Forwards Tentative Schedule for Zimmer Nuclear Power Station Subcommittee 781116-17 Meetings/Site Visit in Cincinnati,Oh & Ser.W/O SER
ML20235C166
Person / Time
Site: 05000000, Zimmer
Issue date: 11/06/1978
From: Duraiswamy S
Advisory Committee on Reactor Safeguards
To: Bender M, Etherington H, Plesset M
NRC
Shared Package
ML20234A777 List: ... further results
References
FOIA-87-40 NUDOCS 8707090323
Download: ML20235C166 (4)


Text

_

2 m.t o v' J.l,penicuq

{

(

,(

jo UNITED STATES

'g g

NUCLEAR REGULATORY COMMISSION in

-l ADVISORY COMMITTEE ON REACTOR SAFEGUARDS g

WASHINGTON, D. C. 20555 November 6,1978 M. Bender M. Plesset H. Etherington I. Catton

2. Zudans W. Lipinski S. Ditto TENTATIVE PRESENTATION SCHEDULE FOR THE WM. H. ZIMMER NUCLEAR POWER STATION SITE TOUR AND SUBCOMMITTEE MEETING - NOVEMBER 16-17, 1978 - CINCINNATI, OH Attached is a copy of the Tentative Presentation Schedule for the Subject meeting. Also attached are copies of the maps of the Cincinnati area, and the NRC Staff's Safety Evaluation Report (SER) for the Wm. H. Zimmer Nuclear Power Station.

Please note that the attached SER is a draft copy and is meant for internal office use only.

Guaranteed reservations have been made at the Holiday Inn.*8050 Highway 42, l

Florence, Kentucky (Telephone: 606-371-2700), for the night (s) of

)

November 15 and/or November 16, 1978 as shown below:

M. Bender November 16, 1978 l

H. Etherington November 16, 1978 M. Plesset November 15-16, 1978 I. Catton November 15-16, 1978 Z. Zudans November 16, 1978 W. Lipinski November 16, 1978 S. Ditto November 16, 1978 Since the NRC Travel Service Branch is strictly enforcing the new travel procedures, please make all the travel arrangements through that Branch as indicated in the recent memo sent to you by M. Gaske on " Arrangements for Travel on ACRS Business".

, ! >[& l ) 17)

(

j.

' ' J </ 3

/

9707090323 870610 PDR FOIA

/17&//tW THOMAS 87-30 PDR

1 3

l

.3 8

i

,I g

3 2

November 6, 1978 9.1.'O p

1

.a Transportation to the Zimer site will be provided by R. Savio and i

7

$. Duraiswamy.

~

f If you have any questions or comments concerning the schedule, agenda, or hotel reservations, please call me at 202-634-3267.

1 Sam Duraiswamy i

Site Analyst Attachments:

1.

Tentative Presentation Schedule for the Wm. H. Zimer Nuclear Power Station Site Tour and l

Subcommittee Meeting 2.

Maps of the Cincinnati area 3.

Draft Copy of the NRC Staff's Safety Evaluation Report for the Wm. H. Zimer Nuclear i

Power Station cc:

T. G. McCreless R. Savio

)

File:

Zimmer i

74,l(%

~,a; y...h..n T' *:

$$c$Y:I.

1

  • p ;ia c.3..

r.y

W 4.

ACRS

omer, SD:mds sua..,

____] 1/ 6/78 o*u

'. ro,. Arone %..sn acu o24o eco c..

i.....

44.

v.

TENTATIVE PRESENTATION SCHEDULE ZIMMER SUBCOMMITTEE MEETING AND SITE TOUR CINCINNATI, OH NOVEMBER 16-17, 1978 NOVEMBER 16, 1978 Lunch and Tour Briefing at the Zimmer Site 12:30 p - 1:00 p Site Tour 1:00 p - 3:00 p Return to Holiday Inn 3:00 p - 4:00 p NOVEMBER 17, 1978 I.

Executive Session (ACRS - OPEN) 8:30 a - 8:45 a II.

Introduction and Summary of Issues (NRC Staff) 8:45 a - 9:00 a III.

Presentation by Applicant a)

Introduction, Organizational and Operational Plans for the Facility 9:00 a - 9:10 a organization Applicant's schedule for completion of construction b)

Plant Description with Emphasis on 9:10 a - 9:30 a Mark II Containment Features brief description, location, and layout of the Zimmer plant c) Training Programs, Emergency Planning, and Quality Assurance and Control Programs 9:30 a - 9:50 a d)

Industrial Security Discussions (OPEN) 9:50 a - 10:00 a e) Quality Assurance / Quality Control Experience for the Zimmer plant 10:00 a - 10:15 a IV. Discussion of Outstanding Issues and NRC Staff Conclusion (Excluding Mark II Containment in Item VI)

(NRC Staff) 10:15 a - 11:00 a V.

Applicant Response to Item IV 11:00 a - 11:45 a 1

  • c,.y

-2 VI. ' Status of Mark II Containment Issues 11:45 a - 12:30 p (Applicant and NRC Staff)

LUNCH 12:30 p - 1:30 p VII. Status of Actions on ACRS Generic Items.

1:30 p - 2:00 p These discussions should address stress corrosion cracking, ATWS, loss of on-site and off-site alternating current / reliability of direct current power systems, instruments to follow the course of'the accident, recir-culation pump overspeed during a LOCA, loose parts monitoring, and ' vibration monitoring.

(Applicant' and-NRC Staff).

J VIII.

Executive Session (ACRS - OPEN) 2:00 p - 2:15 p-i

-IX.

Presentation by Members of the Public as 2:15 p - close of requested-(Interested Members are Requested business

.to Contact S. Duraiswamy or R. Savio at 202-634-3267) y

.)-