MONTHYEARML20212K8811999-10-0404 October 1999 Notification of 991014 Meeting with Util in Rockville,Md to Discuss Improved Std TS Conversion Process for Plant,Units 1 & 2 ML20209G2611999-07-12012 July 1999 Forwards Draft Request for Addl Info Re GL 96-06 Response ML20206H3921999-05-0606 May 1999 Notification of 990518 Meeting with Util in Rockville,Md to Discuss Util Presentation of Technical Evaluation Performed in Support of License Amend Request Which Would Revise TS Limiting Safety Sys Setpoints to Be More Conservative ML20205P6271999-04-14014 April 1999 Notification of 990428 Meeting with Util to Discuss Proposed Asset Transfer Between Duquesne Light Co & First Energy Nuclear Operating Co & Associated License Transfer of Beaver Valley Power Station Per 10CFR50.80 ML20199J0641998-12-30030 December 1998 Notification of 990119 Meeting with Duquesne Light Co in Rockville,Md to Discuss Status of Licensing Actions/ Activities Currently Being Reviewed by NRC & of License Amend Requests Expected to Be Submitted in Near Future ML20198G9941998-12-22022 December 1998 Forwards Request for Addl Info Re Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor Operated Valves Program ML20196H1391998-12-0404 December 1998 Informs That Encl RAI Was Transmitted on 981204 to F Ferri of Dl.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20195G4501998-11-10010 November 1998 Rev 1 to Notification of Significant Licensee Meeting 98-87 with Util on 981116 to Discuss NRC Presentation of Osti Exit Followed by Util Presentation on Unit Restart Plant Performance ML20155K3451998-11-0505 November 1998 Notification of Significant Licensee Meeting 98-87 with Util on 981116 in Beaver Valley Power Station,Emergency Response Facility Conference Room A,For NRC Presentation of Osti Exit & Dl Presentation on Unit Restart Plan Performance ML20154M4501998-10-16016 October 1998 Informs That Encl RAI Was Transmitted by Facsimile on 981002 to F Ferri of Dlc for Use in Telcon on 981009.Memo & Attachment Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154D4481998-10-0505 October 1998 Forwards Exam Rept with as Given Written Exam for Test Administered on 980817-21 at Unit 2,for Processing Through Nudocs & Distribution to NRC Staff ML20154D5611998-10-0505 October 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980817-21 ML20237B8081998-08-17017 August 1998 Forwards NRC Operator Licensing Exam Rept 50-334/98-300OL for Exam Administered on 980420-24 & 0518 ML20236X5981998-08-0404 August 1998 Notification of 980820 Meeting W/Util in Rockville,Md to Discuss Proposed Submittal of Improved Std TS ML20236K9051998-07-0101 July 1998 Notification of Significant Licensee Meeting 98-65 W/Util on 980716 to Discuss Plant Status & Preparations for Plant Restart IA-98-155, Responds to 980513 Request from Duquesne Light Co to Provide Written Interpretation of Beaver Valley Power Station,Unit 1 & 2 TSs Requirements for Channel Calibration of Rtds & Thermocouples1998-06-0505 June 1998 Responds to 980513 Request from Duquesne Light Co to Provide Written Interpretation of Beaver Valley Power Station,Unit 1 & 2 TSs Requirements for Channel Calibration of Rtds & Thermocouples ML20236N6351998-06-0505 June 1998 Responds to 980513 Request from Duquesne Light Co to Provide Written Interpretation of Beaver Valley Power Station,Unit 1 & 2 TSs Requirements for Channel Calibration of Rtds & Thermocouples ML20247D1541998-05-0505 May 1998 Notification of 980519 Meeting W/Duquesne Light Co in Shippingport,Pennsylvania to Discuss NRC SALP of Beaver Valley Power Station for Period of 960929-980321 ML20248L6081998-03-0505 March 1998 Forwards Exam Rept W/As Given Written Exam for Test Administered on 971215-18 at Facility ML20248L6621998-03-0505 March 1998 Forwards Facility Submitted Outline & Initial Exam Submittal & as Given Operating Exam for Test Administered on 971215-18 at Facility ML20212G4791997-10-28028 October 1997 Forwards SER Accepting Licensee 970213 Request Re Pressurized Thermal Shock Assessment for Beaver Valley Unit 2 Reactor Vessel ML20149G3261997-07-18018 July 1997 Notification of 970805 Meeting W/Util in North Bethesda,Md to Discuss Plans & Schedules for Resolution of 10CFR50.61 Updated Info for Pressurized Thermal Shock Evaluation ML20149D2891997-07-14014 July 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970317 IR 05000334/19970031997-07-14014 July 1997 Forwards NRC Approved Operator Licensing Exam Repts 50-334/97-03OL & 50-412/97-03OL (Including Completed & Graded Tests) for Tests Administered on 970317-21 & 970428- 0502 ML20149D2851997-07-14014 July 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970317-21 ML20148E1881997-05-23023 May 1997 Notification of Significant Licensee Meeting 97-60 W/Util on 970623 to Discuss Surveillance Test Program Apparent Violations ML20138Q1171997-02-27027 February 1997 Rev 1 to Notification of Significant Licensee Meeting 97-20 W/Util on 970307 in King of Prussia,Pa to Discuss Plant Configuration Control Issues Related to Component Mispositionings ML20135D1271997-02-20020 February 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970304 to Discuss Plant Configuration Control Issues Re Component Mispositionings ML20133D6221997-01-0202 January 1997 Rev 3 to Notification of Significant Licensee Meeting 96-128 W/Util in King of Prussia,Pa Re Predecisional EC to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20132E7361996-12-17017 December 1996 Notification of Significant Licensee Meeting 96-462 Rev 2 W/Util on 961230 to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20149M4601996-12-0606 December 1996 Notification of Significant Licensee Meeting W/Util on 961219 to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20149M4921996-12-0404 December 1996 Notification of 961219 Significant Licensee Meeting 128 W/Util in King of Prussia,Pa to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps IA-97-166, Forwards SE Re Request to Establish Requirements for Audits of TS Subject to Provisions of App B to 10CFR50.Request Left Unsolved Pending Further NRC Review1996-10-0404 October 1996 Forwards SE Re Request to Establish Requirements for Audits of TS Subject to Provisions of App B to 10CFR50.Request Left Unsolved Pending Further NRC Review ML20141M6491996-10-0404 October 1996 Forwards SE Re Request to Establish Requirements for Audits of TS Subject to Provisions of App B to 10CFR50.Request Left Unsolved Pending Further NRC Review ML20129E7161996-09-30030 September 1996 Forwards Request for Addl Info Re Request to Amend 10CFR50, App H Surveillance Program & Info Provided in WCAP-14484 ML20059K7871994-01-0606 January 1994 Notification of Enforcement Conference 94-06 W/Util on 940118 to Discuss EDGs Solid State ATC Timer/Relays ML20059C3261993-12-28028 December 1993 Discusses Suggestion for More Efficient Use of NRC & Licensee Resources ML20058E4201993-11-26026 November 1993 Notification of Significant Licensee Meeting 93-157 W/Util on 931202 to Discuss AIT Exit Meeting ML20059K5501993-11-0808 November 1993 Notification of Significant Licensee Meeting 93-146 W/Util on 931115 in King of Prussia,Pa to Discuss Training Program Improvement Following Initial Exam Results from May 1993 ML20059K2711993-11-0303 November 1993 Discusses 931027 Operating Reactors Events Briefing Conducted to Inform Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 931020. List of Attendees Encl ML20059H1381993-11-0202 November 1993 Notification of 931110 Meeting W/Util in Rockville,Md to Discuss Dlc Safety Assessment Program & Basis for Schedule Extension for Testing of MOVs ML20059J4471993-11-0202 November 1993 Notification of Cancellation of 931110 Meeting W/Util in Rockville,Md to Discuss Util Safety Assessment Program & Basis for Schedule Extension for Testing of MOVs ML20059G1271993-11-0202 November 1993 Notification of Significant Licensee Meeting 93-139 W/Util on 931119 in King of Prussia,Pa to Discuss Enforcement Conference Re Open Containment Penetration During Refueling ML20056G8161993-08-23023 August 1993 Notification of Significant Licensee Meeting 93-111 W/Util on 930902 to Discuss Plant Operator Training Program ML20202H7351993-07-22022 July 1993 Informs That Investigation Re Potential Wrongdoing Initiated by OI on 930223,under Case 1-93-008 Being Closed.Evaluation of Facts & Circumstances Surrounding Issues Indicate That No Underlying of Regulatory Requirements Exist ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20128D2701992-11-25025 November 1992 Notification of 921210 Meeting W/Dl in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in High Pressure SIS ML20125C9761992-11-25025 November 1992 Notification of Canceled Meeting on 921210 in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in high-pressure Safety Injection Sys 1999-07-12
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20212K8811999-10-0404 October 1999 Notification of 991014 Meeting with Util in Rockville,Md to Discuss Improved Std TS Conversion Process for Plant,Units 1 & 2 ML20212F5401999-09-24024 September 1999 Staff Requirements Memo Re 990924 Affirmation Session Concerning SECY-99-236, Firstenergy Nuclear Operating Co, Local 29 Petition to Waive Time Limits in 10CFR2.1305 & Suppl Comments ML20209G2611999-07-12012 July 1999 Forwards Draft Request for Addl Info Re GL 96-06 Response ML20206H3921999-05-0606 May 1999 Notification of 990518 Meeting with Util in Rockville,Md to Discuss Util Presentation of Technical Evaluation Performed in Support of License Amend Request Which Would Revise TS Limiting Safety Sys Setpoints to Be More Conservative ML20205P6271999-04-14014 April 1999 Notification of 990428 Meeting with Util to Discuss Proposed Asset Transfer Between Duquesne Light Co & First Energy Nuclear Operating Co & Associated License Transfer of Beaver Valley Power Station Per 10CFR50.80 ML20199J0641998-12-30030 December 1998 Notification of 990119 Meeting with Duquesne Light Co in Rockville,Md to Discuss Status of Licensing Actions/ Activities Currently Being Reviewed by NRC & of License Amend Requests Expected to Be Submitted in Near Future ML20198G9941998-12-22022 December 1998 Forwards Request for Addl Info Re Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor Operated Valves Program ML20196H1391998-12-0404 December 1998 Informs That Encl RAI Was Transmitted on 981204 to F Ferri of Dl.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20195G4501998-11-10010 November 1998 Rev 1 to Notification of Significant Licensee Meeting 98-87 with Util on 981116 to Discuss NRC Presentation of Osti Exit Followed by Util Presentation on Unit Restart Plant Performance ML20155K3451998-11-0505 November 1998 Notification of Significant Licensee Meeting 98-87 with Util on 981116 in Beaver Valley Power Station,Emergency Response Facility Conference Room A,For NRC Presentation of Osti Exit & Dl Presentation on Unit Restart Plan Performance ML20154M4501998-10-16016 October 1998 Informs That Encl RAI Was Transmitted by Facsimile on 981002 to F Ferri of Dlc for Use in Telcon on 981009.Memo & Attachment Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154D5611998-10-0505 October 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980817-21 ML20154D4481998-10-0505 October 1998 Forwards Exam Rept with as Given Written Exam for Test Administered on 980817-21 at Unit 2,for Processing Through Nudocs & Distribution to NRC Staff ML20237B8081998-08-17017 August 1998 Forwards NRC Operator Licensing Exam Rept 50-334/98-300OL for Exam Administered on 980420-24 & 0518 ML20236X5981998-08-0404 August 1998 Notification of 980820 Meeting W/Util in Rockville,Md to Discuss Proposed Submittal of Improved Std TS ML20236K9051998-07-0101 July 1998 Notification of Significant Licensee Meeting 98-65 W/Util on 980716 to Discuss Plant Status & Preparations for Plant Restart ML20236N6351998-06-0505 June 1998 Responds to 980513 Request from Duquesne Light Co to Provide Written Interpretation of Beaver Valley Power Station,Unit 1 & 2 TSs Requirements for Channel Calibration of Rtds & Thermocouples IA-98-155, Responds to 980513 Request from Duquesne Light Co to Provide Written Interpretation of Beaver Valley Power Station,Unit 1 & 2 TSs Requirements for Channel Calibration of Rtds & Thermocouples1998-06-0505 June 1998 Responds to 980513 Request from Duquesne Light Co to Provide Written Interpretation of Beaver Valley Power Station,Unit 1 & 2 TSs Requirements for Channel Calibration of Rtds & Thermocouples ML20247D1541998-05-0505 May 1998 Notification of 980519 Meeting W/Duquesne Light Co in Shippingport,Pennsylvania to Discuss NRC SALP of Beaver Valley Power Station for Period of 960929-980321 ML20248L6621998-03-0505 March 1998 Forwards Facility Submitted Outline & Initial Exam Submittal & as Given Operating Exam for Test Administered on 971215-18 at Facility ML20248L6081998-03-0505 March 1998 Forwards Exam Rept W/As Given Written Exam for Test Administered on 971215-18 at Facility ML20212G4791997-10-28028 October 1997 Forwards SER Accepting Licensee 970213 Request Re Pressurized Thermal Shock Assessment for Beaver Valley Unit 2 Reactor Vessel ML20149G3261997-07-18018 July 1997 Notification of 970805 Meeting W/Util in North Bethesda,Md to Discuss Plans & Schedules for Resolution of 10CFR50.61 Updated Info for Pressurized Thermal Shock Evaluation ML20149D2851997-07-14014 July 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970317-21 IR 05000334/19970031997-07-14014 July 1997 Forwards NRC Approved Operator Licensing Exam Repts 50-334/97-03OL & 50-412/97-03OL (Including Completed & Graded Tests) for Tests Administered on 970317-21 & 970428- 0502 ML20149D2891997-07-14014 July 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970317 ML20148E1881997-05-23023 May 1997 Notification of Significant Licensee Meeting 97-60 W/Util on 970623 to Discuss Surveillance Test Program Apparent Violations ML20138Q1171997-02-27027 February 1997 Rev 1 to Notification of Significant Licensee Meeting 97-20 W/Util on 970307 in King of Prussia,Pa to Discuss Plant Configuration Control Issues Related to Component Mispositionings ML20135D1271997-02-20020 February 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970304 to Discuss Plant Configuration Control Issues Re Component Mispositionings ML20133D6221997-01-0202 January 1997 Rev 3 to Notification of Significant Licensee Meeting 96-128 W/Util in King of Prussia,Pa Re Predecisional EC to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20132E7361996-12-17017 December 1996 Notification of Significant Licensee Meeting 96-462 Rev 2 W/Util on 961230 to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20149M4601996-12-0606 December 1996 Notification of Significant Licensee Meeting W/Util on 961219 to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20149M4921996-12-0404 December 1996 Notification of 961219 Significant Licensee Meeting 128 W/Util in King of Prussia,Pa to Discuss Plant Operation W/Two of Three Power Operated Relief Valve Block Valves Shut for Extended Period of Time ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps IA-97-166, Forwards SE Re Request to Establish Requirements for Audits of TS Subject to Provisions of App B to 10CFR50.Request Left Unsolved Pending Further NRC Review1996-10-0404 October 1996 Forwards SE Re Request to Establish Requirements for Audits of TS Subject to Provisions of App B to 10CFR50.Request Left Unsolved Pending Further NRC Review ML20141M6491996-10-0404 October 1996 Forwards SE Re Request to Establish Requirements for Audits of TS Subject to Provisions of App B to 10CFR50.Request Left Unsolved Pending Further NRC Review ML20129E7161996-09-30030 September 1996 Forwards Request for Addl Info Re Request to Amend 10CFR50, App H Surveillance Program & Info Provided in WCAP-14484 ML20059K7871994-01-0606 January 1994 Notification of Enforcement Conference 94-06 W/Util on 940118 to Discuss EDGs Solid State ATC Timer/Relays ML20059C3261993-12-28028 December 1993 Discusses Suggestion for More Efficient Use of NRC & Licensee Resources ML20058E4201993-11-26026 November 1993 Notification of Significant Licensee Meeting 93-157 W/Util on 931202 to Discuss AIT Exit Meeting ML20059K5501993-11-0808 November 1993 Notification of Significant Licensee Meeting 93-146 W/Util on 931115 in King of Prussia,Pa to Discuss Training Program Improvement Following Initial Exam Results from May 1993 ML20059K2711993-11-0303 November 1993 Discusses 931027 Operating Reactors Events Briefing Conducted to Inform Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 931020. List of Attendees Encl ML20059H1381993-11-0202 November 1993 Notification of 931110 Meeting W/Util in Rockville,Md to Discuss Dlc Safety Assessment Program & Basis for Schedule Extension for Testing of MOVs ML20059G1271993-11-0202 November 1993 Notification of Significant Licensee Meeting 93-139 W/Util on 931119 in King of Prussia,Pa to Discuss Enforcement Conference Re Open Containment Penetration During Refueling ML20059J4471993-11-0202 November 1993 Notification of Cancellation of 931110 Meeting W/Util in Rockville,Md to Discuss Util Safety Assessment Program & Basis for Schedule Extension for Testing of MOVs ML20056G8161993-08-23023 August 1993 Notification of Significant Licensee Meeting 93-111 W/Util on 930902 to Discuss Plant Operator Training Program ML20202H7351993-07-22022 July 1993 Informs That Investigation Re Potential Wrongdoing Initiated by OI on 930223,under Case 1-93-008 Being Closed.Evaluation of Facts & Circumstances Surrounding Issues Indicate That No Underlying of Regulatory Requirements Exist ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys ML20128D2701992-11-25025 November 1992 Notification of 921210 Meeting W/Dl in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in High Pressure SIS 1999-09-24
[Table view] |
Text
[ .e %
g k UNITED STATES t! ) NUCLEAR RESULATORY COMMISSION
- WAsHINGfoN, D.C. 300e6 4001
,y, June 5, 1998 MEMORANDUM: Robert A. Capra Project Directorate,12 y
Division of Reactor Projects, NR D /Jr FROM: William D. Beckner, Chief . M Technical Specif' cations Branch Associate Director for Projects, NRR
Subject:
REQUEST FOR NRC INTERPRETATION - TECHNICAL SPECIFICATION CHANNEL CALIBRATION OF RTDS AND THERMOCOUPLE By letter dated May 13,1998, Duquesne Ught Company (licensee) requested that the Office of Nuclear Reactor Regulation provide a written interpretation of Beaver Valley Power Station (BVPS), Unit No.1 and No. 2 technical specifications (TS) requirements. The request is to clarify testing required by the definition of a channel calibration for instrument loops containing I resistance temperature detectors (RTDs) and thermocouple sensors. In response to your request, the staff evaluated the BVPS TS and prepared the following TS interpretation to assist in clarifying BVPS TS testing requirements.
The staff notes that the licensee letter references improved Standard Technical Specifications (STS) of NUREG-1431 as supporting their proposed interpretation of the current Technical Specifications (CTS) definition of a channel calibration. The current BVPS TS channel calibration definition is as follows:
"A CHANNEL CAUBRATION shall be the adjustment, as necessary, of the channel so that it responds within the required range and accuracy to known values of the parameter which the channel monitors. The CHANNEL C.*UBRATION shall encompass the entire channel, including the sensor (emphasis added) and alarm and/or trip functions, and shall include the CHANNEL FUNCTIONAL TEST. The CHANNEL CAUBRATION may be performed by any series of sequential, overlapping or total channel steps such that the entire channelis calibrated."
The licensee position is that it appears that CTS were not int' ended to require a calibration of RTD or thermocouple sensors. Rather, calibration of instrument channels with RTD or thermocouple sensors may consist of an in piece qualitative assessment of sensor behavior and normal calibration of the remaining adjustable devices in the channel. This position is based on language added to the improved STS channel calibration defirwtion noted in boldfaced type below concoming the complete definition.
"A CHANNEL CAUBRATION shall be the adjustment, as necessary, of the channel so that it responds within the required range and accuracy to known input. The CHANNEL CAUBRATION shall encompass the entire channel, including the required sensor, alarm,
Contact:
Carl Schulten (301) 415-1192 E-mail: CSSi@NRC. GOV 9007150200 900624 PDR FOIA UNNER3T98-155 PDR
s'
, R. A. Capra 2 June 5, 1998 interlock, display, and trip functions. Calibration of instrument channels with resistance temperature detector (RTD) or thw mocouple sensors may consist of an in place qualitative assessment of sensor behavior and normal calibration of the remaining a(justable devices in the channel. Whenever a sensing element is replaced, the next required CHANNEL CALIBRATION shall include an in-place cross calibration that compares the other sensing elements with the recently installed sensing element. The CHANNEL CALIBRATION may be performed by means of any series of sequential, overlapping calibrations or total channel steps so that the entire channel is calibrated."
Further, based on a favorable reply, the licensee intends to apply the improved STS interpretation to BVPS technical specifications that address RTDs and thermocouple.
Differences between TS requirements for channel calibrations based on CTS definitions and testing based on improved STS definitions are acknowledged to exist. However, when a surveillance test is done to comply with the current license then testing requirements are explicitly defined by CTS, including any related TS defined terms. Therefore, the staff interpretation of BVPS channel calibration TS is that TS require testing to include RTD or thermocouple sensors in the instrument channel and failure to test all components results in failure to comply with TS.
The staff cautions licensees that conversion of plant-specific TS to adopt improved STS both involves the addition of test requirements and TS limits and the relaxation of tests and the elimination of limits not required to meet the provisions of 10 CFR 50.36(c)(2)(ii). As can be seen from the improved STS definition for a channel calibration, a relaxation of sensor calib. ration is allowed unless RTD or thermocouple sensors are replaced. For these operations, in-place qualitative assessment of sensor behavior is not sufficient and the improved STS definition requires in-place cross calibration that compares the other sensing elements with the recently installed element. This element of the definition was omitted from the licensee discussion of improved STS requirements. NUREG-0800, Rev. 4, June igg 7, Branch Technical Position HICB-13,
- Guidance on Cross-Calibration of Protection system Resistance Temperature Detectors", provides detailed guidance on RTD cross calibration procedures. Further, adoption of improved STS surveillance requirements (SR) for RTDs and thermoccupies includes additional testing requirements specif.ed in the SR notes such as verifying rate lag compensation for flow l from the core to the RTDs.
The staff reminds licensees that the Commission continues to place the highest priority on requests for complete conversions to the improved STS. Licensees using license amendments to adopt portions of the improved STS to existing technical specifications should adopt all related requirements, as applicable, to achieve a high degree of standardization and consistency.
DISTRIBUTION FILE CENTER s Tss R/F ,
JWRoe NWDsecimer j JsWwmW Csschubun JMouck DOCUMENT NAME: GTSSteever-vwpd "see presus concurrences OFFICE TSB/ADPR/NRR C:DRCH/HICBlNRR C:TSB/ADPR/NRR NAME CSSchulten* JSWermsel' WDBockner 906 DATE 5/28/98 6103198 6/ ///98 OFFICIAL RECORD COPY I f$/77l
,, R. A. Capra 2 June 5, 1998 interlock, display, and trip functions. Calibration of instrument channels with resistance temperature detector (RTD) or thermocouple sensors may consist of an in-place qualitative assessment of sensor behavior and normal calibration of the remaining adjustable devices in the channel. Whenevar a sensing element is replaced, the next required CHANNEL CALIBRATION shall include an in-place cross calibration that compares the other sensing elements with the recently installed sensing element. The CHANNEL CALIBRATION may be performed by means of any series of sequential, overlapping calibrations or total channel steps so that the entire channel is calibrated."
Further, based on a favorable reply, the licensee intends to apply the improved STS interpretation to BVPS technical specifications that address RTDs and thermocouple.
l Differences between TS requirements for channel calibrations based on CTS definitions and testing based on improved STS definitions are acknowledged to exist. However, when a i surveillance test is done to comply with the current license then testing requirements are I
explicitly defined by CTS, including any related TS defined terms. Therefore, the staff interpretation of BVPS channel calibration TS is that TS require testing to include RTD or thermocouple sensors in the instrument channel and failure to test all components results in failure to comply with TS.
The staff cautions licensees that conversion of plant-specific TS to adopt improved STS both
! involves the addition of test requirements and TS limits and the relaxation of tests and the elimination of limits not required to meet tha provisions of 10 CFR 50.36(c)(2)(ii). As can be seen from the improved STS definition for a chaonel calibration, a relaxation of sensor calibration is allowed unless RTD or thermocouple sensors are replaced. For these operations, in-place qualitative assessment of sensor behavior is not sufficient and the improved STS definition requires in-place cross calibration that compares the other sensing elements with the recently i installed element. This element of the definition was omitted from the licensee discussion of l improved STS requirements. NUREG-0800, Rev. 4, June 1gg7, Branch Technical Position HICB-13, " Guidance on Cross-Calibration of Protection system Resistance Temperature Detectors", provides detailed guidance on RTD cross calibration procedures. Further, adoption of improved STS surveillance requirements (SR) for RTDs and thermocouple includes additional i testing requirements specified in the SR notes such as verifying rate lag compensation for flow
,l from the core to the RTDs.
The staff reminds licensees that the Commission continues to place the highest priority on requests for complete conversions to the improved STS. Licensees using license amendments to adopt portions of the improved STS to existing technical specifications should adopt all related requirements, as applicable, to achieve a high degree of standardization and consistency.
l