AUG 1 1986 Ms. Patricia F.
Hough Science A1>pl i c a ti on s International Corporation 1710 Goodridge Drive IN RESPONSE REFER <
McLean, VA 22102 TO FOIA-86-391
Dear Ms. Hough:
This is in regard to your request, pursuant to the Freedom of Information Act.,
to which the NRC assigned the above number.
This is a partial response to your request.
We will notify you upon completion of search for and review of nny additional records subject to your request.
l_
The staff has completed the search for and review of records subject to your request, and this is the final response to your request.
The NRC hat, no records subject to your request.-
Records subject to your request are available for public inspection and copying at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555, as noted on the enclosure (s).
The PDR accession number is identified beside each record description.
_X __.
Records subject to your request are being made available for public inspection and copying at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555, in the PDR file folder under the above number and your name.
These records are listed on the enclosure (s).
_X._ _
We are enclosing a notice.that provides information about charges and procedures for obtaining records from t he. PDR.
Sincerely
.O h..
'~~-
Dh nie H.
Grimsley, Director Dtvision of Rules and Records Office of Administration Enclosure (n1:
As s tat ed 86093013b @ #
FOl^
PDP PDR HOUCH36-341
.o APPENDIX A
't FOIA 86-391 (DIABLO CANYON)
Date Description 1
7/31/73 Memo to Karl R. Goller from William P. Gammill,) Acceptance Review of Diablo Canyon Units 1 & 2 ('SAR) (16p 2*
10/31/73 Summary of Site Visit and Meeting Held on October 25, 1973 to Discuss Questions Related to the Geology and Seismology of the Area (3p) u 3.
1141/73 Memo to Joseph M. Hendrie from William P. Gammill, Diablo Canyon - New Fault Reported by USGS Two Miles Offshore in the Vicinity of the Site (2p) 4 1/11/74 Summary of Maeting Held to Discuss Recent Offshore Explorations of USGS and PG&E(3p) 5.
1/23/74 Summary of Meeting Held with Potentia 1 Diable Canyon Intervenors in San Luis Obispo, California (7p) s, 3/1/74 Summary of Geology Related Site Visit and Meeting Held on February 22,1974 (3p)
' 7.
3/28/.74 Letter to William Gammill from Department of Interior, Elmer H. Baltz, Preliminary Review of Aspects of Geologic Data Presented in the FSAR (4p)
'g.,5/2/74 Noteto.:R.C.*DeYoungfromThomasJ.Hir5ns,OutstandingItems in the Diablo Canyon Safety Review (3p) 9*
5/15/74 Summary of Meeting Held with PG&E and USGS to Discuss Seismic Issues Related to the Diablo Canyon Units 1 and 2,(Sp)
(
10 7/3/74 Note to L. Manning Huntzing from A. Giambusso, Status Report l
on Selected Licensing Cases ending June 29,1974 (4p) 11*
7/11/74 Summary of Meeting Held on July 5,1974 Regarding Offshore Faults (6p) 12, 7/16/74 Note to L. Manning Muntzing from A. Giambusso, Status Report on Selected Licensing Cases ending July 13,1974 (2p) i 13 7/23/74 Note to L. Manning Muntzing from A. Giambusso, Status Report on Selected Licensing Cases ending July 20,1974 (2p) l
14, 7/29/74 Note to L. Manning Muntzing from A. Giambusso, Status Report on Selected Licensing Cases ending July 27, 1974 (Rp) 15 9/6/74 Note to Edson G. Case from R. C. DeYoung, Status of the Geology and Seismology Portion of the Diablo Canyon Operating License Safety Review (7p) 16*
10/1/74 Note to L. Manning Muntzing from A. Giambusso, Status Report on Selected Licensing Cases ending September 27, 1974 (2p) 17' 10/9/74 Note to L. Manning Muntzing from A. Giambusso, Status Report on Selected Licensing Cases ending October 5, 1974 (4p) 18*
Undated Note to L. Manning Muntzing from A. Giambusso, Status Report on Selected Licensing Cases ending October 12, 1974 (2p) t 3.*
19.
10/22/74 Note to L. Manning Muntzing from A. Giambusso, Status Report on Selected Licensing Cases ending October 19, 1974 (2p) 20.
10/30/74 Note to L. Manning Muntzing from A. Giambusso, Status Report on Selected Licensing Cases ending October 26, 1974 (2p) 21.
11/4/74 Note to'H. Denton, W. Gammill, C. Stepp, R..Hoffman, G. Hulman, and E. Hawkins, Geology-Seismology Report for Diablo Canyon (1p) 22.
12/23/74 Note to E. G. Case from R. C. DeYoung, USGS letter for Diablo Canyon for ACRS Subcommittee Meeting Scheduled for 1/28/75 (1p) 23, 1/28/75 Letter to General L. Gossick from Department of Interior, Henry Cou11er, Review of the Geologic and Seismologic Data Relevant to Diablo Canyon (10p) 24 1/30/75.'
Memo td R. C' DeYoung from H. Denton, Supplement to Safety Evaluation Report for Geology, Seismology and Foundation Engineering (15p) 25, 2/4/75 Flash Note to 0. Parr from D. Allison, Diablo Canyon Seismic Evaluation (1p) 26, 2/24/75 Memo to H. Denton from R. McMullen and J. C. Stepp, Meeting with the U.S. Geological Survey Regarding the Geology and Seismology of the Diablo Canyon Nuclear Site (3p) 27, 2/24/75 Summary of Meeting Held on February 7, 1975 to Discuss Geology and Seismology of the Diablo Canyon Site (6p) y h~ 28, 3/3/75 Memo to R. R. Maccary from L. C. Shao, Areas of Concern in Seismic Analysis and Design on Diablo Canyon (2p)
29 3/5/75 Summary of Meeting Held on March 3, 1975 with PG&E Management to Discuss Diablo Canyon Geologic and Seismic Issues (Sp) 30, 3/12/75 Note to Lee V. Gossick from A. Giambusso, Status Report on Selected Licensing Cases ending March 8,1975 (2p) 31 3/13/75 Memo to F. Schroeder from H. Denton, USGS Release of the Offshore Data of Silver (1p) 32.
3/18/75 Note to L. Gossick from A. Giambusso, Status Report on Selected Licensing Cases ending March 15,1975 (2p) 33.
3/18/75 Summary of ACRS Subcommittee Meeting Held on February 18-19, 1975(29p) 34.
3/V[h5 Memo to W. Gammill from R. B. Hofmann, Telephone Conversation with Douglas Hamilton of Earth Science Associates (Consultants to PG&E Re:
Diablo Canyon Power Plant)(2p) 35 5/19/75 Memo to R. Maccary from J. Knight and L. L. Shao, Highlights of PG&E Diablo Canyon Plant Seismic Design Audit (45p) 35.
7/3/75 Memo to'A. Giambusso from R. C. DeYoung, Diablo. Canyon Interrogatories (8p) 37 10/24/75 Memo to R. C. DeYoung from H. Denton, Seismic Stability of Cut Slope (Sp) 38 10/30/75 Summary of Meeting with Pacific Gas and Electric Company to Discuss Forthcoming Geology / Seismology Submittal for Diablo gf. (
)
l Canyon, Units 1 & 2 (OL) (8p) 39.~, 12/24/75.*
Memo to.:R. S.' Boyd from 0. Parr, Diablo Canyon Geology (lp) 40 1/5/76 Memo to R. Boyd from R. C. DeYoung, Diablo Canyon Geology-Seismology Situation (Sp) 41.
1/7/76' Summary of Meeting Held on November 25, 1975 to discuss Recent Staff Questions on Gelogy, Seismology and Structural Engineering (3p) 42.
1/9/76 Memo to R. C. DeYoung from R. Maccary, Potential Earthquake Effects of the Hoagri Fault Zone, Diablo Canyon (3p) l 43.
1/21/76 Memo to R. D. DeYoung from W. Gammill, Anticipated Meeting with Applicant -- USGS Geologic and Seismic Review (2p) 44 1/28/76 Memo to R. S. Boyd from R. C. DeYoung, Meeting with Newmark, Hall, and USGS Concerning Diablo Canyon Seismic Design (7p)
- 4. -
l
D 45.
2/2/76 Memo to R. S. Boyd from R. C. DeYoung, Supplement to the Minutes of the Meeting with Newmark, Hall, and USGS,Concerning Diablo Canyon Seismic Design (3p) 46, 2/3/76 Note to H. Denton from J. C. Stepp, Current USGS Case Review Status and Problems (4p) 47, 2/11/76 Sumary of Meeting Held on Januar to Discuss Diablo Canyon Seismic Design (3p) y 13,1976 48, 2/11/76 Sumary of Meeting Held on January 14, 1976 to Discuss Diablo Canyon Seismic Design (3p) 49*
2/17/76 Memo to 0. Parr from D. Allison, Meeting with Dr. N.(2p)
Newmark and W. Hall Concerning Diablo Canyon Seismic Design
.x s 50 3/4/76 Sumary of Meeting Held on February 5 1976 to Discuss Geology and Seismology of Diablo Canyon Site (,7p) 51 3/26/76 Summary of March 23, 1976 Meeting with Newmark and USGS to Discuss Seismic Design of Diablo Canyon (3p) 52 4/22/76 Memo to'B. Rusche from R. S. Boyd, H. Denton, R. E. Heineman, Dr. N. M. Newmark's Review of the Diablo Canyon Seismic Design (14p)
Sa 5/10/76 Memo to W. Gammill from J. C. Stepp, Maccary')s Coments on LLL Report on Diablo Canyon Seismic Input (lp 54.
5/18/76 Sumary of Meeting Held on April 20, 1976 to Discuss Seismic Reevaluation of Diablo Canyon (Sp) 55, 6/7/76 Sumary of ACRS Subcommittee Meeting Held on May 21, 1976 Regardi'ng Di'ablo Canyon in Avila Beach Near San Luis Obispo, l'
California (6p) 56, 6/30/76 Summary of Meeting Held on June 10, 1976 to Discuss Seismic Design Reevaluation of Diablo Canyon (44p) 57 7/6/76 Summary of Meeting Held on June 23, 1976 to Discuss Canyon Saismic Design Reevaluation (3p) l 58 7/30/76 (2)
Summary of Advisory Committee on Reactor Safcquards (ACRS)
Subcommittee Meeting Concerning the Diablo Canyon Operating License Application in San Luis Obispo, California (4p) i 59 8/25/76 Summary of Meeting Held on August 11, 1976 to Discuss Seismic Reevaluation of Diablo Canyon (42p)
D,
60.
9/14/76 Summary of Meeting Held on August 27, 1976 to Discuss Seismic Design Reevaluation (4p) 61.
9/17/76 Sunmary of Meeting Held on September 7, 1976 to Discuss Seismic Design Reevaluation (7p) 62.
10/19/76 Summary of Advisory Committee on Reactor Safeguards (ACRS)
Subcommittee Meeting (Sp)Concerning the Diablo Canyon Operating License Application 63.
11/24/76 Memo to H. Denton from R. B. Hofmann, Recommendatio s )Concerning Possible Courses of Action Regarding Diablo Canyon P
64.
11/24/76 Memo to J. Stolz from D. Allison, Seismic Reevaluation of the Diablo Canyon Nuclear Poker Plant for Consideration at ACRS s..
-\\'
Committee's Meeting on November 13, 1976 (29p) 65 11/29/76 Memo to D. Allison from R. Hofmann, Regarding Telephone Call of November 16, 1976 to Dr. James Brune of the Scripps Institute of Oceanography (2p)
GE.
12/10/76 Memo to J. Stolz from D. Allison, Diablo Canyon Seismic Design Basis (7p) 67.
12/29/76 Memo to D. Allison from J. C. Stepp, Response to ACRS Consultants Recommendations Regarding the Diablo Canyon Review (3p) 68.
12/30/76 Summary of ACRS Meeting Concerning the Diablo Canyon Operating License Application (Sp) 69.
1/12/77 Summary of Meeting Held on January 5,1977, to Discuss Seismic Design Reevaluation of Diablo Canyon (6p)
Letter'to Mr. James F. Devine, U. S. Ceological Surve Re 70.
1/26/,77 to Review Documents Pertaining to the Jiablo. Canyon ( 5p) quest 71.
3/8/77 Memo to B. Rusche from J. O'Brien, Proposed Inte,rjm License for Diablo Canyon (SEB:1111) (2p) 72.
3/9/77 Hu.~ to W. Gammill from J. C. Stepp, Diablo Canyon Licensing Option (3p)
f-s
- 73.
3/14/77 Memo for J. C. Stepp from I.S. Sihweil, Diablo Canyon Site, Earthquake Occurence Probability Data (SEB:1111)(lp) 74.
3/24/77 Memo for D. Eisenhut from L. Shao, Diablo Canyon Status Report Updated on March 11,1977 (2p) 75.
3/28/77 Note to I. Sihweil and R. Bosnak, Diablo Canyon - Seismic Reevaluation of Outdoor Storage Tanks and Piping, Mechanical, and Electrical Equipment (13p) 76.
3/30/77 Memo for J. Stolz from D. Allison, Diablo Canyon - Seismic Design Reevaluation (13p) 77.
4/4/77 Meeting at Westinghouse Nuclear Energy Center, Monroeville,)
Pennsylvania on March 30 Concerning Seismic Reevaluation (lp
\\'
78.
4/26/77 Memo for H. Denton from W. Gammill, Status of Diablo Canyon Interrogatory Responses (2p) 79.
5/9/77 Memo for D. Eisenhut from L. Shao, Diablo Canyon Status Report
- Structural and Mechanical Reanalysis (1p)
P,0.
5/13/77 Summary of Meeting Held on February 4,1977-to.Di.scuss the Diablo Canyon Seismic Design Reevaluation (46p) 81 6/14/77 Summary of Meeting Held on April 29, 1977, to Discuss Diablo Canyon Seismic Design (Sp) 82 6/17/77 (2) g Memo for J. Stolz from D. Allison, Seismic Reevaluation of piablo Canyon (14p) 83 6/29/77
' hummary.of Meeting Held on May 3, 1977, to Discuss Diablo Canyon Seism'ic Design (7p) 84 6/29/77 Summary of Meeting Held on June 2, 1977, to Discuss Diablo Canyon Seismic Design (7p) 85 7/15/77 Summary of ACRS Sebcommittee Meeting on June 21,' June 22,
.M June 23,1977 to Discuss Diablo Canyon Seismic Design (6p) 55 7/18/77 Memo to J. Stolz from D. Allison, Diablo Canyon Seismic Design-Freedom of 'nformation (FOIA) Request - FOIA-77-48 (2p) 87.
7/28/77 Note to J. Stolz from D. Allison, Diablo Canyon Seismic Design - ACRS Consultant Comments (Sp)
L.
o.
88.
8/19/77 Memo to D. 8. Vassallo from J. P. Knight, Load Combinations for Seismic Reevaluation of Diablo Canyon Units 1 4 2 (1p) 89.
9/2/77 Memo to J. Stolz from R. J. Bosnak, Seismic Reevaluation of Diablo Canyon Site, Units 1 & 2 (4p) 90.
9/23/77 Memo to J. Stolz from D.. Allison,. Interim License Review -
Diablo Canyon Unit 1 (7p) 91.
10/4/77 Memo to J. Stolz from J. C. Stepp, Diablo Canyon Interim License Review Schedule (1p) 92 10/25/77 Memo to J. Stolz from D. Allison, Diablo Canyon Seismic Design (4p) 93 10/27/77 Memo to T. Novak, V. Beneroya, T. Ippolito, and F. Rosa from T/
R. J. Bosnak, Seismic Reevaluation Diablo Canyon Units 1 & 2 (17p) 94.
10/31/77 Note to File, Summary of Meeting Held on October 20-21, 1977, to Discuss Diablo Canyon Seismic Reevaluation (36p) 95 11/10/77 Summary of Meeting Held on November 3, 1977 to Discuss Status of Operating License Review (17p) 96.
12/01/77 Memo to T. McTiernan from E. Case, Justice Request Regarding Diablo Canyon-Project Manager's Chronology of Principle Events
- ~
for all Licensing Activities (66p) 97.
12/01/77 Summary of Meeting Held on November 10, 1977, to Discuss Diablo Canyon Seismic Design - Reactor Coolant System Fracture Mechanics Analysis (41p) 98 12/77 Memo to R. Bosnak from S. Israel, Equipment Needed to Achieve RHR Oppratin'g Conditions at Diablo Canyon (4p) 99.
12/2i/77 Memo to J. Stolz from D. Allison, Diablo Canyon Seismic -
Damping (17p) 100.
12/23/77 Summary of Meeting Held on November 11, 1977 to' discuss Diablo Canyon Seismic Design - Coabined Load Analysis of L ictor Coolant System (19p) 101.
2/16/78 Memo to J. Stolz from D. Allison, Diablo Canyon' Seismic Design ACRS Consultant Reports (32p) 102.
3/15/78 Memo to J. Stolz from D. Allison, Diablo Canyon Design ACRS ConsultantReports(ap)
a -
103. 3/21/78 Memo to J. Stolz from D. Allison, Diablo Canyon Informal Information (2 inches)est.450p 4
104. 3/29/78 Note to J. Knight, I. Sibweil, D. Jeng, R. Lipinski, P. Kuo, R. Bosnak, P. Chen, E. Sullivan, Diablo Canyon Seismic Design Criteria (31p) 105 4/10/78 Note from D. Allison, Diablo Canyon ACRS Subcommittee (1p) 106. 4/17/78 Memo to J. C. Stepp from R. McMullen, New Data on the San Miguelito Fault Zone Near Diablo Canyon (2p) 107, 5/1/78 Memo to W. Gammill from J. C. Stepp, Faulting North of Diablo Canyon Reported by James Davis (CDMG) (2p) s.
108. 5/3/7El Memo to D. Vassallo from W. Gammill, Faulting North of Diablo Canyon Reported by James Davis (CDMG)(3p) 109 5/8/78 Memo to J. Stolz from J. C. Stepp, Diablo Canyon Nuclear Power Plant Probabilistic Earthquake Hazard Study (4p) 110. 5/10/78 Memo to D. Vassallo from W. Gammill, CDMG' Report of Possible Faulting Near Diablo Canyon Nuclear. Power Plant (4p) 111 5/25F/78 Memo to T. McTiernan from E. Case, Results of Staff Interviews Regarding Diablo Canyon Review Requested by Department of Justice (4p) 112 6/6/78 Note from D. Allison, Diablo Canyon ACRS Subcommittee Meeting on June 14 and 15, 1978 (61_
113, 6/16/78 Memo to J.
C., Stepp from R. McMullen, Trip Report, May 3 and 4 1978 Examination of Faults Reported by the California Division of Mines and Geology Near the Diablo Canyon Nuclear Site (Sp) 114, 7/11/78 Memo to J. Stolz from D. Allison, Diablo Canyon Seismic Design (7ap) 115, 7/12/78 Memo to J. Stolz from D. Allison, Diablo Canyon S'ismic Design'(6p) e 116, 10/1G/70 Memo to J. Stolz from D. Allison, Diablo Canyon Informal Information(19p) 117. 10/24/78 Memo to J. Stolz from D. Allison, ACRS Consultant Report (9p) 118. 10/30/78 Memo to J. Stolz from D. Allison, Diablo Canyon Informal Information (17p) 119. 3/22/79 Memo' to G. Milho111n from R. Ireland, Seismic Issue at Diablo, Units 1 and 2 (4p)
120. 1/21/80 Memo to J. Stolz from R. Jackson, Recent Offshore Seismic Reflection Data and its Significance to Diablo Cany,on (Sp) 121. 2/11/80 Memo to S. Scott from S. Varga, Board Notification -
Information Item - Recent Offshore Seismic Reflection Data and its Significance to the Diablo Canyon (7p) 122.
3/22/82 Memo to R. Jackson from R. Rothman, Small Earthquake near Diablo Canyon, March 14,1982(1p) 123 3/14/83 Memo to J. Knight from R. Jackson, Diablo Canyon - Hosgri Fault Discovery Chronology (Sp) 124.
3/18/83 Memo from R. Jackson to J. Knight, Hosgri Fault Discovery Chronology (Sp) 3/
125.
8/30/83 Memo to R. Jackson from R. Rothman, California Earthquake of August 29,1983 (1 p) 126.
9/1/83 Memo to R. Jackson from R. Rothman, Additional Informatien on the California Earthquake of August 29,1983(2p) l 127.
3/30/84 Memo to 'J. Knight from R. Jackson, GSB Plan to Address the Proposed License Condition for Diablo Canyon (4p)'
128.
4/9/84 Memo to J. Knight from R. Jackson, Diablo Canyon Seismic License Condition (1p)
(
- 129, 4/12/84 Memo to G. Knighton from R. Jackson, Draft Seismic License Condition for Diablo Canyon (Sp) 130. '4/20/84 Memo to D. Matthews from R. Priebe, Diablo Canyon - Commission Order Regarding Consideration of Earthquakes and Emergency Planning (3p) 1 31.
S/1/84 Letter to Dr. S. T. Algermissen, U. S. Geological Survey Meeting with PG&E on May 8,1985, Bethesda, Mary, land (14p) 132.
5/7/84 Memo to G. Knighton from R. Jackson, Status of Draft Elements for the Ofablo Canyon License Condition (10p) i 133.
5/18/84 Memo to G. Knighton from H. Schierling, Summary of NRC Meeting with PG&E Regarding Revalidation Program for Seismic Design Bases (31p) 134.
5/21/84 Memo to J. Knight from R. Jackson, Preliminary Summary and Evaluation of Article Containing New Information or Inter-pretations of Faults in the Near Offshore of Central Coastal California (Including the HOSGRI Fault Near Diablo Canyon)(8p)
135. 9/18/84 Memo to J. Knight from S. Brocoum, Geosciences Branch Input fer Response to Letter from Jonathan McHugh to Chairman Palladino (1p) 135, 9/27/84 Letter to Mr. James F. Devin, U. S. Geological Survey, USGS's Role (7p) 137 10/17/84 Memo to G. Knighton from S. Brocoum, Summary of October 4, 1964 Meeting with PG&E Regarding Elements 1 & 2 of the Diablo Canyon License Seismic Condition (Sp) 1 38, 11/14/84 NRC Meeting with PG&E - Seismic Reevaluation Program for Diablo Canyon, October 4,1984 in Bethesda, Maryland (54p) 139. 11/15/84 Attendance Roster for Meeting Held on November 15, 1984,
\\'
Diablo Canyon Long Term Seismic Program (Sp) 140. 12/7/84 NRC Meeting Held on November 15 and 16, 1984 with Pacific Gas and Electric Company - Seismic Reevaluation Program for Diablo Canyon (6p) 141. 12/27/84 Meeting. Notice for January 10 and 11, 1984, to be Held in Bethesda, Maryland, to Discuss Seismic Reevaluation Program for Diablo Canyon (4p) 142. 1/7/85 NRC Meeting with Pacific Gas and Electric Company - Seismic Reevaluation Program for Diablo Canyon, December 11, 1984 in Bethesda, Maryland (51p) 143. 1/10/85 Attendance Roster for Meeting between PG&E/NRC, January 10,1985 (IP)
'14.4.
01/29/85 Summary of Meeting Held on January 10, 1985, PG&E and NRC Regardi'ng th'e Diablo Canyon Seismic Reevaluation Program (Sp) 145. 2/4/85 Memo from S. Brocoum to G. Knighton, Summary of January 10, 1985 Meeting (4p) 146 3/6/85 Letter to Mr. J. D. Shiffer, Vice President Nuc1' ear Power Generation, Pacific Gas and Electric Company, Summary of Meeting on January 10, 1985 (7p) 147, 3/21/85 Cover Sheet only--ACRS Subcommittee on Extreme Externe,1 Phenomena and Diablo Canyon Transcript, Culver City, CA (PDR Accession No. 8504040344) (lp) 148. 5/9/85 Meeting Notice of Meeting to be Held May 22 and 23, 1985, at Westinghouse Office, Bethesda, MD on the 22th and NRC Bethesda, M0 on 23rd, Long Term Seismic Program Plan (3p) 149, 5/9/85 Letter to Mr. J. D. Shiffer, Pacific Gas and Electric Company, NRC Staff Comments on PG&E's Long Term Seismic Program Plan, 1985 for Diablo Canyon (18p)
C' j
11 -
150.
5/22/85 Attendance Roster, W-Bethesda Licensing Operations, Long Term Seismic Program (2p) l 1 51.
6/18/85 Letter from Knighton to Shiffer, Seismic Reevaluation Program (7p) 152.
6/19/85 Memo to T. Novak from R. Bosnak, Responses to ACRS Question on Suitability of Level 1 PRA in the Diablo Canyon Seismic Reevaluation Program (20p) l 153.
6/19/85 MemotoT.NovakfromR.Bosnak,PacificGas&ElgPjc's r
Long Term Seismic Program Plan for Diablo Canyon 154.
7/10/85 Cover Sheet only--ACRS Subcommittee on Dia o) Canyon Plans Transcript (PDR Accession No. 8507120355)
P u
155.
7/5/65 View Graphs--NRR Pregentation--Diablo Canyon ACRS Subcommittee Meeting, 7/10/85 (10pi 156.
9/11/85 Memo to R. Bosnak from L. Reiter, Geological Reconnaissance of the Diablo Canyon Site and Region Attendance Roster for(71Mqeting between PG&E and NRC on Long Term Seismic Program P
I 0
e
k I
APPENDIX A FOIA 86-391 f
(DIABLO CANYON)
/
Dat'e Description 1
7/31/73 Memo to Karl R. Goller from William P. Gammill,) Acceptance Review of Diablo Canyon Units 1 & 2 (FSAR) (16p 2,
10/31/73 Summary of Site Visit and Meeting Held on October 25, 1973 to Discuss Questions Related to the Geology and Seismology of the Area (3p)
L.
3 1141/73 Memo to Joseph M. Hendrie from William P. Gammill,.Diablo Canyon - New Fault Reported by USGS Two Miles Offshore in the Vicinity of the Site (2p) 4 1/11/74 Summary of Meeting Held to Discuss Recent Offshore Explorations of USGS and PG&E(3p) 5.
1/23/74 Summary of Meeting Held with Potential Diablo Canyon Intervenors in San Luis Obispo, California (7p) r 3/1/74 Summary of Geology Related Site Visit and Meeting Held on 3
February 22, 1974 (3p) 7.
3/28/74 Letter to William Gammill from Department of Interior, Elmer H. Baltz, Preliminary Review of Aspects of Geologic Data Presented in the FSAR (4p)
's.
,5/2/74 Note tofR. C.' DeYoung from Thomas J. Hirons, Outstanding Items in the Diablo Canyon Safety Review (3p) 9*
5/15/74 Summary of Meeting Held with PG&E and USGS to Discuss Seismic Issues Related to the Diablo Canyon Units 1 and 2,(6p) 10 7/3/74 Note to L. Hanning Huntzing from A. Giambusso, Status Report on Selected Licensing Cases ending June 29,1974 (4p) 11*
7/11/74 Summary of Meeting Held on July 5, 1974 Regarding Offshore Faults (6p) 12, 7/16/74 Note to L. Hanning Huntzing from A. Giambusso, Status Report on Selected Licensing Cases ending July 13,1974 (2p) 13, 7/23/74 Note to L. Manning Muntzing from A. Giambusso, Status Report on Selected Licensing Cases ending July 20,1974 (2p) l
14, 7/29/74 Note to L. Manning Muntzing from A. Giambusso, Status Report on Selected Licensing Cases ending July 27, 1974 (2p) 15 9/6/74 Note to Edson G. Case from R. C. DeYoung, Status of the Geology and Seismology Portion of the Diablo Canyon Operating License Safety Review (7p) 16, 10/1/74 Note to L. Manning Muntzing from A. Giambusso, Status Report on Selected Licensing Cases ending September 27, 1974 (2p) 17 10/9/74 Note to L. Manning Muntzing from A. Giambusso, Status Report on Selected Licensing Cases ending October 5, 1974 (4p) 18*
Undated Note to L. Manning Muntzing from A. Giambusso, Status Report on Selected Licensing Cases ending October 12, 1974 (2p) s.
3s 19.
10/22/74 Note to L. Manning Huntzing from A. Giambusso, Status Report on Selected Licensing Cases ending October 19, 1974 (2p) 20.
10/30/74 Note to L. Manning Huntzing from A. Giambusso, Status Report on Selected Licensing Cases ending October 26, 1974 (2p) 21.
11/4/74 Note to'H. Denton, W. Gammill, C. Stepp, R..Hoffman, G. Hulman, and E. Hawkins, Geology-Seismology Report for Diablo Canyon (1p) 22.
12/23I74 Note to E. G. Case from R. C. DeYoung, USGS letter for Diablo Canyon for ACRS Subcommittee Meeting Scheduled for 1/28/75 (1p) 23 1/28/75 Letter to General L. Gossick from Department of Interior, Henry Cou11er, Review of the Geologic and Seismologic Data Relevant to Diablo Canyon (10p) 24 1/30/75 Memo to:R. C' DeYoung from H. Denton, Supplement to Safety Evaluatlun Report for Geology, Seismology and Foundation i
Engineering (15p) i 25 2/4/75 Flash Note to 0. Parr from D. Allison, Diablo Canyon Seismic Evaluation (1p) 26,
2/24/75 Memo to H. Denton from R. McMullen and J. C. Stepp, Meeting with the U.S. Geological Survey Regarding the Geology and Seismology of the Diablo Canyon Nuclear Site (3p) 27 2/24/75 Summary of Meeting Held on February 7, 1975 to Discuss Geology and Seismology of the Diablo Canyon Site (6p) 28 3/3/75 Memo to R. R. Maccary from L. C. Shao, Areas of Concern in Seismic Analysis and Design on Diablo Canyon (2p) l l
29 3/5/75 Summary of Meeting Held on March 3, 1975 with PG&E Management to Discuss Diablo Canyon Geologic and Seismic Issues (Sp) 30 3/12/75 Note to Lee V. Gossick from A. Giambusso, Status Report on Selected Licensing Cases ending March 8,1975 (2p) 31 3/13/75 Memo to F. Schroeder from H. Denton, USGS Release of the Offshore Data of Silver (Ip) 32.
3/18/75 Note to L. Gossick from A. Giambusso, Status Report on Selected Licensing Cases ending March 15,1975 (2p) 33.
3/18/75 Summary of ACRS Subcommittee Meeting Held on February 18-19, 1975(29p) 3/.\\1[h5 Memo to W. Gammill from R. B. Hofmann, Telephone Conversation 34 with Douglas Hamilton of Earth Science Associates (Consultants to PG&E Re:
Diablo Canyon Power Plant)(2p) 35 5/19/75 Memo to R. Maccary from J. Knight and L. C. Shao, Highlights of PG&E Diablo Canyon Plant Seismic Design Audit (45p) 35.
7/3/75 Memo to'A. Giambusso from R. C. DeYoung, Diablo. Canyon Interrogatories (8p) 37 10/24/75 Memo to R. C. DeYoung from H. Denton, Seismic Stability of Cut Slope (Sp) 38 10/30/75 Summary of Meeting with Pacific Gas and Electric Company to 3.i Discuss Forthcoming Geology / Seismology Submittal for Diablo Pg)
Canyon, Units 1 & 2 (OL) (8p)
{.,,
39 12/24/75.* -
Memo to:R. S! Boyd from O. Parr, Diablo Canyon Geology (1p) 40,
1/5/76 Memo to R. Boyd from R. C. DeYoung, Diablo Canyon Geology-Seismology Situation (Sp) 41.
1/7/76' Summary of Meeting Held on November 25, 1975 to discuss Recent Staff Questions on Gelogy, Seismology and Structural Engineering (3p) 42.
1/9/76 Memo to R. C. DeYoung from R. Maccary, Potential Earthquake Effects of the Hoagri Fault Zone, Diablo Canyon (3p) 43.
1/21/76 Memo to R. D. DeYoung from W. Gammill, Anticipated Meeting with Applicant -- USGS Geologic and Seismic Review (2p) 44 1/28/76 Memo to R. 5. Boyd from R. C. DeYoung, Meeting with Newmark, Hall, and USGS Concerning Diablo Canyon Seismic Design (7p)
~
.4
e 45.
2/2/76 Memo to R. S. Boyd from R. C. DeYoung, Supplement to the i
Minutes of the Meeting with Newmark, Hall, and USGS Concerning Diablo Canyon Seismic Design (3p) 46, 2/3/76 Note to H. Denton from J. C. Stepp, Current USGS Case Review Status and Problems (4p) l 47, 2/11/76 Summary of Meeting Held on Januar to Discuss Diablo Canyon Seismic Design (3p) y 13,1976 l
48, 2/11/76 Summary of Meeting Held on January 14, 1976 to Discuss Diablo Canyon Seismic Design (3p) 49*
2/17/76 Memo to 0. Parr fror D. Allison, Meeting with Dr. N. Newmark and W. Hall Concerning Diablo Canyon Seismic Design (2p) t
\\'
50, 3/4/76 Summary of Meeting Held on February 5, 1976 to Discuss Geology and Seismology of Diablo Canyon Site (7p) 51 3/26/76 Summary of March 23, 1976 Meeting with Newmark and USGS to j
Discuss Seismic Design of Diablo Canyon (3p) 52, 4/22/76 Memo to B. Rusche from R. S. Boyd, H. Denton, R. E. Heineman, Dr. N. M. Newmark's Review of the Diablo Canyori Seismic Design (14p) l Sa 5/10/76 Memo to W. Gammill from J. C. Stepp, Maccary')s Comments on LLL Report on Diablo Canyon Seismic Input ( p l
54, 5/18/76 Summary of Meeting Held on April 20 l
Reevaluation of Diablo Canyon (Sp),1976 to Discuss Seismic 6/7/76 Summary of ACRS Subcommittee Meeting Held on May 21, 1976 55,',
Regarding Di'ablo Canyon in Avila Beach Near San Luis Obispo, l
l California (6p) l 56 6/30/76 Summary of Meeting Held on June 10, 1976 to Discuss Seismic Design Reevaluation of Diablo Canyon (44p) 57 7/6/76 Summary of Meeting Held on June 23, 1976 to Discuss Canyon Seismic Design Reevaluation (3p) t l
50, 7/30/76 (2)
Summary of Advisory Committee on Reactor Safeguards (ACRS)
Subcommittee Meeting Concerning the Diablo Canyon 0)erating License Application in San Luis Obispo, California [4p) 59 8/25/76 Summary of Meeting Held on August 11, 1976 to Discuss Seismic Reevaluation of Diablo Canyon (42p) l
- ~
~
.~.
60.
9/14/76 Summary of Meeting Held on August 27, 1976 to Discuss Seismic Design Reevaluation (4p) 61.
9/17/76 Summary of Meeting Held on September 7, 1976 to Discuss Seismic Design Reevaluation (7p) 62.
10/19/76 Summary of Advisory Committee on Reactor Safeguards (ACRS)
Subcommittee Meeting (Sp)Concerning the Diablo Canyon Operating License Application 63.
11/24/76 Memo to H. Denton from R. 8. Hofmann, Recommendatio s Concerning Possible Courses of Action Regarding Diablo Canyon p) 64, 11/24/76 Memo to J. Stolz from D. Allison, Seismic Reevaluation of the Diablo Canyon Nuclear Power Plant for Consideration at ACRS
- s. -
. g e'
Committee's Meeting on November 13, 1976 (29p) 65 11/29/76 Memo to D. Allison from R. Hofmann, Regarding Telephone Call of November 16, 1976 to Dr. James Brune of the Scripps Institute of Oceanography (2p)
G6 12/10/76 Memo to J. Stolz from D. Allison, Diablo Canyon Seismic Desiga Basis (7p) 67, 12/29/76 Memo to D. Allison from J. C. Stepp, Response to ACRS Consultants Recommendations Regarding the Diablo Canyon Review (3p) 68, 12/30/76 Summary of ACRS Meeting Concerning the Diablo Canyon Operating License Application (Sp) 69.
1/12/77 Summary of Meeting Held on January 5,1977 Design Reevaluation of Diablo Canyon (6p), to Discuss Seismic
- i..
- 70. ' 1725/.77 Letter 'to Mr. James F. Devine, U. S. Geological Survey, Request to Review Documents Pertaining to the Diablo. Canyon (IS )
P 71.
3/8/77 Memo to 8. Rusche from J. O'Brien, Proposed Interjm License for Diablo Canyon (SE8:1111) (2p) 72.
3/9/77 Memo to W. Gammill from J. C. Stepp, Diablo Canyon Licensing Option (3p)
73.
3/14/77 Memo for J. C. Stepp from I.S. Sihwell, Diablo Canyon Site, Earthquake Occurence Probability Data (SEB:1111)(1p) 74.
3/24/77 Memo for D. Eisenhut from L. Shao, Diablo Canyon Status Report Updated on March 11,1977 (2p) 75.
3/28/77 Note to I. Sihweil and R. Bosnak, Diablo Canyon - Seismic Reevaluation of Outdoor Storage Tanks and Piping, Mechanical, and Electrical Equipment (13p) 76.
3/30/77 Memo for J. Stolz from D. Allison, Diablo Canyon - Seismic Design Reevaluation (13p) 77.
4/4/77 Meeting at Westinghouse Nuclear Energy Center, Monroeville'p)
Pennsylvania on March 30 Concerning Seismic Reevaluation (l y
78.
4/26/77 Memo for H. Denton from W. Gammill, Status of Diablo Canyon Interrogatory Responses (2p) 79, 5/9/77 Memo for D. Eisenhut from L. Shao, Diablo Canyon Status Report
- Structural and Mechanical Reanalysis (1p) 80.
5/18/77 Summary of Meeting Held on February.4, 1977 to Discuss the Diablo Canyon Seismic Design Reevaluation (46p) 81
- 6/14/77 Summary of Meeting Held on April 29, 1977, to Discuss Diablo Canyon Seismic Design (Sp) 82 6/17/77(2). Memo for J. Stolz from D. Allison, Seismic Reevaluation of piablo Canyon (14p)
D3 6/29/77
' lummary, of Meeting Held on May 3,1977, to Discuss Diablo Canyon Seismic Design (7p) 84.
6/29/77 Summary of Meeting Held on June 2, 1977, to Discuss Diablo Canyon Seismic Design (7p) 85 7/15/77 Summary of ACRS Subcommittee Meeting on June 21," June 22, and June 23, 1977 to Discuss Diablo Canyon Seismic Design (6p) as.
7/18/77 Memo to J. Stolz from D. Allison, Diablo Canyon Seismic Design-Freedom of Information (FOIA) Request - FOIA-77-48 (2p) 87.
7/28/77 Note to J. Stolz from D. Allison, Diablo Canyon Seismic Design - ACRS Consultant Comments (Sp)
- t. -
~
O,
88.
8/19/77 Memo to D. B. Vassallo from J. P. Knight, Load Combinations for Seismic Reevaluation of Diablo Canyon Units 1 & 2 (1p) 89 9/2/77 Memo to J. Stolz from R. J. Bosnak, Seismic Reevaluation of Diablo Canyon Site, Units 1 & 2 (4p) 90, 9/23/77 Memo to J. Stolz from D. Allison, Interim License Review -
Diablo Canyon Unit 1 (7p) 91 10/4/77 Memo to J. Stolz from J. C. Stepp, Diablo Canyon Interim License Review Schedule (1p) 92 10/25/77 Memo to J. Stolz from D. Allison, Diablo Canyon Seismic Design (4p) 93 10/27/77 Memo to T. Novak, V. Beneroya, T. Ippolito, and F. Rosa from T/
R. J. Bosnak, Seismic Reevaluation Diablo Canyon Units 1 & 2 (17p) 94.
10/31/77 Note to File, Summary of Meeting Held on October 20-21, 1977, to Discuss Diablo Canyon Seismic Reevaluation (36p) 95 11/10/77 Summary of Meeting Held on November 3, 1977 to Discuss Status of Operating License Review (17p)
~~
96 12/01/77 Memo to T. McT'iernan from E. Case, Justice Reques't Regarding Diablo Canyon-Project Manager's Chronology of Principle Events
- ~
for all Licensing Activities (66p) 97 12/01/77 Summary of Meeting Held on November 10, 1977, to Discuss Diablo Canyon Seismic Design - Reactor Coolant System Fracture Mechanics Analysis (41p) 93.
12/77 Memo to R. Bosnak from S. Israel, Equipment Needed to Achieve RHR Ope'ratin'g Conditions at Diablo Canyon (4p) 99.
12/21/77 Memo to J. Stolz from D. Allison, Diablo Cariyon Seismic -
Damping (17p)
- 100, 12/23/77 Summary of Meeting Held on November 11, 1977 to' discuss Diablo Canyon Seismic Design - Combined Load Analysis of Reactor Coolant System (19p) 101 2/16/78 Memo to J. Stolz from D. Allison, Diablo Canyon Seismic Design ACRS Consultant Reports (32p)
- 102, 3/15/78 Memo to J. Stolz from D. Allison, Diablo Canyon Design ACRS Consultant Reports (ap)
103. 3/21/78 Memo to J. Stolz from D. Allison, Diablo Canyon Informal Information (2 inches)est.450p 104. 3/29/78 Note to J. Knight, I. Sihweil, D. Jeng, R. Lipinski, P. Kuo, R. 80snak, P. Chen, E. Sullivan, Diablo Canyon Seismic Design Criteria (31p) 105 4/10/78 Note from D. Allison, Diablo Canyon ACRS Subcommittee (1p) 106. 4/17/78 Memo to J. C. Stepp from R. McMullen, New Data on the San Miguelito Fault Zone Near Diablo Canyon (2p) 107 5/1/78 Memo to W. Gamalli from J. C. Stepp, Faulting North of Diablo Canyon Reported by James Davis (CDMG) (2p) 103, 5/3/78 Memo to D. Vassallo from W. Gammill, Faulting North of Diablo Canyon Reported by James Davis (CDMG)(3p) 109, 5/8/78 Memo to J. Stolz from J. C. Stepp, Diablo Canyon Nuclear Power Plant Probabilistic Earthquake Hazard Study (4p) 110, 5/10/78 Memo to D. Vassallo from W. Gammill, CDMG' Report of Possible Faulting Near Diablo Canyon Nuclear. Power Plant (4p)
Ill. 5/25r/78 Memo to T. McTiernan from E. Case, Results of Staff Interviews Regarding Diablo Canyon Review Requested by Department of Justice (4p) 112, 6/6/78 Note from D. Allison, Diablo Canyon ACRS Subcommittee Meeting on June 14 and 15, 1978 (61_
113 6/16/78 Memo tc. J.
C., Stepp from R. McMullen, Trip Report, May 3 and 4 1978 Examination of Faults Reported by the California Division of Mines and Geology Near the Diablo Canyon Nuclear Site (Sp) 1.14 7/11/78 Memo to J. Stolz from D. Allison, Diablo Canyon Seismic Design (7ap) 115. 7/12/78 Memo to J. Stolz from D. Allison, Diablo Canyon '$eismic Design'(6p) 116. 10/16/78 Memo to J. Stolz from D. Allison, Diablo Canyon Informal Information(19p) 117, 10/24/78 Memo to J. Stolz from D. Allison, ACRS Consultant Report (9p) 118, 10/30/78 Memo to J. Stolz from D. Allison, Diablo Canyon Informal Information (17p) 119, 3/22/79 Memo to G. Milhollin from R. Ireland, Seismic Issue at Diablo, Units 1 and 2 (4p)
~
r.-
4,
120. 1/21/80 Memo to J. Stolz from R. Jackson, Recent Offshore Seismic Reflection Data and its Significance to Diablo Canyon (Sp) 121. 2/11/80 Memo to S. Scott from S. Varga, Board Notification -
Information Item - Recent Offshore Seismic Reflection Data and its Significance to the Diablo Canyon (7p) 122.
3/22/82 Memo to R. Jackson from R. Rothman, Small Earthquake near Diablo Canyon, March 14,1982(1p) 123 3/14/83 Memo to J. Knight from R. Jackson, Diablo Canyon - Hosgri Fault Discovery Chronology (Sp)
- 124, 3/18/83 Memo from R. Jackson to J. Knight, Hosgri Fault Discovery Chronology (5p) 4-3/
- 125, 8/30/83 Memo to R. Jackson from R. Rothman, California Earthquake of August 29, 1983(j }
p 126.
9/1/83 Memo to R. Jackson from R. Rothman, Additional Information on the California Earthquake of August 29,1983(2p)
- 127, 3/30/84 Memo to 'J. Knight from R. Jackson, GS8 Plan.to Address the Proposed License Condition for Diablo Canyon (4p)'
120.
4/9/84 Memo to J. Knight from R. Jackson, Diablo Canyon Seismic License Condition (lp)
- 129, 4/12/84 Memo to G. Knighton from R. Jackson, Draf t Seismic License Condition for Diablo Canyon (Sp) 130. '4/20/84 Memo to D. Matthews from R. Priebe. Diablo Canyon - Commission Order Regarding Consideration of Earthquakes and Emergency Planning (3p) 1 31.
5/1/84 Letter to Dr. S. T. Algermissen, U. S. Geological Survey, Meeting with PG&E on May 8, 1985, Bethesda, Mary. land (14p)
- 132, 5/7/84 Memo to G. Knighton from R. Jackson, Status of Draft Elements for the Diablo Canyon License Condition (10p)
- 133, 5/18/84 Memo to G. Knighton from H. Schierling, Summary of NRC Meeting with PG&E Regarding Revalidation Program for Seismic Design Bases (31 p)
- 134, 5/21/84 Memo to J. Knight from R. Jackson, Preliminary Summary and Evaluation of Article Containing New Information or Inter-pretations of Faults in the Near Of fshore of Central Coastal Callfornia (Including the HOSGRI Fault Near Diablo Canyon)(8p)
e.
135. 9/18/84 Memo to J. Knight from S. Brocoum, Geosciences Branch Input for Response to Letter from Jonathan McHugh to Chairman Palladino (Ip) 136. 9/27/84 Letter to Mr. James F. Devin, U. S. Geological Survey, USGS's Role (7p) 137 10/17/84 Memo to G. Knighton from S. Brocoum, Summary of October 4, 1984 Heeting with PG&E Regarding Elements 1 & 2 of the Diablo Canyon License Seismic Condition (Sp) 138. 11/14/84 NRC Meeting with PG&E - Seismic Reevaluation Program for Diablo Canyon, October 4,1984 in Bethesda, Maryland (54p) 139, 11/15/84 Attendance Roster for Meeting Held on November 15, 1984,
\\'
Diablo Canyon Long Term Seismic Program (Sp) 140. 12/7/84 NRC Meeting Held on November 15 and 16, 1984 with Pacific Gas and Electric Company - Seismic Reevaluation Program for Diablo Canyon (6p) 141. 12/27/84 Meeting. Notice for January 10 and 11,1984, to be Held in Bethesda, Maryland, to Discuss Seismic Reevaluation Program for Diablo Canyon (4p) 142. 1/7/85 NRC Meeting with Pacific Gas and Electric Company - Seismic Reevaluation Program for Diablo Canyon, December 11, 1984 in Bethesda, Maryland (51p) 143. 1/10/85 Attendance Roster for Meeting between PG&E/NRC, January 10,1985 (IP) 144. 01/29/85 Summary of Meeting Held on January 10, 1985, PG4E and NRC Regardi'ng th'e Diablo Canyon Seismic Reevaluation Program (Sp) 145. 2/4/85 Memo from S. Brocoum to G. Knighton, Sumary of January 10, 1985 Meeting (4p) 146 3/6/85 Letter to Mr. J. D. Shiffer, Vice President Nuc1' ear Power Generation, Pacific Gas and Electric Company, Summary of Meeting on January 10, 1985 (7p) 147. 3/21/85 Cover Sheet only--ACRS Subcommittee on Extreme External Phenomena and Diablo Canyon Transcript, Culver City, CA (PDR Accession No. 8504040344) (Ip) 148. 5/9/85 Meeting Notice of Meeting to be Held May 22 and 23, 1985, at Westinghouse Office, Bethesda, MD on the 22th and NRC Bethesda, M0 on 23rd, Long Term Seismic Program Plan (3p) 149, 5/9/85 Letter to Mr. J. D. Shif fer, Pacific Gas and Electric Company, NRC Staff Comments on PG&E's Long Term Seismic Program Plan, 1985 for Olab10 C.inyon (18p)
A 11 -
150.
5/22/85 Attendance Roster, W-Bethesda Licensing Operations, Long Term Seismic Program (2p) 1 1 51,
6/18/85 Letter from Knighton to Shiffer, Seismic Reevaluation Program (7p) 152.
6/19/85 Memo to T. Novak from R. Bosnak, Responses to ACRS Question on Suitability of Level 1 PRA in the Diablo Canyon Seismic Reevaluation Program (20p) 153.
6/19/85 Memo to T. Novak from R. Bosnak, Pacific Gas & Electr; c's Long Ters Seismic Program Plan for Diablo Canyon \\J2Pc 154.
7/10/85 Cover Sheet only--ACRS Subcommittee on Diah]o) Canyon Plans Transcript (PDR Accession No. 8507120355) UP w
155.
7/30/65 View Graphs--NRR Presentation--Diablo Canyon ACRS Subcommittee Meeting, 7/10/85 (10p) 156.
9/11/85 Memo to R. Bosnak from L. Reiter, Geological Reconnaissance of the Diablo Canyon Site and Region.h i Atten' dance Roster for heting between PG&E and NRC on Long Term Seismic, Program (7p) f