ML20234F545
Text
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _
Q ^ 'fl4 s37 I
l i
- y November 28, 1973
@?
if
~
I ACKS Members 1
GRAND GULF NUCLEAR STATION SITE VISIT AND SUBC000iITTEE MEETING, l
i DECEMBER 21 AND 22, 1973 The Grand Gulf Subconunittee will visit the site of the proposed j
plant and hold a Subcomunittee meeting in Jackson, Mississippi on j
December 21 and 22, 1973. The primary topics to be considered at i
this meeting are; the seismic design criteria, analyses of the structures to withstand seismic loadings, dynamic behavior of s
the suppression pool and its effects on adjacent structures, and combustibia gas control in the containment.
{
The following consultants are specifically invited to participate and others may, if they feel they can make a significant contribution j
in the above areas.
l Dr. Page Dr. Wilson Dr. Theofanous Dr. Zaloudek Dr. Thompson Dr. Eudans A schedule and agenda including hotel arrangements will be prepared and distributed later.
,"y T
M 1 J. C. McKinley Senior Staff Assistant ec:
H. D. Curet D. R. Evans B. M. Page S. S. Philbrick R. W. Shumway C. W. Solbrig T. G. Theofanous G. A. Thompson Filed: Grand Gulf f{- Q,'
J. T. Wilson g s2p 7 F. Zaloudek t;. x,
E. Zudans 4M 8707080252 870610 N~ M PDR FDIA
'i THOMAse7-40 ppg ACRS omcE >
........ g g.
SURNAME >
,a oArt >
Form AEC-518 (Rev. 9 53) AECM 0240 eae
.43-se-aivas-1 44s-e s a