Summary of 770204 Meeting W/Util,Westinghouse & John Blume Assoc to Discuss Facility Seismic Design Reevaluation.List of Attendees & Rept on Spec for Seismic Review of Major Structure for 7.5M Hosgri Earthquake Encl
ML20212L048
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 05/18/1977
From: Allison D
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20150F500 List: ... further results
References
FOIA-86-391 NUDOCS 8608250178
Download: ML20212L048 (4)


Text

.

s 1

Docket Nos. 50-275 MAY 181977 and 50-323 APPLICANT: Pacific Gas & Electric Company (PG&E)

FACILITY:

Diablo Canyon Nuclear Power Station Units 1 S 2 (Diablo Canyon)

SUBJECT:

SUMMARY

OF MEETING HELD ON FEBRUARY 4, 1977 TO DISCUSS THE DIABLO CANYON SEISHIC DESIGN REEVALUATION We met with the applicant and its consultants on February 4.1977 to discuss the Diablo Canyon Seismic design reevaluation. A list of attendees is provided in Enclosure No. 1.

PG&E was conducting a reevaluation of the seismic capabilities of Diablo Canyon as had been requested by the NRC staff ir. Supplements 4 and 5 to the Safety Evaluation Report. The purpose of the meeting was to discuss a number of the methods and criteria that PG&E was proposing to use in the reevaluation.

PG&E presented a specification that described the methods and criteria proposed for use in reevaluating the major structures. These proposals

,_m:

were discussed and various changes were made to the specification during the meeting. At the conclusion of the meeting we indicated to PG&E that the proposed methods and criteria, as changed during the meeting, would be acceptable to the NRC staff. reflects the staff's understanding of the methods and criteria that were agreed upon.

"The-specification discussed above dealt only with the major structures.

l PG&E indicated that additional specifications, describing the criteria to be used for equipment, tanks, piping, etc. would be provided in the near future.

In addition, PG&E was working on responses to coments and questions from consultants to the Advisory Committee on Reactor Safeguards.

These comments and questions had been forwarded to the NRC staff with 8600200170 060001 I'

PDR FOIA HOUCH86-391 PDF v

/

2._

[

ac=xmo.m=c=

  • m.....- - -.....-... - -

p:oIA-b '59/

. A. - 10 n@

..A

(

2-MAY 181977 Pacific Gas & Electric Company memorandum dated December 20, 1976, from the Executive Director of the ACRS. PGSE briefly discussed the status of this work and indicated that they would respond to all of the coments and questions.

Origina: Signed By Dennis P. Allison Dennis P. Allison, Project Manager Light Water Reactors Branch No. 1 Division of Project Management

Enclosures:

1.

Attendance List 2.

Specification for Seismic Review of Major Structures for 7.5 M Hosgri Earthquake cc: See next page 6

t l

mM LWU b LR-f1 DAllison:klj JStok 5/)l/77 5//(/77 '

a NRC PORM Sta (p.74) NRCM 0240 Wv,e,,w....,,,,,,,,,,,,,,,,,,,,,,,,

.~.

=. -... =..

.'e4*.,

ggy i g 9977 cc: Pacific Jas and Electric Company Ms. Raye Fleming ATTN: Mr. John C. Morrissey 1746 Charro Street Vice President & General Counsel San Luis Obispo, California 93401 77 Beale Street San Francisco, California 94106 Mr. John Forster 985 Palm Street Philip A. Crane, Jr., Esq.

San Luis Obispo, California 93401 Pacific Gas and Electric Company 77 Beale Street Mr. William P. Cornwell San Francisco, California 94106 P. O. Box 453 Morro Bay, California 93442 Andrew J. Skaff, Esq.

California Public Utilities Commission Mr. James 0. Schuyler, Nuclear 350 McAllister Street Project Engineer San Francisco, California 94102 Pacific Ga's and Electric Company 77 Beale Street Mr. Frederick Eissler, President San Francisco, California 94106 Scenic Shoreline Preservation Conference, Inc.

Mrs. Thelma Hirdler 4623 More Mesa Drive 811 Fair Oaks Avenue Santa Barbara, California 93105 Arroyo Grande, California 93420 Ms. Elizabeth E. Apfelberg Mr. W. C. Gangloff 1514 Cazadero Westinghouse Electric Corporation San Luis Obispo, California 93401 P. O. Box 355 Pittsburgh, Pennsylvania 15230 Ms. Sandra A. Silver

)

5055 Radford Avenue Mr. Paul Morton North Hollywood, California 91607 California Division of liines and Geology Mr. Gordon A. Silver 28 Civic Center Plaza 5055 Radford Avenue Room 642 North Hollywood, California 91607 Santa Ana, California 92701 Paul C. Valentine 400 Channing Avenue Palo Alto, California 94301 Yale I. Jones. Esq.

100 Van Ness Avenue 19th Floor San Francisco, California 94102 James A. Geocaris Center for Law in the Public Interest 10203 Santa Monica Boulevard Los Angeles, California 90067

Enclosure No. 1 ATTENDANCE LIST DIABLO CANYON NUCLEAR FGWER STATION

~

MEETING HELD ON FEBRUARY 4, 1977 PG&E NRC STAFF J. Gormly D. Allison R. Bettinger A. Latoni J. Schuyler D. Jeng G. Blank I. Sihweil V. Ghio P. Kuo Al Schurman R. Hofmann M. Furbuck J. Knight G. Lenfestey L.D. Davis R. DeYoung*

Westinghouse J. Stolz*

W. Gangloff John Blume Associates (PG&E consultant)

J. Blume L. Edgar D. Ray R. Gallagher

~

  • Part time FbT A m '59I A -%D