August 20, 2020
Mr. G. T. Powell
President and CEO
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, TX 77483
SUBJECT:
RESPONSE TO NRC INSPECTION REPORT 05000498/2020090;
05000499/2020090, APPARENT VIOLATION
Dear Mr. Powell:
On July 6, 2020, the U.S. Nuclear Regulatory Commission (NRC) issued an apparent violation
to STP Nuclear Operating Company for the failure to maintain a quality record complete and
accurate in all material respects.
The NRC Inspection Report 05000498/2020090; 05000499/2020090 (NRC Agencywide
Documents Access and Management System (ADAMS) Accession No. ML20188A214)
informed you that before the NRC makes its enforcement decision, we are providing you an
opportunity to (1) respond in writing to the apparent violation addressed in this inspection report
within 30 days of the date of this letter, (2) request a predecisional enforcement conference
(PEC), or (3) request alternative dispute resolution (ADR). In a letter, dated August 5, 2020,
you provided your response to the apparent violation (ADAMS Accession No. ML20218A448).
We have reviewed the information provided in your response with respect to your completed
and proposed actions.
On August 6, 2020, the NRC held a closed PEC with a former contract employee of STP
Nuclear Operating Company (ADAMS Accession No. ML20209A612). During this conference,
new information was presented to the NRC that is germane to our determination of the
significance of the apparent violation in Inspection Report 05000498/2020090;
The NRC will evaluate this new information and inform you in separate correspondence of our
final determination of the significance of the apparent violation.
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Agency
Rules of Practice and Procedures, a copy of this letter will be made available electronically for
G. Powell
2
public inspection in the NRC Public Document Room or from the NRCs ADAMS, accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
Jeffrey Josey, Chief,
Reactor Project Branch A
Division of Reactor Projects
Docket Nos. 05000498 and 05000499
License Nos. NPF-76 and NPF-80
cc w/ encl: Distribution via LISTSERV
Digitally signed by Jeffrey
Josey
Date: 2020.08.20 11:21:40
-05'00'
Review
Non-Sensitive
¨
Sensitive
Publicly Available
Non-Publicly Available
OFFICE
TL:ACES
BC:DRP/A
NAME
JGroom
JJosey
DATE
8/20/2020
8/20/2020