Text
(.
mua i
i DOCKET NO.
50-341 COMPLETED BY P. M. Anthony DATE April 17, 1989 TELEPHONE (313)586-1617 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 l Notes:
I j
2.
REPORTING PERIOD: May, 1988 l
l l
I 3
LICENSED THERMAL POWER (MWL): 3292 I
- To be determined I
4.
NAMEPLATE RATING (GROSS MWe):
1154 I
I 5
DESIGN ELECT RATING (Net MWe): 1093 I
I 6.
MAX DEPENDABLE CAP (GROSS MWe):
I I
7 MAX DEPENDABLE CAP (Net MWE):
l I
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
None 9
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
None
- 10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 744 3109 3109
- 12. HRS REACTOR WAS CRITICAL 527.2 1357.9 1357.9
- 13. REACTOR RESEF VE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 430 1260 3 1260 3
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 865,896 2,932,772 2,932,772
- 17. GROSS ELECT ENERGY GEN (MWH) 258,361 929,206 929,206
- 18. NET ELECT ENERGY GEN (MWH) 243,215 883,888 883,888
[l
- 19. UNIT SERVICE FACTOR 57.8 40.5 40.5
- 20. UNIT AVAILABILITY FACTOR 57.8 40.5 40.5
- 22. UNIT CAP FACTOR (USING DER NET) 29.9 26.0 26.0 t
- 23. UNIT FORCED OUTAGE RATE O
1.1 1.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)
None
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIA' ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A gCK05000343 o9 g90437 R
PNu
- _ _ _ _ _