,888 883,888

[l

19. UNIT SERVICE FACTOR 57.8 40.5 40.5
20. UNIT AVAILABILITY FACTOR 57.8 40.5 40.5
21. UNIT CAP FACTOR (USING MDC NET)
22. UNIT CAP FACTOR (USING DER NET) 29.9 26.0 26.0 t
23. UNIT FORCED OUTAGE RATE O

1.1 1.1

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

None

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIA' ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A gCK05000343 o9 g90437 R