Text
.. _ -
UhitTED " STATES b
'e,,
ATOMIC ENERGY COMMISSION l i l
WASHINGTON, D.C. 20545 January 15, 1973 Docket Nos. 50-254 and 50-265 R E C El V E D
%L
.u. sllfyjilyoj; MN15193 Dr. Chester P. Siess i
Chaiman, Advisory Committee f9
' # 8, P,10 JJ,1z y ' 9 n 4 6 6 on Reactor Safeguards eta U. S. Atomic Energy Commission 18J 4,
' Washington, D. C.
20545 l
Dear Dr. Siess:
Sixteen (16) copies of the following are transmitted for the Cor:mittee's information:
I Letter to. Commonwealth Edison Company dated December 22, i
1972, regarding the deletion of certain tests of the 100%
power test program which were required in the FSAR and amendments thereto.
i !
l Ltr to CECO dated January 3,1973, regarding testing at Quad-Cities Units 1 and 2 at the 100% power level.
i-l 1
1 i
Sincerely, i
h/p
,/
f)
Donald J. Skovholt l
Assistant Director for Rtactor Operations i
Division of Reactor Licensing
Enclosures:
As stated
" fi i
(
(1 P n'
(.5 bh3
[d (d d U k.-
g+
['
2
~,
1 E
Q,.. !
- 'fl p
11 W
(
Lm a 8707070065 870610 PDR FOIA PDR THOMASB7-40 l
+
\\9f OFFICIAL USE ONLY SUPPLEMENT NO, 161 CATEGORY B g.-
l Quad Cities Units' I and 2 January 31, 1973 T; T hy i
. hlkrf f.'
HMH Stack Monitoring System i
W' k$-$ k,
]
ACKS Commonwealth Edison Company TWX dated December 8. 1972 reports %'
7 that the stack (chimney) gas monitoring system was inoperable due to apparent freezing of the sample line between the stack and the pump.
Commonwealth Edison Company letter dated December 8.1972 requests a temporary exemption from the requirement that the stack (chimney) monitor.be operable at all times. The licensee is making a maximum e' fort to unplug the sample line. Additional surveillance samples will be taken in the meantime.
Commonwealth Edison Company letter dated December 18. lo72 reports further on the incident. An ice plug formed in the 1" line where it left the chimney. The line was opened and the ice was chipped away then the line was blown clear with compressed air. A filter paper was lost in the line and is believed to have been blown through but this is being checked by comparing particulate activity levels before and after this incident.
Coaunonwealth Edison Company TWX dated December 22. 1972 reports that the chimney monitoring system was out of service for about an hour due to a valve operation error.
Commonwealth Edison Compeny letter dated January i
further on this incident._
11, 1973 reports All personnel who operate the sample system are to notify the control room prior to interrupting any process sample line and again when the system is returned to normal.
No ACRS action is recommended.
The enclosed material may be discarded efter your review.
(JCM)
I HMH Deletion of Certain Full Power Tests ACRS Conrnonwealth Edison Company letter dated December 11. 1972 requests permission to omit certain full power trips at Unit I while still performing the complete series at Unit 2.
The justification for the request is that tests have been made successfully on both units at partial power and these combined with successful testing of 3 Unit 2 will allow an adequate evaluation of Unit 1.
[3 AEC/L letter dated December 22. 1972 denies the above request and' requires that the planned full power testing be carried out.
omcE >......AEC /L le t t ar dated.f armary 3. 1071 clarified.the, prior,,,AEC/L l e t t e r.,,,,,,
ACRS SURN AME >
..Y.C.Uj.h.).Y....
~,.....................
1/31/7 OFFIC;AL USE ONLY DATE >
Form AEC-Sir (Rev. 9 53) ALCM 0240
- o name-saas-s e+eis i
'.4 o'
OFFICIAL USE ONLY SUPPLLMENT NO. 161 CATEGORY B Quad Cities Units 1 and 2 Continued January 31, 1973,q,,,
l No ACRS action is recommended.
The enclosed material should be retained as part of the perm 2 I
record.
4-d
(JCM) 1 HMH Technical Specifications ACRS AEC letter to Recipients dated December 21. 1972 forwards two corrected pages to the Technical Specifications.
l No ACRS action is recommended.
The enclosed material should be incorporated into your copy of the Technical Specifications.
(JCM)
'l o
ks '
N' s
{l, '.
.r di
'A ig" O m CE >
OFFTCIAL USE ONLY SURNAME >
DATE >
Form AEC-918 (Rev. 9 53) AECM 0240 eso eaa-to-stenH e4H7s