ML20234E042

From kanterella
Jump to navigation Jump to search
Forwards Util Re Outstanding Tech Spec Items for Plant & Re Condensate Pump Room Flooding,For Info.W/O Encls
ML20234E042
Person / Time
Site: 05000000, Quad Cities
Issue date: 09/13/1972
From: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
To: Seiss C
Advisory Committee on Reactor Safeguards
Shared Package
ML20234A777 List: ... further results
References
FOIA-87-40 NUDOCS 8707070431
Download: ML20234E042 (2)


Text

7,.

  1. " #8*e,,

UNITED STATES I-ATOMIC ENERGY COMMISSION

{

' WASHINGTON. D.C. 20545

%,n e September 13, 1972 Docket Nos. 50-254 6'50-265 Dr. Chester P. Siess Chairman, Advisory Committee on Reactor Safeguards U. S. Atomic Energ Commission Washington, D. C..20545

Dear Dr. Siess:

Sixteen (16) copies of the following are transmitted for the Connittee 's '

information:

Letter from Commonwealth Edison Company dated August 31, 1972, regarding outstanding. Technical Specifications items for Quad-Cities Units 1 and 2.

1 Letter from Commonwealth Edison Company dated September 1, 1972, transmitting answers to our questions regarding condensate pump room flooding,,,,--

at Quad-Cities Units 1 and 2.

.,{

b cW>'

W EEE

. "g.

D m

p

$' E

T h~

E 1

c -

)

$E$

l Sincerely, 52 O

dov//j,-fd,/O

~

Donald J. Skovholt Assistant Director for Peactor Operations Division of Reactor Licens$ng

Enclosures:

As stated i, ' (;

~.

r

- - 3). ) % h) j, y~y y'p f

w ga.,u.

8707070431 B70610.

PDR FOIA THOMAS 87-40 PDR

OFFICIAL USE ONLY SUFFLEMENT No. 157 CATECORY B DM A- ' Cities Units 1 and 2 September 18,196tp : 3,: '

N,b BE Technical Specification Channes for Full Power Operation

[.

b ACKS Commonwealth Edison Company letter dated Auaust 31. 1972 identifies Technical Specification changes that should be made prior to operation at 100% of rated power. Specific proposals will be made later.

No ACRS action is recommended.

The enclosed material may be discarded af ter your review.

(JCM)

IDTH Turbine Building Flooding ACRS Commonwealth Edison Company letter dated September 1. 1972 submits answers to AEC questions and additional information on the protection being provided against repetition of the turbine basement flooding incident. These provisions include 1.

Alare. and trip level switches at 1, 3 and 5 ft levels in the condenser rooms f

2.

Watertight vaults around vital equipment I

3.

Backup diesel powered portable pumps 4.

Testing of interim corrective actions No ACRS action is recommended.

The enclosed material may be discarded af ter your review.

l (JCM) omen >

.... ACRS..

SURNAME >

..JCli: bj w..

... --- OFF [CIAirUSE ONL'f --

9/28/72 om>

Form AIC-Hs (Rev. 9-53) AECM O240 8'o eaa-to-aiens-

.4s-s s

_