U-600956, Final Status of Repair & Anticipated Schedule for Restoration of Remaining Out of Svc Annunciators.One Annunciator Listed in Groups 1 & 2 of Util Remain to Be Repaired
ML20215G007 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 06/11/1987 |
From: | Spangenberg F ILLINOIS POWER CO. |
To: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
References | |
U-600956, NUDOCS 8706230088 | |
Download: ML20215G007 (2) | |
Similar Documents at Clinton | |
---|---|
Category:INCOMING CORRESPONDENCE
MONTHYEARU-603280, Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p)1999-10-12012 October 1999
[Table view]Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p) ML20217C0871999-10-11011 October 1999 Forwards Proprietary Attachment Inadvertently Omitted from Encl 2 to Submitting Responses to NRC RAI Re License Transfer Application for Plant.Proprietary Encl Withheld U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included1999-10-0808 October 1999 Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included U-603279, Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld1999-10-0707 October 1999 Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld U-603275, Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station1999-10-0707 October 1999 Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station U-603272, Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl1999-09-22022 September 1999 Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl U-603225, Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl1999-09-20020 September 1999 Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl ML20212G6981999-09-20020 September 1999 Requests That NRC Reject Proposed License Transfer for Clinton Power Station & That NRC State That Public Interest in Safe Nuclear Power Industry Will Not Be Subordinated to Interest in Maximizing Profit by Limiting Liability 05000461/LER-1996-010, Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events1999-09-13013 September 1999 Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events U-603269, Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed1999-09-10010 September 1999 Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed 05000461/LER-1999-011, Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments1999-09-10010 September 1999 Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments U-603229, Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl1999-08-25025 August 1999 Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl U-603243, Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.71999-08-23023 August 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.7 U-603258, Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage1999-08-23023 August 1999 Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage ML20211B0871999-08-20020 August 1999 Responds to J Hopkins Inquiry Re Application for Order Consenting to License Transfer & Approving Conforming Administrative License Amend Filed by Ilpr & Amergen Energy Co on 990723 U-603259, Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired1999-08-19019 August 1999 Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired U-603253, Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 9908131999-08-16016 August 1999 Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 990813 U-603250, Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 9907291999-08-10010 August 1999 Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 990729 U-603249, Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 9908091999-08-10010 August 1999 Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 990809 ML20210N2961999-08-0909 August 1999 Forwards Form of Nuclear Decommissioning Master Trust Agreement,Per CPS Application for License Transfer & Conforming Administrative License Amend U-603248, Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR551999-08-0606 August 1999 Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR55 U-603236, Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS1999-08-0202 August 1999 Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS ML20210J0541999-07-30030 July 1999 Forwards Three Original Signature Pages of Gr Rainey for Application for License Transfer & Conforming Administrative License Amend, for NRC Files U-603178, Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS1999-07-29029 July 1999 Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS U-603237, Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 0001311999-07-28028 July 1999 Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 000131 U-603240, Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.711999-07-27027 July 1999 Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.71 U-603235, Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.7901999-07-23023 July 1999 Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.790 U-603231, Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date1999-07-0707 July 1999 Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date U-603214, Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events1999-07-0606 July 1999 Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events U-603218, Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant1999-06-28028 June 1999 Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant U-603212, Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys1999-06-24024 June 1999 Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys U-603227, Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology1999-06-24024 June 1999 Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology 05000461/LER-1999-007, Forwards LER 99-007-00,re Design Error Causing Main Steam Isolation Valve Leakage Control Sys to Be Outside Design Basis.Commitment Made by Util,Listed1999-06-12012 June 1999 Forwards LER 99-007-00,re Design Error Causing Main Steam Isolation Valve Leakage Control Sys to Be Outside Design Basis.Commitment Made by Util,Listed 05000461/LER-1999-008, Forwards LER 99-008-00,re Failure of Motor Driven Reactor FW Pump Regulating Valve.Commitment Made by Util,Listed1999-06-12012 June 1999 Forwards LER 99-008-00,re Failure of Motor Driven Reactor FW Pump Regulating Valve.Commitment Made by Util,Listed U-603213, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-461/99-01.Corrective Actions:Calculation 19-AK-05, Calculation for DG Load Monitoring, Was Revised Using Correct Horsepower for Hydrogen Mixing Compressors1999-05-28028 May 1999 Responds to NRC Ltr Re Violations Noted in Insp Rept 50-461/99-01.Corrective Actions:Calculation 19-AK-05, Calculation for DG Load Monitoring, Was Revised Using Correct Horsepower for Hydrogen Mixing Compressors ML20209G7731999-05-27027 May 1999 Forwards Copy of Final Rept for 981118,Biennial Radiological Emergency Preparedness Exercise for Clinton Nuclear Power Station.No Deficiencies Were Noted U-603207, Provides Util Rept Confirming Completion of Actions Required by NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs1999-05-13013 May 1999 Provides Util Rept Confirming Completion of Actions Required by NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs U-603201, Forwards 4-yr Updated Certification Rept for Plant Training Simulator.Nrc Form 474, Simulation Facility Certification Also Encl Which Was Developed in Accordance with Reg Guide 1.149 & Ansi/Ans Std Ansi/Ans 3.51999-05-0505 May 1999 Forwards 4-yr Updated Certification Rept for Plant Training Simulator.Nrc Form 474, Simulation Facility Certification Also Encl Which Was Developed in Accordance with Reg Guide 1.149 & Ansi/Ans Std Ansi/Ans 3.5 U-603196, Provides Notification That Util Has Completed Thermo-Lag 330-1 Fire Barrier Corrective Actions as Described in 970619 & s in Addition to Repair of Butt Joint Described in1999-04-27027 April 1999 Provides Notification That Util Has Completed Thermo-Lag 330-1 Fire Barrier Corrective Actions as Described in 970619 & s in Addition to Repair of Butt Joint Described in U-603205, Forwards Annual Radioactive Effluent Release Rept for Clinton Power Station for Period Jan-Dec 1998. Rev 17 to ODCM for Clinton Power Station, Also Encl1999-04-27027 April 1999 Forwards Annual Radioactive Effluent Release Rept for Clinton Power Station for Period Jan-Dec 1998. Rev 17 to ODCM for Clinton Power Station, Also Encl U-603197, Provides Details of Other Activities Being Taken as Part of CPS Plan for Excellence Re Ensureing That CPS Physical Plant & Functional Characteristics Are Consistent with & Are Being Maintained IAW CPS Design Bases1999-04-24024 April 1999 Provides Details of Other Activities Being Taken as Part of CPS Plan for Excellence Re Ensureing That CPS Physical Plant & Functional Characteristics Are Consistent with & Are Being Maintained IAW CPS Design Bases U-603194, Provides Notification That Ta Staber,License SOP-31298,has Resigned Position,Effective 990401.License Status Should Be Changed to Expired1999-04-15015 April 1999 Provides Notification That Ta Staber,License SOP-31298,has Resigned Position,Effective 990401.License Status Should Be Changed to Expired U-603189, Requests That Status of License SOP-31187-1,for Le Anderson, Be Changed to Expired,Per 10CFR50.74.Util Determined That Individual No Longer Has Need for SRO License1999-04-0505 April 1999 Requests That Status of License SOP-31187-1,for Le Anderson, Be Changed to Expired,Per 10CFR50.74.Util Determined That Individual No Longer Has Need for SRO License U-603190, Provides Update for Certain 10CFR50.74(f) Info Addressed in Licensee 980619 Submittal,But Not Included in Final Response1999-04-0202 April 1999 Provides Update for Certain 10CFR50.74(f) Info Addressed in Licensee 980619 Submittal,But Not Included in Final Response U-603185, Forwards Response to NRC RAI Re CPS GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs, Program1999-03-30030 March 1999 Forwards Response to NRC RAI Re CPS GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs, Program U-603186, Forwards Rept on Status of Clinton Power Station Decommissioning Funding,Iaw 10CFR50.75(f)1999-03-29029 March 1999 Forwards Rept on Status of Clinton Power Station Decommissioning Funding,Iaw 10CFR50.75(f) U-603184, Submits Info Re Current Levels of Property Insurance & Sources of Insurance for CPS as Listed,Per 10CFR50.54(w)(3)1999-03-26026 March 1999 Submits Info Re Current Levels of Property Insurance & Sources of Insurance for CPS as Listed,Per 10CFR50.54(w)(3) 05000461/LER-1999-005, Forwards LER 99-005-00,re Inoperability of Standby Gas Treatment Sys Train a Caused by Inadequate Design of Control Circuit.Commitments Listed1999-03-15015 March 1999 Forwards LER 99-005-00,re Inoperability of Standby Gas Treatment Sys Train a Caused by Inadequate Design of Control Circuit.Commitments Listed U-603165, Forwards Revised Data Point Ref File Sheet for Clinton Power Station Computer Point That Inputs to Erds.Change Necessary to Support Plant Mods to Drywell Floor Drain Instrumentation1999-03-12012 March 1999 Forwards Revised Data Point Ref File Sheet for Clinton Power Station Computer Point That Inputs to Erds.Change Necessary to Support Plant Mods to Drywell Floor Drain Instrumentation U-603179, Provides Notification That RG Giuliani & R Zacholski,No Longer Have Need for Operating License.License Status Is Therefore Requested to Be Changed to Expired1999-03-10010 March 1999 Provides Notification That RG Giuliani & R Zacholski,No Longer Have Need for Operating License.License Status Is Therefore Requested to Be Changed to Expired 1999-09-22 Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER) MONTHYEARU-603232, Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted1999-07-0909 July 1999
[Table view]Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted U-603101, Special Rept:On 980918,discovered That Triaxial Seismic Accelerometers Had Not Been Properly Calibrated.Caused by Inadequate Calibration Procedure.Calibration to Be Performed off-site1998-10-28028 October 1998 Special Rept:On 980918,discovered That Triaxial Seismic Accelerometers Had Not Been Properly Calibrated.Caused by Inadequate Calibration Procedure.Calibration to Be Performed off-site U-603014, Special Rept:On 980512,lightning Struck Primary Meteorological Monitoring Instrumentation Tower Damaging 60- Meter Wind Speed & Associated Transmuter Circuit Card. Surveillance Testing Performed1998-05-28028 May 1998 Special Rept:On 980512,lightning Struck Primary Meteorological Monitoring Instrumentation Tower Damaging 60- Meter Wind Speed & Associated Transmuter Circuit Card. Surveillance Testing Performed U-602940, Ro:On 980213,alert Emergency Classification Was Declared IAW EPIP EC-02, Emergency Classifications. Caused by Tripped Inverter.Rhr a Was Restored at Approx 0945 H & Emergency Terminated at 1004 H Per EPIP EC-04, Alert1998-02-20020 February 1998 Ro:On 980213,alert Emergency Classification Was Declared IAW EPIP EC-02, Emergency Classifications. Caused by Tripped Inverter.Rhr a Was Restored at Approx 0945 H & Emergency Terminated at 1004 H Per EPIP EC-04, Alert U-602921, Special Rept:On 980113,operations Personnel Declared Meteorological Tower Wind Direction Instrumentation Inoperable.Consistent Difference Suspected to Have Been Caused by Rotation of Either or Both of Wind Sensor1998-01-29029 January 1998 Special Rept:On 980113,operations Personnel Declared Meteorological Tower Wind Direction Instrumentation Inoperable.Consistent Difference Suspected to Have Been Caused by Rotation of Either or Both of Wind Sensor U-602599, Special Rept:On 960516,Loose Parts Monitoring System Declared Inoperable.Caused by Intermittent Alarms.Removed Temporary Mod & Restored Alarm Feature for Channel Three1996-06-21021 June 1996 Special Rept:On 960516,Loose Parts Monitoring System Declared Inoperable.Caused by Intermittent Alarms.Removed Temporary Mod & Restored Alarm Feature for Channel Three U-602534, Special Rept:On 951206,determined Facility May Have Been Operated Above Max Power Level Authorized by License Due to Error in Reactor Heat Balance.Util Will Bias CRD Sys Flow Process Computer Point1996-01-0303 January 1996 Special Rept:On 951206,determined Facility May Have Been Operated Above Max Power Level Authorized by License Due to Error in Reactor Heat Balance.Util Will Bias CRD Sys Flow Process Computer Point U-602527, Special Rept:On 951103,reactor Water Cleanup Sys Flow Rate Computer Valve Substituted W/Value of Zero & Sys Actually Operating.Caused by Lack of Attention.Shift Technical Advisor Immediately Restored Computer1995-12-0505 December 1995 Special Rept:On 951103,reactor Water Cleanup Sys Flow Rate Computer Valve Substituted W/Value of Zero & Sys Actually Operating.Caused by Lack of Attention.Shift Technical Advisor Immediately Restored Computer U-602426, Ro:On 950301,plant Was Operating at Approx 75% Fire Was Reported in a turbine-driven Reactor Feed Pump Room1995-03-0303 March 1995 Ro:On 950301,plant Was Operating at Approx 75% Fire Was Reported in a turbine-driven Reactor Feed Pump Room U-602421, Ro:On 950216,Div 2 125 Volt Dc Electrical Power Sys Declared Inoperable.Caused by Failure of Silicon Controlled Rectifier Firing Board in Div 2 Battery Charger.Battery Charger Repaired1995-02-22022 February 1995 Ro:On 950216,Div 2 125 Volt Dc Electrical Power Sys Declared Inoperable.Caused by Failure of Silicon Controlled Rectifier Firing Board in Div 2 Battery Charger.Battery Charger Repaired U-602348, Special Rept:On 940906,CPS Declared Loose Parts Monitoring Sys Out of Svc.Caused by False Alarms.Util Will Recalibrate Channel Six1994-10-10010 October 1994 Special Rept:On 940906,CPS Declared Loose Parts Monitoring Sys Out of Svc.Caused by False Alarms.Util Will Recalibrate Channel Six U-602311, Special Rept:On 940624,inoperabilities of Meteorological Monitoring Instrumentation Channels for More than 7 Days Identified.Personnel Worked Expeditiously to Return Meteorological Instrumentation to Operable Status1994-07-12012 July 1994 Special Rept:On 940624,inoperabilities of Meteorological Monitoring Instrumentation Channels for More than 7 Days Identified.Personnel Worked Expeditiously to Return Meteorological Instrumentation to Operable Status U-602308, Special Rept:On 940607,determined Valid Failure of Div 1 EDG Had Occurred Due to Excessive Current.Replaced Failed Relay1994-07-0707 July 1994 Special Rept:On 940607,determined Valid Failure of Div 1 EDG Had Occurred Due to Excessive Current.Replaced Failed Relay U-602193, Special Rept:On 930927,valid Failure of Div II DG Occurred During Surveillance Testing.Caused by Insufficient Contact Pressure Between Contacting Surfaces.Contact Pressure Checks to Improve Component Reliability Implemented1993-10-12012 October 1993 Special Rept:On 930927,valid Failure of Div II DG Occurred During Surveillance Testing.Caused by Insufficient Contact Pressure Between Contacting Surfaces.Contact Pressure Checks to Improve Component Reliability Implemented U-602189, Follow-up Special Rept on Progress of Investigation Into Diesel I DG Test Failures That Occurred on 930623,0721 & 0803.Current Number of Valid Failures in Last 100 Valid Tests of DG1A Is Seven.Testing for DG1A Conducted1993-09-24024 September 1993 Follow-up Special Rept on Progress of Investigation Into Diesel I DG Test Failures That Occurred on 930623,0721 & 0803.Current Number of Valid Failures in Last 100 Valid Tests of DG1A Is Seven.Testing for DG1A Conducted U-602181, Special Rept:On 930812-30,differential Air Temp Instrumentation Inoperable.Caused by Problem W/Power Supply Panel 0EM01J.Replacement Power Supply Unavailable. Engineering Change Request ECN 28103 Processed1993-08-30030 August 1993 Special Rept:On 930812-30,differential Air Temp Instrumentation Inoperable.Caused by Problem W/Power Supply Panel 0EM01J.Replacement Power Supply Unavailable. Engineering Change Request ECN 28103 Processed U-602174, Special Rept:On 930721 & 0803,valid Test Failures of Div I DG Occurred Due to Problem W/Contacts within Breaker Control Switch & Failed Coil in B-C Phase Undervoltage Relay, Respectively.Subj Parts Will Be Replaced During DG Outage1993-08-20020 August 1993 Special Rept:On 930721 & 0803,valid Test Failures of Div I DG Occurred Due to Problem W/Contacts within Breaker Control Switch & Failed Coil in B-C Phase Undervoltage Relay, Respectively.Subj Parts Will Be Replaced During DG Outage U-602163, Special Rept:On 930623,Div I DG (DG1A) Failed to Synchronize W/Associated Safety Bus & Generator Output Breaker Tripped on Reverse Power Signal Due to Faulty Reverse Power Relay. DG1A Reverse Power Relay Replaced W/Newer Model1993-07-23023 July 1993 Special Rept:On 930623,Div I DG (DG1A) Failed to Synchronize W/Associated Safety Bus & Generator Output Breaker Tripped on Reverse Power Signal Due to Faulty Reverse Power Relay. DG1A Reverse Power Relay Replaced W/Newer Model U-602068, Ro:On 921107,ORIX-PR008 Was Declared Inoperable Due to Lo Fail Signal Received for Channel 3 Which Was Unable to Be Reset.Preplanned Alternate Method of Monitoring HVAC Stack Initiated1992-11-24024 November 1992 Ro:On 921107,ORIX-PR008 Was Declared Inoperable Due to Lo Fail Signal Received for Channel 3 Which Was Unable to Be Reset.Preplanned Alternate Method of Monitoring HVAC Stack Initiated U-602057, Special Rept:On 920921,generator Output Breaker Failed to Close on Four Attempts.Caused by Bent Protective Cover Over Auxiliary Switches & anti-pump Coil.Output Breaker Racked to Test Position & Sucessfully Cycled Three Times1992-10-20020 October 1992 Special Rept:On 920921,generator Output Breaker Failed to Close on Four Attempts.Caused by Bent Protective Cover Over Auxiliary Switches & anti-pump Coil.Output Breaker Racked to Test Position & Sucessfully Cycled Three Times U-602049, Ro:On 920922,Control Room Received Notification That Employee Working in Radwaste Sort Tent Had Been Injured & Potentially Contaminated.Ambulance Called to Respond.Hosp Notified Util That Victim Was Not Contaminated1992-09-28028 September 1992 Ro:On 920922,Control Room Received Notification That Employee Working in Radwaste Sort Tent Had Been Injured & Potentially Contaminated.Ambulance Called to Respond.Hosp Notified Util That Victim Was Not Contaminated U-602035, Special Rept:On 920717 & 0807,output Breaker Failed to Close During Periodic Testing of Dg.Caused by Failure of H1 trunk-operated Contact Switch Due to Slight Breaker Movement.Vendor Manual for Switchgear Will Be Reviewed1992-08-19019 August 1992 Special Rept:On 920717 & 0807,output Breaker Failed to Close During Periodic Testing of Dg.Caused by Failure of H1 trunk-operated Contact Switch Due to Slight Breaker Movement.Vendor Manual for Switchgear Will Be Reviewed ML20216J2861992-08-0808 August 1992 Special Rept:On 920712,determined That Valid Failure of Div 1 EDG Occurred.Caused by B-C Phase CV-2 Relay Telephone Coil Failing Due to Excessive Current.Design Change Mod Initiated.Also Reportable Per Part 21 U-601991, Ro:On 920522,discovered That External Vessel Surface Was Hot & Chart Recorder Indicated Absorber Bed Temp Greater than 300F.Fire Brigade Was Activated.Sampling Process Established to Monitor Purge Exhaust Composition1992-06-0101 June 1992 Ro:On 920522,discovered That External Vessel Surface Was Hot & Chart Recorder Indicated Absorber Bed Temp Greater than 300F.Fire Brigade Was Activated.Sampling Process Established to Monitor Purge Exhaust Composition U-601970, Special Rept:On 920328,diesel Generator 1B Manually Started But Stabilized Outside TS Range of 60 + or - Hz. Caused by Failure of Power Supply for Electronic Speed Controller.Power Supply Replaced1992-04-24024 April 1992 Special Rept:On 920328,diesel Generator 1B Manually Started But Stabilized Outside TS Range of 60 + or - Hz. Caused by Failure of Power Supply for Electronic Speed Controller.Power Supply Replaced U-601946, Special Rept:On 920302,meteorological Tower Differential Air Temp Instrumentation Declared Inoperable to Facilitate Troubleshooting Re Discrepancy in Meteorological Data. Missing Ducting Tube from Aspirator Installed1992-03-0606 March 1992 Special Rept:On 920302,meteorological Tower Differential Air Temp Instrumentation Declared Inoperable to Facilitate Troubleshooting Re Discrepancy in Meteorological Data. Missing Ducting Tube from Aspirator Installed U-601942, Revised Special Rept Re non-valid Test Failure of Div I DG, Describing Correct Steps Involved in Synchronizing DG W/ Offsite Power.Dg Output Voltage Adjusted Such That It Is Slightly Higher than Offsite Power Voltage1992-03-0202 March 1992 Revised Special Rept Re non-valid Test Failure of Div I DG, Describing Correct Steps Involved in Synchronizing DG W/ Offsite Power.Dg Output Voltage Adjusted Such That It Is Slightly Higher than Offsite Power Voltage U-601931, Special Rept:On 920109,diesel Generator 1A Tripped Due to Reverse Power.Caused by Improper Manual Loading Following Synchronization W/Offsite Power.Dg 1A Manually Started to Demonstrate Operability Per Surveillance Procedure 9080.011992-02-0505 February 1992 Special Rept:On 920109,diesel Generator 1A Tripped Due to Reverse Power.Caused by Improper Manual Loading Following Synchronization W/Offsite Power.Dg 1A Manually Started to Demonstrate Operability Per Surveillance Procedure 9080.01 U-601893, Special Rept:On 911001,ORIX-PRO12 Declared Inoperable in Order to Perform Channel Calibr in Accordance W/Ts Surveillance Requirement 4.3.7.5.Calibr Initially Performed by day-shift C&I Crew,Then Backshift Crew1991-10-17017 October 1991 Special Rept:On 911001,ORIX-PRO12 Declared Inoperable in Order to Perform Channel Calibr in Accordance W/Ts Surveillance Requirement 4.3.7.5.Calibr Initially Performed by day-shift C&I Crew,Then Backshift Crew U-601834, Special Rept:On 910404,during Surveillance Diesel Generator 1A Reached Required Voltage & Frequency But Failed to Close & Phase Undervoltage Relay B-C Tripped.Cause Not Determined.Racking Mechanism Will Be Inspected & Lubricated1991-05-0606 May 1991 Special Rept:On 910404,during Surveillance Diesel Generator 1A Reached Required Voltage & Frequency But Failed to Close & Phase Undervoltage Relay B-C Tripped.Cause Not Determined.Racking Mechanism Will Be Inspected & Lubricated U-601788, Special Rept:On 910106,Div II Diesel Generator Failed During Test.Caused by Malfunction of A-3 Relay Tachometer. Preventive Maint Task Will Be Issued to Remove,Inspect & Bench Test A-3 Relay Every Two Yrs1991-02-0505 February 1991 Special Rept:On 910106,Div II Diesel Generator Failed During Test.Caused by Malfunction of A-3 Relay Tachometer. Preventive Maint Task Will Be Issued to Remove,Inspect & Bench Test A-3 Relay Every Two Yrs U-601309, Ro:On 881111,generator Trip W/Reactor Scram Occurred Due to Sudden Pressure Actuation on 1C Main Power Transformer & Fire on Insulator of 1C Main Power Transformer Discovered. Fire Extinguished1988-11-12012 November 1988 Ro:On 881111,generator Trip W/Reactor Scram Occurred Due to Sudden Pressure Actuation on 1C Main Power Transformer & Fire on Insulator of 1C Main Power Transformer Discovered. Fire Extinguished U-601298, Ro:On 881026,Tech Spec 3.0.3 Entered Due to Declaring Control Room Ventilation Train a Inoperable.Caused by Faulty Flow Transmitter.Reactor Power Was Reduced & Calibr on Train a Flow Transmitter Performed1988-10-27027 October 1988 Ro:On 881026,Tech Spec 3.0.3 Entered Due to Declaring Control Room Ventilation Train a Inoperable.Caused by Faulty Flow Transmitter.Reactor Power Was Reduced & Calibr on Train a Flow Transmitter Performed U-601265, Ro:On 880901,HPCS Initiated & Injected Water Into Reactor for 28 During Maint Surveillance Activities on Reactor Water Level Transmitter.Injection Valve & HPCS Pump Secured. Notification of Unusual Event Lasted Approx 10 Minutes1988-09-0202 September 1988 Ro:On 880901,HPCS Initiated & Injected Water Into Reactor for 28 During Maint Surveillance Activities on Reactor Water Level Transmitter.Injection Valve & HPCS Pump Secured. Notification of Unusual Event Lasted Approx 10 Minutes U-601258, Special Rept:On 880803,accident Monitoring Instrumentation for HVAC Stack Declared Inoperable for More That 72 H.Caused by Underway Work to Perform Routine Channel Calibr.Plant Condition Rept Initiated1988-08-22022 August 1988 Special Rept:On 880803,accident Monitoring Instrumentation for HVAC Stack Declared Inoperable for More That 72 H.Caused by Underway Work to Perform Routine Channel Calibr.Plant Condition Rept Initiated U-601219, Ro:On 880623,maint Technician Badly Burned in 762-ft Radwaste Evaporator Vapor Body Room.Caused by Performing Work on Wrong Evaporator.Evaporator Secured & Technician Given Medical Attention1988-06-24024 June 1988 Ro:On 880623,maint Technician Badly Burned in 762-ft Radwaste Evaporator Vapor Body Room.Caused by Performing Work on Wrong Evaporator.Evaporator Secured & Technician Given Medical Attention U-601173, Special Rept:On 880329,discovered Failure of Wind Velocity & Direction Sensors on Facility Meteorological Tower.Caused by Inadvertent Exposure of Sensors to Weather.Sensor Assembly, Including Retaining Device Replaced1988-04-15015 April 1988 Special Rept:On 880329,discovered Failure of Wind Velocity & Direction Sensors on Facility Meteorological Tower.Caused by Inadvertent Exposure of Sensors to Weather.Sensor Assembly, Including Retaining Device Replaced U-601026, Summary Rept:On 870828,notification of Unusual Event Declared Per Emergency Plan Implementing Procedures EC-02. Personnel Informed of Bomb Threat Made Against Util.Security Levels Tightened & Searches Performed.No Explosives Found1987-08-31031 August 1987 Summary Rept:On 870828,notification of Unusual Event Declared Per Emergency Plan Implementing Procedures EC-02. Personnel Informed of Bomb Threat Made Against Util.Security Levels Tightened & Searches Performed.No Explosives Found U-601015, Ro:On 870816,protected Area Intrusion Detection Sys Deactivated Due to Severe Weather.Compensatory Measures in Place.Security Personnel Removed from Post booths.Closed- Circuit Television Observers Posted Until Weather Cleared1987-08-21021 August 1987 Ro:On 870816,protected Area Intrusion Detection Sys Deactivated Due to Severe Weather.Compensatory Measures in Place.Security Personnel Removed from Post booths.Closed- Circuit Television Observers Posted Until Weather Cleared U-601017, Ro:On 870819,bomb Threat Received.Security Levels Tightened. State of Il,Nrc Incident Response Ctr & NRC Resident Inspector Notified.No Explosives Located1987-08-20020 August 1987 Ro:On 870819,bomb Threat Received.Security Levels Tightened. State of Il,Nrc Incident Response Ctr & NRC Resident Inspector Notified.No Explosives Located U-601004, Ro:On 870804,notification of Unusual Event Declared Due to Inoperability of Channel 1B21-N697A,LPCS,LPCI & RHR B. Functional Test of Channel Performed & Device,Lpcs & LPCI Declared Operable.Notification of Unusual Event Terminated1987-08-0505 August 1987 Ro:On 870804,notification of Unusual Event Declared Due to Inoperability of Channel 1B21-N697A,LPCS,LPCI & RHR B. Functional Test of Channel Performed & Device,Lpcs & LPCI Declared Operable.Notification of Unusual Event Terminated ML20236B5881987-07-17017 July 1987 Special Rept:On 870610,loose Parts Monitoring Sys Channels Went Into Alarm & Could Not Be Reset.Caused by Flow Noise from Reactor Recirculation Sys Flow Control Valve in Throttled Position.Alarm Temporarily Disabled U-600977, Ro:On 870704,protected Area Intrusion Detection Sys Deactivated Due to Severe Weather.Compensatory Measures Not Taken Due to Personnel Safety.Util Will Review Area of Formal Communications & Take Corrective Actions1987-07-11011 July 1987 Ro:On 870704,protected Area Intrusion Detection Sys Deactivated Due to Severe Weather.Compensatory Measures Not Taken Due to Personnel Safety.Util Will Review Area of Formal Communications & Take Corrective Actions U-600970, Special Rept:On 870608,plant Failed to Reach Rated Voltage & Rated Speed in Equal to or Less than 12 S.Caused by Linkage Connecting Shaft to Fuel Rack Out of Alignment.Alignment Requirements & Linkage Reworked1987-07-0808 July 1987 Special Rept:On 870608,plant Failed to Reach Rated Voltage & Rated Speed in Equal to or Less than 12 S.Caused by Linkage Connecting Shaft to Fuel Rack Out of Alignment.Alignment Requirements & Linkage Reworked U-600964, Special Rept:On 870610,earthquake Estimated to Be 5.0 on Richter Scale Noted.Walkdowns of Plant Structures & Sys Conducted.No Damage or Abnormal Conditions Observed.Related Info,Including Sargent & Lundy ...Seismic...Rept, Encl1987-06-19019 June 1987 Special Rept:On 870610,earthquake Estimated to Be 5.0 on Richter Scale Noted.Walkdowns of Plant Structures & Sys Conducted.No Damage or Abnormal Conditions Observed.Related Info,Including Sargent & Lundy ...Seismic...Rept, Encl U-600956, Final Status of Repair & Anticipated Schedule for Restoration of Remaining Out of Svc Annunciators.One Annunciator Listed in Groups 1 & 2 of Util Remain to Be Repaired1987-06-11011 June 1987 Final Status of Repair & Anticipated Schedule for Restoration of Remaining Out of Svc Annunciators.One Annunciator Listed in Groups 1 & 2 of Util Remain to Be Repaired U-600947, Notification of Unusual Event:On 870524,motor-driven Feed Pump Regulating Valve 1FW-F004 Malfunctioned,Increasing Reactor Water Level.Cause Under Investigation.Valve Shifted to Manual Control W/No Response.Event Terminated Same Day1987-05-26026 May 1987 Notification of Unusual Event:On 870524,motor-driven Feed Pump Regulating Valve 1FW-F004 Malfunctioned,Increasing Reactor Water Level.Cause Under Investigation.Valve Shifted to Manual Control W/No Response.Event Terminated Same Day U-600941, Special Rept:On 870411,operator Discovered No Power to Play Back Pens (All Lights Out) of Playback Unit.Caused by Blown Fuses of Recorder,Playback & Analyzer.Sensor & Portion of Circuit Boards Have Been Replaced1987-05-21021 May 1987 Special Rept:On 870411,operator Discovered No Power to Play Back Pens (All Lights Out) of Playback Unit.Caused by Blown Fuses of Recorder,Playback & Analyzer.Sensor & Portion of Circuit Boards Have Been Replaced U-600928, Ro:On 870506,reactor Manually Scrammed When Reactor Pressure Vessel Level Began to Rise.Caused by Failure of Feedwater Valve Controlling Flow of Water to Reactor to Open.Reactor Shut Down.State of Il & NRC Response Ctr Notified1987-05-0606 May 1987 Ro:On 870506,reactor Manually Scrammed When Reactor Pressure Vessel Level Began to Rise.Caused by Failure of Feedwater Valve Controlling Flow of Water to Reactor to Open.Reactor Shut Down.State of Il & NRC Response Ctr Notified U-600890, Ro:On 870322,containment Isolation Occurred on Instrument Air Sys During Surveillance of ECCS Reactor Water Level Channel Functional Checklist.Cause Not Stated.Reactor Shut Down1987-03-23023 March 1987 Ro:On 870322,containment Isolation Occurred on Instrument Air Sys During Surveillance of ECCS Reactor Water Level Channel Functional Checklist.Cause Not Stated.Reactor Shut Down 1999-07-09 Category:TEXT-SAFETY REPORT MONTHYEARU-603277, Monthly Operating Rept for Sept 1999 for Clinton Power Station,Unit 1.With1999-09-30030 September 1999
[Table view]Monthly Operating Rept for Sept 1999 for Clinton Power Station,Unit 1.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers U-603267, Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With U-603245, Monthly Operating Rept for Jul 1999 for CPS Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for Jul 1999 for CPS Unit 1.With ML20211C9621999-07-26026 July 1999 ISI Summary Rept U-603232, Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted1999-07-0909 July 1999 Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted U-603233, Monthly Operating Rept for June 1999 for Clinton Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Clinton Power Station,Unit 1.With U-603222, Monthly Operating Rept for May 1999 for Clinton Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Clinton Power Station.With ML20210K8391999-05-11011 May 1999 British Energy Annual Rept & Accounts 1998-99 ML20206H1231999-05-0505 May 1999 Illinois Power Co CPS Main CR Simulator Certification Rept U-603210, Monthly Operating Rept for Apr 1999 for Cps,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Cps,Unit 1.With U-603204, Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR211999-04-30030 April 1999 Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR21 U-603192, Monthly Operating Rept for Mar 1999 for Clinton Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Clinton Power Station,Unit 1.With U-603182, Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue1999-03-12012 March 1999 Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue U-603176, Monthly Operating Rept for Feb 1999 for Clinton Power Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Clinton Power Station,Unit 1.With ML20207F2031999-02-10010 February 1999 Rev 1 to CPS COLR for Reload 6 Cycle 7 ML20202J0181999-02-0303 February 1999 SER Accepting Changes in Quality Assurance Program,Which Continues to Meet Requirements of App B to 10CFR50 U-603144, Monthly Operating Rept for Dec 1998 for Clinton Power Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Clinton Power Station,Unit 1.With U-603223, Illinova Corp 1998 Annual Rept. with1998-12-31031 December 1998 Illinova Corp 1998 Annual Rept. with U-603115, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components1998-12-0404 December 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components U-603124, Monthly Operating Rept for Nov 1998 for Clinton Power Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Clinton Power Station,Unit 1.With U-603114, Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor1998-11-25025 November 1998 Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor U-603103, Monthly Operating Rept for Oct 1998 for Clinton Power Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Clinton Power Station,Unit 1.With U-603101, Special Rept:On 980918,discovered That Triaxial Seismic Accelerometers Had Not Been Properly Calibrated.Caused by Inadequate Calibration Procedure.Calibration to Be Performed off-site1998-10-28028 October 1998 Special Rept:On 980918,discovered That Triaxial Seismic Accelerometers Had Not Been Properly Calibrated.Caused by Inadequate Calibration Procedure.Calibration to Be Performed off-site ML20154F8701998-10-0606 October 1998 Safety Evaluation Authorizing Proposed Alternative to Requirements of OMa-1988,Part 10,Section 4.2.2.3 for 21 Category a Reactor Coolant Sys Pressure Isolation Valves U-603091, Monthly Operating Rept for Sept 1998 for Clinton Power Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Clinton Power Station,Unit 1.With ML20153F9871998-09-17017 September 1998 Safety Evaluation Accepting 980225 Proposed Rev 26 to Illinois Power Nuclear Program Qam ML20151U1391998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Clinton Power Station,Unit 1 ML20237E3991998-08-27027 August 1998 SER Accepting Licensee Response to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode, for Clinton Power Station ML20237A1521998-08-0707 August 1998 SER Re Mgt Services Agreement at Clinton Power Station. Approval Under 10CFR50.80 Not Required ML20151Y6591998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Clinton Power Station,Unit 1 U-603033, Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals1998-07-20020 July 1998 Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals U-603041, Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 1 ML20151U1501998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Clinton Power Station,Unit 1 U-603023, Monthly Operating Rept for May 1998 for Clinton Power Station,Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Clinton Power Station,Unit 1 U-603014, Special Rept:On 980512,lightning Struck Primary Meteorological Monitoring Instrumentation Tower Damaging 60- Meter Wind Speed & Associated Transmuter Circuit Card. Surveillance Testing Performed1998-05-28028 May 1998 Special Rept:On 980512,lightning Struck Primary Meteorological Monitoring Instrumentation Tower Damaging 60- Meter Wind Speed & Associated Transmuter Circuit Card. Surveillance Testing Performed ML20236E7991998-05-26026 May 1998 Final Part 21 Rept Re W Dhp Circuit Breaker Auxillary Switch Operating Assembly Anomalies.Caused by Loss of Breaker Safety Function.Dhp Circuit Will Be Inspected ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted U-603004, Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable1998-05-15015 May 1998 Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable ML20216A9601998-05-0808 May 1998 Part 21 Rept Re Failure of 12 Volt DC Inverter Power Supply. Caused by Inadequately Sized Output Transistor Pair Combined W/Degraded Capacitors.Licensee Plans to Replace All Output Transistors & Degraded Capacitors U-602995, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts1998-05-0505 May 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts U-603006, Monthly Operating Rept for Apr 1998 for Clinton Power Station,Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Clinton Power Station,Unit 1 U-602994, Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable1998-04-29029 April 1998 Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable ML20216B1351998-04-21021 April 1998 Rev 0 to Illinois Power Co Clinton Power Station SVC Design Rept U-602979, Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable1998-04-0707 April 1998 Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable U-602976, Monthly Operating Rept for Mar 1998 for Clinton Power Station1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Clinton Power Station ML20217H5771998-03-27027 March 1998 Safety Evaluation Concluding That No Significant Safety Hazards Introduced at CPS for Net 32% Ampacity Derating Factor for 1 H & 3 H Conduit Fire Barrier Sys & 1 H Cable Tray Fire Barrier Sys.Requests Response Addressing Issue U-602968, Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue1998-03-24024 March 1998 Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue U-602960, Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 9804111998-03-12012 March 1998 Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 980411 U-602954, Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 9805131998-03-0909 March 1998 Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 980513 1999-09-30 |
Text
LM6 I
1 J.'.
~ *- .
U-600956 a
j L30-87 (06 - 11)-L 1A.120
/LLINDIS POWER 00MPANY CtlNTON POWER STATION, P o. BOX 678 CLINTON. ILLINOIS 61727 June 11, 1987 PRIORITY ROUTIt;G.
v V EA Mi b fW 0 Docket 50-461 N _ 4 '
v e@ S~ f . A
'Mr. A. B. Davis M gq Regional Administrator gu y i Region III q U.S. Nuclear Regulatory Commission ]
799 Roosevelt Road l Glen Ellyn, Illinois 60137 J 1
Subject:
.Out-of-Service Annunciators j i
Dear Mr. Davis:
In previous' letters (April-15, May 8, May 27, 1987)', . Illinois Power.
reported to you the status of out-of-service annunciators. The purpose-of this letter is to provide the final status of repair and anticipated schedule for restoration of the remaining two out-of-service- 1 annunciators. ,
In the' April 15,-1987 letter, IP~ categorized and listid.the. subject- j annunciators in two groups. Group 1 consisted of those' annunciators 3' requiring a panel outage in order to facilitate repair and Group'2 annunciators were capable of being repaired during normal scheduled' i maintenance. :
As of this date, one annunciator listed in each category in'the 1 April 15, 1987, letter remains to be repaired. The annunciator remaining in Group 1 requires spare parts which should be available on site on or about June 26, 1987. IP anticipates that the final repair j will be completed at'an opportune time in the plant operating schedule with consideration being taken for plant operating conditions and .
Startup program testing. The remaining Group-2-annunciator is scheduled for repair on June 13, 1987, plant conditions permitting. ;i 1
Since listing the specific annunciators in our April 15, 1987 ,
submittal, other plant annunciators have been determined to be out-of-service. At present there'are a total of ten annunciators-
~
out-of-service which will be repaired as plant. conditions warrant.-
~
i l
1
~
8706230088 870611
M 151987L '
PDR ADOCK 05000461 >
j '
PDR. ,< . <
YGli) g s . ,
i
~.' ;)
j we, ,
. U-600956 1 r L30-87 (06 -11)-L :
1A.120 1
[
'1 This. completes our report to you on the subject annunciator ']
m - restoration.- Should'you have.any questions'or-require. additional- 6 information, please contact me.'
Sincerely yours, :l l
h.k .C ' > .l F. A. Sr gen' erg III . . .
Manager - Licensing and Safety: :1
,d GSL/cke Lec: B. L. Siege 1~, NRC Clinton Licensing Project Manager
. Illinois Department of Nuclear Safety-NRC Resident Office
=.
N a
1 t
..]
)
i i
d I
l
- j
.q a
, , y n
- . e ,
h a'