UNITED STATES ti-ATOMIC ENERGY COMMISSION
'I ' d*)
l WASHINGTON, D.C. 20545 C
id CEO,qc July 11, 1972
? JU' 12 F:. 12 0l Docket No. 50-254 UjICUMNITiENN
'2 S AFC GL'ARDS 1
Dr. Chester P. Siess Chairman, Advisory Comittee on Reactor Safeguards D. S. Atomic Energy Comission Washington, D. C.
20545
Dear Dr. Siess:
Sixteen (16) copies of the following are transmitted for the Comittee's information:
Letter to Commonwealth Edison Company dated July 10,
~1972, requesting additional information regarding the vibration program at Quad-Cities Unit 1.
1 i
Sincerely, l
Donald J. Skovholt Assistant Director for Operating Reactors Directorate of Licensing
Enclosures:
As stated above 8707080062 870610 h717Y (M b2 8
PDR FOIA THOMASB7-40 PDR bbb m s a d u b u us @ Q
\\ RfD ' Yi ~ " C Dr@qF w
g}h w..-
0FFICIAL USE ONLY SUFFLEMENT No. 156 CATEGORY B tc ; e. : ?
"' Cities Unit 1 August 4,1972
- g BE Turbine Buildinn Flooding Commonwealth Edison Company letter dated June 17, 1972 eenfirus' and elaborates on the turbine building flooding incident that was reported by TWK dated June 10,1972 (see supplement No.154, page 68) and described by the Regulatory Staf f at the July ACRS meeting.
Cassoonwealth Edison plans to install a water tight bulkhead door to the condenser hotwell area and to extend the ventilation systen to preclude flooding. Other actions are planned and a final report will be submitted within 30 days.
No ACKS action is recoenended.
The enclosed material may be discarded after your review.
(JCM)
HMH Vibration Testing ACRS C-:
-- walth Edison Company letter dated June 20, 1972 reports the status of the vibration monitoring progren, the failure of a number of sensors, and presents a justification for continuing the program with the remaining sensors.
No ACRS action is recommended.
The enclosed material may be discarded after your review.
(JCM)
HMH Turbine Building Floodina j
ACRS Resu1 story Staff internal memo dated July 3.1972 is an evaluation of the of facts of the Condensate Pump Room flooding incident. It identifies the major pieces of equipment that became inoperable as a sesult of the flooding and evaluates the consequences of the non availability of that equipment.
No ACRS action is recommended.
7 The snelosed material should be retained as part of the permanent
{
record.
1 ACRS omet>
JcM:bjw 0FFICIAL USE ONLY su=wr >
.. g.
mart >
Form ATC-Ste (Rev. 9.$3) AECM 0240 e.o
.43-se-siens-s 44s-e7s
- i 0FFICIAL USE ONLY SUFFLEMENT NO. 156 CATEGORY B 6? ;
Quad Cities Unit 1 continued August 4, 1972 a
- $l"* >
BE Yalve Malfunction
? TJ
~
Commonwealth Edison C=nany TWX dated July 3.1972 reports the.~
malfunction of the final injection valve of the SCIC System (failed to open). Cause is not stated.
No ACRS action is recommended.
The enclosed material may be discarded after your review.
(JCM)
HMH Turbine Building Flooding Incident. Interim Report ACRS Commonwealth Edison C===ay letter dated July 10. 1972 transmits an interim report on the Turbine Building basement flooding i
incident and to describe some of the modifications to be made to the condensate pump room as a result of that incident. A final report is expected at the end of July.
The following corrective actions have been taken:
1.
The door to the condenser hotws11 area has been sealed and made water tight, 2.
Two 4' x 4' ventilation openings that connect,the area under i
the condenser with the condensate pump room have been sealed l
off with steel plate.
I 3.
A level alarm has been installed under the condenser that annunciated in the control room.
I The following are the final cotractive measures planned to pre-i clude circulating water from entering the condensate pump roomst i
1.
Replace the existing sealed door with a water tight bulkhead l
door. This door will be designed to withstand combined seismic and water loads. The delivery schedule for this door is four to six months. The present seal will be maintained until this door is available.
I 2.
The presently installed ventilation opening serls will be maintained as a permanent design.
- f.,
3.
A system of level switches will be installed under the condesser L
to indicate and control flooding of the condenser area.
omer >
OFFICIAL USE ONLY
$URNWE >
ont>
Form AEC-318 (Rev. 9-53) AECM 0240
.po
.43-to-sieca-44 s-ers
.l 0FFICIAL USE 01ELY SUPPLEMENT No. 156 CATE00tY B emad Cities Unit 1 contin ed Amyset 4,19722hlAV-b
%[g%'
Temporary, alternate sources of RH1 service unter and diesel fi'r eeoling water are being provided.
f',' -
(..
No ACRS action is recommended.
The enclosed material may be discarded af ter your review.
Ocho HMH Vibration Test Pronrasi ACPS AEC letter dated July 10. 1972 requests additional information regarding continuation of the vibration test program with a a m ber of inoperable sensors.
No ACRS action is recomunended.
The enclosed material may be discarded after your review.
OCN) l i
1 l
l
}
r.b, OfTICE >
OFFIC1 SURNAME >
AL USE.CIILY.
DATE >