ML20234D877

From kanterella
Jump to navigation Jump to search
Forwards Util Transmitting Amend 5 to Application of License.Excerpts of 157th ACRS Meeting on 730519 Re Vibration & Noise at Unit 1 Encl.W/O Ltr
ML20234D877
Person / Time
Site: 05000000, Quad Cities
Issue date: 11/16/1967
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To: Palladino N
Advisory Committee on Reactor Safeguards
Shared Package
ML20234A777 List: ... further results
References
FOIA-87-40 NUDOCS 8707070370
Download: ML20234D877 (2)


Text

,_ _ _

i i

i b,

?

j 1

l.

^.

  • s UNITED STATES D. <-

ATOMIC ENERGY COMMISSION i

'l Ilf [

W ASHINGTON, D.C. 20545 1

i November 16, 1967 Docket Nos. 50-254 and 50-265 l

V M

Mr. Nunzio Palladino Chairman, Advisory Committee on Reactor Safeguards U. S. Atomic Energy Commission Washington, D. C.

Dear Mr. Palladino:

Transmitted for the information of the Committee are i

i three

' cop es of the following:

COMMONWEALTH EDISON COMPANY (Quad-Cities Station, Units 1 and 2)

Commonwealth Edison Company letter dated November 10, 1967, transmitting Amendment No. 5 to Application for Licenses for its proposed Quad-Ciries Station Units 1 and 2.

i Sincerely yours,

~l d4 Peter A. Morris, Director Division of Reactor Licensing

Enclosures:

As stated above

?. , J, f

C. Q -1 y

P' a'ayA.y "B" h!l!

-q n

e n

W Aa 3i.

5pg q

[..

DOL b

8707070370 870610 PDR FOIA THOMAS 87-40 PDR

L,.

idFFKCHA::a.U.SE OMLY

'G i

t.-

1

'I '

ET.CEi'. PTS F?.0M SRX'd'Y OF i

/

157th ACRS Meeting May 10 - 11, 1973

{

V.

Meeting with Regulatory Staff (Executive Session) i A.

Evaluation of Category B Reports 1.' 'gund Cities l' Vibration and Noise J. B. Henderson, Regulatory Operations, stated that at 95% full

(

power, noise was heard in the torus room, vibration was observed in the low pressure coolant injection line, noise was heard from

{

the drywell in that area, and the recirculation loop discharge i

line was vibrating.

When reactor power was reduced, the noise and vibrations stopped.

The next day, again at 95% power, the noise and vibrations recurred.

The reactor was shut down, and a vibrometer was installed, but the phenomenon did not repeat.

It has been decided to leave the vibrometer on and continue operating with vibration monitoring.

s6 i.

a t

t a

f 4

t-l' I'.

.t

}

t" g<a g

14 t

n

/"

.s

.y I ;

g e

%a y

q g

e,,,

y

  • s.

ka.n.,....,,v x.!u [.a 9..e w'.s.u n I

[

04 p

-... -