Text

..

. December 3,1986 ,

Docket No. 50-313 LICENSEE: ARKANSAS POWER AND LIGHT COMPANY FOR ARKANSAS NUCLEAR ONE, UNIT 1

SUBJECT:

SUEMARY OF MEETING 0F NOVEMBFP 20, 1986, WITH AP&L CONCERNING THE WELD DEFECTS IDENTIFIED DURING THE ISI 0F "A" REACTOR COOLANT PUMP CASING Introduction At cur request the staff held a meeting with Arkansas Power and Light Company (AP&L) to identify the information which the staff needed to resolve the RCP casing weld flaw issue on "A" RCP and "E" RCP for Arkansas Nuclear One, Unit 1 (ANO-1) and to review the radiographs of the weld defects identified in "A" &

"B" RCP casings. The meeting was held at the AN0-1 site on November 20, 1986.

Enclosure 1 identifies the attendees of the meeting. In parallel and independent of this meeting, upon the licensee's request, the project manager allowed selected AP&L persornel to read a draft safety evaluation of the OTSG tube sleeving issue. Enclosure 2 is the draft SE of the OTSG tube sleeving issue which was made available for reading by the licensee.

Background

During the current refueling outage for ANO-1, Arkansas Power and Light Company disassembled and inspected "A" Reactor Loolant Pump in response to their commitment to perform inspections of the RCP shafts and impeller cap screws and torque pins. With the rotating assembly of the pump removed from the pump casing, the licensee performed the 10-year inservice inspection of the pump casing. Radiography of one vertical weld in the pump casing showed a weld defect about six inches long, which exceeded both fabrication and inservice acceptance standards. On comparing the radiograph with a computer enhancement of the original radiograph of this weld, the licensee determined that the weld defect has been in the pump casing since the initial operation. Further, the weld defect has not changed. The licensee has also reviewed a computer enhancement of the original radiograph of the welds of RCP "B" and discovered a defect. The ASFE Code does not address a situation such as described. The Code would assume that an unacceptable preservice defect would be removed. The Code specifies actions required for inservice discovered defects which include analyses of the weld defects and auomented inspection plans for the affected pumps and the other pumps. The licensee has submitted fracture mechanics analyses of the "A" and "B" pump weld defects, but did not identify the defects as inservice defects and thus did not propose additional action. The staff has indicated that the flaws must be considered inservice discovered flaws and the Code provisions followed for inservice identified flaws. The staff meeting with the licensee on November 20, 1986, was intended to view the radiographs and other techniques for examining the welds and to discuss what is further needed by the staff to resolve this issue before startup of ANO-1, which is currently planned for December 2, 1986.

8612150161 861203 3 PDR ADOCK 0500 P

o ,

Discussion The licensee was requested to submit on Monday November 24, a submittal which would include the following:

1. The UT techniques which were applied to "A" RCP
2. Supplements to the fracture mechanics analyses for "A" & "B" RCPs.
3. The UT techniques which were applied to "B" RCP
4. A discussion of what was done on the inspection of "A" & "B" RCPs.

S. Description of an augmented inspection plan for "A" RCP casing.

6. A request for relief from inspecting the "B" RCP casing as required by the ASME Code. The licensee will propose another method and schedule of inspecting the "B" RCP casing which would consist of UT or other techniques which would be acceptable for ISI examination without dissassembly of the pump.

The licensee submitted a letter on November 24, 1986, which covered the the issues discussed at the meeting of November 20, 1986 and can be used as a reference for this summary of the meeting.

The radiographs of the "A" RCP casing welds of the concerned area were reviewed and the staff confirmed the conclusions of the licensee concerning whether the flaws were preservice or inservice. The staff also reviewed the preservice radiographs of the "B" RCP casing weld in question and confirmed the conclusions of the licensee regarding this weld. The staff concluded that the licensee characterized the welds properly. The licensee did not grind smooth the area for UT examination since the weld areas had been ground and appeared to be smooth enough for good UT examination. Of 212 radiographs of RCP casing welds, the licensee examined 45 which previously showed indications or the density of the film indicated a need. The examinations consisted of computer enhanced techniques as was done on the welds of concern.

The staff requested a 100% computer enhancement of the "B" PCP casing welds.

The RCP casings were all static cast by Byron Jackson in their plant in New York.

The licensee determined that they needed relief from the requirements of the inspection of the "B" pump but would comply with the Code with regards to the requirements for "A" pump. A fracture mechanics analysis in compliance with the Code would be submitted for "B" pump weld defect. This was acceptable by the staff.

Guy S. Vissing, Project Manager PWR Project Directorate #6 Division of PWR Licensing - B

Enclosures:

As stated 08' P PWR#6 A D PWR#6 ng PWRf6[ kent CMcCrac GEdisonh DC u eld JStolz

&/, /86 j1/ / /86 W/y/86 ( ///86 ft/y/86

, __, , c .- -- - -

, m .-

7...,

,. . . . .c - m . 2 3.. . . ~ . _. . . . . . . . . . . . _

j -

> Mr. J. Ted Enos, Manager i

Nuclear Engineering and Licensing Arkansas Power & Light Company

,' P. O. Box 551 4 Little Rock, Arkansas 72203 i Mr. James M. Levine, Director Site Nuclear Operation's Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas 72801

'f Mr. Nicholas S. Reynolds

, Bishop, Liberman, Cook, Purcell & Reynolds

. 1200 Seventeenth Street, N.W.

Washington, D.C. 20036' s

Mr. Robert B. Borsum Babcock & Wilcox "

Fuclear Power Generation Division Suite 220, 7910 Woodmont Avenue '

Bethesda, Maryland 20814 Resident Inspector

. U.S. Nuclear Regulatory Commission P. O. Box 2090 Russellville, Arkansas 72801 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 i Arlington, Texas 76011

.; Mr. Frank Wilson, Director

\

Division of Environmental Health

.:' Protection Department of Health i Arkansas Department of Health 4815 West Markham Street Little Rock, Arkansas 72201

- Honorable William Abernathy il County Judge of Pope County

,1 Pope County Courthouse a! Russellville, Arkansas 72801 d

'l

.I i

e*, a -- e- y w e- .==7;g-yy 9 P-*wv4 **P "' tay _

-*3, ,

. '. .:.T."' . .

~ ~

, .'W

.' L,- -

.q- .

t.

Enclosure 1

NTTENDANCE LIST 6 FOR MEETING WITH ARKANSAS POWER & LIGHT

. /. CONCERNING RCP CASING WELD FLAW ISSUE 1; NOVEMBER 20, 1986 Name Organization Guy S. Vissing NRR/PWR-B/PBD#6 William J. Collins IE/DEPER

L. B. Marsh NRR/PWR-B/EB

, R. J. Wright NRR/PWR-B/EB

.; C. Y. Cheng NRR/PWR-B/EB

J. Ted Enos AP&L/Nuc Engr & lsng Rick Lane -

AP&L/AN0 Engineering Ray Peamey AP&L/ Welding Engineer j Ken Yoon B&W Nuclear Power Div.

William F. Jones B&W Nuclear Power Div.

J. F. Shepard B&W Nucleaf Power Div.

Sandy McGregor AN0 Engineering Services

' Mike Hocker B&W Kuclear Power Div.

. C. C. England ,

B&W SPIS

. J. E. Cavender Duke Power Company S. V. Weems MPR Associates L. D. Gilbert NRC RIV W. D.-Johnson NRC SRI Dan Howard AP&L/AN0 Sp. Projects George Woerner AP&L/ Nuclear Engr

. Dan Spond AP&L/L. Rock Rickie Cocanougher AP&L/ANO Sp. Projects 6

I

'N -l

.' I

. .6

')

y J

1.

.A

'l

.i

<Ml.

o

1 w=- v.= , -

_,-,-,--t, g t . .. _ . . . , . , . . . _ _ . . _ _ .  : .

.I J P.002 e,10V.20 '86 10:01 tlRC MESSAGE CEtliER BETHE5DA HD

tog \ UNITED STATES E % NUCLEAR REGULATORY COMMISSION 5 8 WASHING TON, D. C. 20665

,  % }

OfMFT

~

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION

~I SUPPORTING AMEN 0 MENT NO. TO FACILITY OPERATING LICENSE NO. OPR-51

- .f ARKANSAS P0kER AND LIGHT _ COMPANY

~

i ARKANSAS NUCLEAR ONE, UNIT NO. 1 DOCKET NO. 50-313 j

1.0 INTRODUCTION

By letter dated April 1,1986, Arkansas Power and Light Company (AP&L x

.' or the licensee) r,equested amendment to,the Technical Specifications .

(TSs) appended..t'o Facilit Nuclear One, Unit No.1 (y Operating ANO-1). License Supporting No. OPR-51 information was for Arkansas providad by <

q 1etters dated August 22, October 14 and October 23, 1986. The proposed i amendment would (1) allow the sleeving o.f steam generator tubts and (2)

. modify the designation of those areas identified as special groups in the steam gererators where imperfections have previously been found.

The licensee plans to conduct steam generator tube sleeving in ANO-1 prior to startup for Cycle 8 operation which is planned for early December 1986.

-

  • 2.0 BACKGR00N0 _

'l - As a result of degradation in the ANO-1 Once Through Steam Generators,

, (OTSGs) a substantial number of tubes with eddy current indications in excess of the 40% through-wall plugging limit have been removed from ser-vice. The suspected mechanism affecting<the tubes in the upper tube 4

sheet (UTS) region is intergranular attack (!GA) caused by concentrated chemical contaminants which have been carried by moisture in the steam q flowing up through the tube lane region. 1 The lane region is cooler than the surrounding area due to reduced heat l flux and flow resistance. Therefore, more moisture is in the steam in I this region. The contaminants carried by this moisture are deposited I

. in the upper tube sheet region. Plugging the tubes in the lane region  !

.j increases the area of reduced heat flux, thereby increasing the number of tubes affected by moisture in the steam. This aggravates the condi-tion by increasing the amount of contaminants carried by the steam and

'< deposited on the tubes in the UTS region.

4 To address this problem AP&L initiated a Steam Generator Integrity .

9 Program in 1983. The goal of this program is to identify and initiate changes which will assure that the existing OTSGs can be used for the N. l 4 life of the facility without increased risk to the health and safety of the public or reduction in the unit's perfomance.

One portion of this program is a steam Generator Sleeving Qualification (fggkry nya(wsmg r rem ved l

~

. , . \

1.y,.~. 2 -

. . . _ . . . -y -

_~ -

. _ _ . .. L

,, ..c ,

.. . .. .- ~ . , - . ~ " . .

't- .

ll0V.20 '06 10:02 NRC Nts5 AGE CElliER BETHE5DA ND P.003 a Program which would provide sufficient justification to a'llow a laroe-

] scale sleeving program at ANO-1. The installation of sleeves in the

affected tubes should decrease the lane region degradation rate by pre-

! venting additional loss of heat transfer area. In addition, the sleeve 1 material has better corrosion resistance than the original tubes. This

Qualification Program, which consists of the tests and analyses and

. .; development of general design criteria'for the Babcock & Wilcox (R&W)

OTSG sleeves, is contained in B&W report BAW-1823P. "Once-Through Steam Generator Mechanical. Sleeve Qualification." Our evaluation of this report (Reference 2) which included the following areas, was completed in November 1984.

-5 1. Leak-tight integrity

2. Pullout strength of sleeves j 3. Joint expansion tests

- 4. Flow-induced vibration effects

5. Effec (Efsleeveinstallation'on.adjacentsleeves
6. Thema1/ hydraulic effects of s1eeving .

3

7. Structural and functional integrity of sleeves and compliance with ASME Code requi.rements , , ,

Based on this review, staff found the licensee's sleeve / tube qualifica-tion program acceptable for a proposed demonstration sleeving of ten

~

tubes at ANO-1. However, additional tests were recomended prior to approval of large scale sleeving. These additional ' tests were reported by the licensee in the present submittal (Reference 1) and are addressed in this evaluation. The licensee has also included B&W Report

BAW-1832P. reviewed earlier as stated above, with the present submittal.

3.0 EVALUATION

, 3.1 Effect Of Corrosion On The Sleeved Joint

$ Corrosion propagation during normal operation due to increased a residual stress and during wet lay-up were investigated on a mechan-ically sleeved ANO-1 0TSG tube.

To perfom this test, a specimen was fabricated from a portion of a tube pulled from the ANO-1 B-0TSG in January 1983 on which IGA was observed. The specimen was fabricated using the process developed 1 for field installation. The specimen was exposed in an autoclave at i

O approximately t to an environment that contains L the typical feedwater contaminants concentrations. A tensile load of -

i approximately C ' i and an internal pressure of about (~

4 l

was placed on the expanded joint for the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> duratinn of the

']; test. Upon completion of this phase of the test, one of the two expanded joints was removed for metallurgical examination while the j' other joint was replaced in the autoclave in wet lay-up conditions i for 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />. This joint was then removed from the autoclave and l metallurgically examined with a scanning electron microscope for

) evidence that the existing IGA had not progressed during the testing,

[E ~Q  ? V'- s

, o . - -

u, .

, . . . _ . . ,* .. . . _ . . , . . s.u _

. - . . . a N O9. ?) n 10: 0 ': hF.i. Pi:.;.; 165. i. E h i E E BE I HE 5DS ND F' UO4 i

Examination of test specimens showed that the depttf of IGA in spect-mens removed from the autoclave for operational and wet lay-up

! simulation was the same as was found in the specimens prior to the mi test. This test in conjunction with infonnation previously reported,

,i shows that corrosion propagation is not Itkely to increase signifi-l cantly in the rolled .foint during nonnal operation and wet lay-up.

i Other slower corrosion mechanisms such as corrosion due to cyclic

- J stresses are not likely to be aggravated by the sleeving process.

The ten demonstrated sleeves installed earlier will be monitored closely to provide an advance warning of possible corrosion propa-gation due to unforeseen mechanisms.

k Additional data on the effects of roller expanding sleeves inside OTSG tubes affected by intergranular corrosion on the outer surface was obtained by B&W on contract to AP&L. The ANO-1 tube samples, each C_ - ~ __, were cut from a previously pulled ANO-1 tube.

The samples were obtained from a portion of the tube'adiacent to an area knowneto have IGA p. resent, on the outer tube surface. y The inner surfaces of.the tube samples were chemically decontaminated to eliminate the need for rollina under het cell conditions. 1. 1 t . i and the IGA categorized'for post rolling comparisons. Upon completion of the tube C- decontamination, a sleeve was

roll expanded into each tube sample to the maximum qualified expansion. The tube samples were examined by eddy current testing (ETC),diametermeasurements,metallographyandscanningelectron microscopy both prior to and after roller expanding a' sleeve to characterize the effects of sleeve installation on existing IGA.

f2 *

.. The data ehtained fTom this test served as the baseline for comparison to the cor-i '

rosion test discussed earlier.

e l In addition to these B&W corrosion tests. Westinghouse also per-i formed tests for AP&L on actual ANO-1 tubing to determine the effects of two different types of sleeving processes. To accom-i plish this, a detailed characterization of the existing conditions was perfonned on tubing removed from the ANO-1 OTSGs. The char-i acterization included non-destructive examinations (NDE), analysis

.j of C- __ deposits, microexamination and sensitization

testing. Sleevin in braze processes. The g was then performed mechanical process used usingbyboth mechanical and Westinghouse, although not exactly like that used by B&W, is very similar. After

. each step in the sleeving process, the outer surface of the tube was i,l examined and photographed. From their observation, it was determined ,

1 that the sleeving process did not widen any IGA areas. such as to

} make them detectable by eddy current, radiography, or visual t inspection.

).

! Residual stress measurements detennined by L -.. ..

. testing, 1 were perfonned on Westinghouse brated sleeves and on Westinghouse 1 mechanically expanded sleeves using ANO-1 OTSG tubing. It was a;

r

-}

d gi

. . , , . .. ..m -

, -- - - _v#

m

. . ..~ .. x . . . . . . .. - . . .

.,. : . . . - . -. s......

- ~

NOV.20 '86 10:03 HRC Heli.n E CENTER BETHE5('A HC' P.005

-4~

  • .. p s verified that the tube i i residual ' stresses from Ll roller expansion and brazing process are significantly low and are y considered acceptable for a sleeve design.

1 3.2 Sleeves Installed on Degraded Tubes n

] -

-'!l The licensee perfomed tests to ditemine whether mechanical sleeves installed in the free span of OTSG tubes which have as much as 4 ~

degradations have a reasonable chance of satisfying the qualification program requirements for strength and leak tightness.

i This was a simplified test which used OTSG tube specimens which

- had been machined to 0 .-

~ 1 to represent tubing with /.. .

IGA. Two high yield f- ._

f . tubes were each sleeved by rolling (-

i 1ncrementaY axial loads while' the joint slippagewere 7 in the free span and thd assemblies sub.iected to and leakage under c j 1600 psi internal pressure were measured.

1 i Ultimate failure of the first of thE twn specimens test 4d' occurred in the thin portion of the tube.at T ~ .. This indicates that the sleeve joint is stronger than the tube and both can withstand the maximum #ual load of / . which wnuld result from accident conditions. The second specimen did not fail at an axial load of

- L '., but was not pulled to failure.

~

The first specimen had a maximum leakage nf F .

at normal operating conditions. Ten thousand of these joints would total

.__._2, less than D of the 1.0 gpm Technical Specification Ifmit. At accident conditions the leakage would increase to about C 1 of the Technical Specification limit.

- The leakage from the second specimen was unusually high at a nomal operating conditions, decreased and then increased at accident loads. The roll in this specimen was found to be defective and the data from this specimen was disregarded.

3.3 Inspectability and Plugging 1.imit for Sleeves

.I Even with the state-of-the-art ECT techniques, the inspection of 4 the rolled transition zones where the sleeve / tube joints are made 1

j gj and the parent tubes at the sleeve's lower end, is difficult. The ability to detect f~. through-wall defects in all regions of the sleeve and parent tube has been demonstrated usino er.isting ECT j,1 techniques. The ability to detectI . through-wall penetrations has been demonstrated for all regions of the sleeve / tube combination i

with the exception of the tube at the sleeve end. The large signal

,1 produced by the inner diameter transitinn at the end of the sleeve masks the signal for the C~. through-wall tube inspection.

j F W)P N *, --Y" -*

r**M**

?"J*--*14*F* M-

  • ~.-*T-*_e'w'r_*'Q

.- . - . . . ~ . .

a. . . . . .

~

160. .:0 St 10: 04 tiRC Nd;.:.n.n. . .ENIER BEiriE$Uri IR*  ?.00o 5- pO j The licensee perfomed calculations to detemine the minimum acceptable wall thickness for degraded sl.eeves (ReferencaJ). x i They have proposed a plugging limit of 40% for both tubes and

'I sleeves. Staff has reviewed these calculations and finds the 40%

j limit acceptable for all' defects with the exception of circum-

., ferential cracks.

,, The minimum acceptable wall thickness for degraded sleeves was

i. determined in accordance with the allowable stress and pressure ,

limits of ASME Section !!! and NRC Regulatory Guide 1.121.

Primary membrane stress, burst pressure, and fatigue analyses were considered for nomal operation. .and primary membrane stress, burst pressure, collapse pressure, and primary membrane plus bending stresses were considered for postulated accid'nt e condi-g tions. In addition, primary plus themal stresses were evaluated.
  • sleeve wall thickness was calculated for these eight
The minimup'cceptance criteria',' For the expected type of defects, different'a y the limiting required minimum wall was found to be 0.0131 inch.
.This thickness is necessary to resist collapse under the external pressure resulting from a LOCA and fepresents 30% of the'briginal
7. Thus..,a .~i or greater through-wall defect would regire that a sleeve be removed from service. This

{

compared to a t defect limit for the OTSG tubes. It is to be

noted that allowances for ECT uncertainty and possible tube degra-dation between ins)sctions have to be incorporated into these

. values to obtain tie plugging limit specified in the Technical Specifications.

The sleeve must be bent and straightened for installation in the outennost OTSG tubes. This results in a slightly elliptical cross l

. section, which was evaluated for buckling pressure. The maximum l : expected ovality (i.e.. difference in extreme 00s at any one I. ! crosssection)wasfoundtobet- .' based on sample dimen-3 1 ; sions. The critical external pressure depends on the material l '

yield strength. For material with yield strength of i_ r,

the critical external pressure is C. . f for the sleeve and I

' i about

  • for the tee, times indicating the external that the pressure of sleeve the tube. can sustain Under the j maximum secondary pressure of t_ _ __

with no primary pressure.

neither tube nor sleeve would collapse. In the event water gets

! ]i trapped between the OTS6 sleeve and tube, the sleeve would become 4 more elliptical or distort into a L . ' cross section with each

j -

successive heatup to acconinodate the increased water volume.

Continued one-way leakage, although unlikely, would eventually

. leave the sleeve subject to collapse in the event of a sudden loss

. of primary pressure such as a LOCA. However, the annular pressure j increase is more likely to blow out the corrosion products which

^q plugged the leak than to collapse the sleeve. Thus, the likelihood

- of sleeve collapse is very small.

l n.~~n : 1_-_ :wn cr ~~ .m .m. - - -

- - - - , = - - w -

_ .~ ._

n. '

, fiUV. 'U n 10:05 flRC ;;i;.;.w.:E CEliiER BEinEWi @ P.007 -

i .

j _-

1 ,

  • 0" lIl2 3 The reduced section modulus of the expanded region has only a minor impact (i i the minimum wall thickness requirement l from 7 for the unexpanded sleeve to C- for the roller expanded portion of the sleeve for the accident loads associated with a

. Main Feedwater Line Break plus. Safe Shutdown Earthouake). The

, analysis shows the minimum wall thicknesses necessary to resist

., i collapse under the external pressure resulting from a LOCA

..~

(limiting event) are t' I for the unexpanded portion of the sleeve and i' for the roller expanded portion of the sleeve.

i Both of these values correspond to a t ' through-wall defect.

/,

f The sleeve wall thickness required to satisfy the primary plus themal stresses during postulated accident conditions also m results in a sleeve wall thickness requirement of about 30%

wall thickness for all defects except circumferential cracks.

j To account for themal loads, defect limits were based on B&W 4 tensile tests *(Reference 4) in whicti tube specimens with i machined de'fects were pulled to failure by tensile fracture. ,

s' Staff evaluation of this test data indicates that defects

~

.. j including axial cracks t through-wall would satisfy the acceptance criteria. flowever, circ 0mferential cracks 71.**

/ in extent and of the same depth might result in tube failure.

In fact, much shallower circumfelential cracks fail to meet the e

criteria. In addition, there is a greater propensity for crack 4 propagation and tube failure due to flow-induced vibration in 1 this region, For these reasons _and due to the uncertainties in sizing defects between t .,in the entire sleeve / parent tube region as discussed earlier, the staff has taken the position that detection of any circumferential crack in the sleeves would

require plugging of tubes. While the licensee's submittal dnes not i explicitly state this, it is.our understanding based on telephnne ~,

conversations with the licensee that all tubes / sleeves with cir-l', cumferential cracks will be plugged."

3.4 Impact Of Sleeving On The ANO-1 FSAR Safety _ Analyses The licensee (AP&t.) has reviewed the impact on the ANO-1 FSAR safety analyses of sleeving 5,000 tubes per steam generator. The sleeving results in a slight reduction in heat transfer due to the air gap a

between the sleeve and the steam gener'ator tube. There is also a y small increase in the primary side pressure drop through the steam-I generator due to the smaller tube diameters in the sleeved tubes.

i Analysis by AP&L has also shown that the effect of installing 5,000 l sleeves in each generator would be a reduction in steam superheat .

temperature of approximately 7.7'F at full power and a reduction in s j primary flow of less than 1%. This reduction in superheat requires

an additional 1% full feedwater flow in order to remove the same

.; amount of primary energy.

o X For overcooling events, the FSAR analysis assumed that the feedwater flow increased during the event in order to conservatively

!i L

-. --n 1 . m, m s . - . , - - , -

& *' - - --+ ' . .  ;. , _ _ ,

, g

.. ' H0V.20 '8610:06 ilRC l1E55 AGE CEMER BETHESDR l1D P.008

- y increase the heat removal by the steam generator. Therefore, sleeving does not impact the safety analysis since the heat removal due to a 1% increase in feedwater flow is conservatively bounded by a; the heat removal rates assumed in the analysis of overcooling events. -

g.

For some overheating events such as the loss of main feedwater, the FSAR analysis assumed that the heat transfer in the steam generator is significantly reduced. The slight reduction in heat transfer coefficient along the sleeved tubes is much smaller than the reduction assumed in the FSAR analysis and, therefore, does not impact the analysis assumptions. Other overheating events which are initiated in the primary system, such as the control rod withdrawal event, are not affected by sleeving since the initial heat transfer 2 rate is held constant throughout the avant and overall total steady -

state steam generator heat transfer is unaffected by tube sleeving.

.J Previous 6tieric evaluations of the effect of steam generator tube

  • plugging have shown that there is a negligible impact on LOCA
  • 5. results due to a 2.5% reduction in RCS flow. The licensee has indicated that a similar magnitude if tube sleeving woul'd. result in only a 15 reduction in RCS flow. Therefore, the generic LOCA analysis accounting for tube pl6gging conservatively bounds that which accounts for tube sleeving. The licensee has also specifically considered the concern of steam binding in the steam generator affecting the reflood phase of the large break LOCA and

. has found.no impact due to tube sleeving.

Plant procedures require AP&L to measure primary system flow at the beginning cf each fuel cycle to verify that the actual flow is in excess of that assumed in the plant safety analyses. These procedures also contain surveillance requirements to monitor primary flow several times per day. ' Therefore, any flow degradation due to sle,sving would be detected to ensure that the existing plant #

safety analyses remain valid and bounding.

3.5 Conclusions Review of the additional corrosion tests'perfonned by the licensee shows that corrosion propagation is not likely to increase

"! significantly in the rolled sleeve joint during normal operation a.nd 14 wet lay-up. Other slower corrosion mechanisms such as corrosion due

.d to cyclic stresses are also not likely to be aggravated by the

j sleeving process. The tube residual 00 stresses from rolled expansion

,- and brazing process are low and are considered acceptable for a sleeve design.

The results of the licensee analysis indicate that the minimum required sleeve wall for nomal and accident conditions is L ---

I inch which perinits sleeve defects less than ( ~ ' through-wall.

H Licensee analysis is in compliance with the requirements of ASME 9 . Code Section !!! and NRC Regulatory guide 1.121. Allowing an d

x j_- k \*

L] - .. _ . . _ . ... . ' i. .1.. 2 .w. . . . . . _ u._ _

. .NOV.20 '86 10:0 M RC ME55 AGE TENTER BET _HE5DA C P.009 f

h additional margin of 10% for continued degradation and 20% for uncertainty in eddy current measurements, the licensee's proposed 40% plugging limit for sleeves is acceptable for all defects with the exception of circumferential cracks. Any detectable circumferential crack in the tube / sleeve region would require

q. ; plugging of the tube.

Based on a review of the results of the supplemental corrosion I

tests, sleeve plugging analyses and the sleeve tube qualification program reviewed earlier, the staff finds sufficient justification to allow a large scale sleeving program at AN0-1.

r Based on the above evaluations, the themal-hydraulic effects of sleeving up to 5,000 ANO-1 steam generator tubes with180-inch lofig i sleeves per generator will have a minimal and acceptable effect on plant operation and the existing FSAR safety analyses will continue to bound normal and abnomal plant conditions.

.s j

4.0 ENVIRONMENTAL CONSIDERATION

This amendment involves a change in the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20.

We have determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase I in individual or cumulative occupational radiation exposure. The l Comission has previously issued a proposed finding that this amendment .

involves no significant hazards consideration and there has been no '

public comment on such finding. Accordingly, this amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment. 3

5.0 CONCLUSION

ll We have concluded, based on the considerations discussed above, that: i l' (1) there is reasonable assurance that the hehlth and safety of the l.* public will not be endangered by operation in the proposed manner, and i, (2) such activities will be conducted in compliance with the Commission's

-lc regulations and the issuance of this amendment will not be inimical to j the comon defense and security or to the health and safety of the public. I J: 1 Dated:

'l Principal Contributors: J. Rajan, G. Vissing, L. Kopp , i l

,a-

  • j.

i i  !

,' l n== . ..

- - . ~~-

7. .

t Iwe.;u s t. Ic:o, tv>. n:::ne: > ; : : t .- 0 :. n : 2..

,s

~~

-- .g. l

, REFERENCES

1. Letter from T. Gene Campbell, AP&L, to J. F. Stolz, NRC, reauesting

, Technical Specification change to allow steam generator tube sleevinc.

, dated April 1,1986.

?. Letter from John F. Stolz, NRC, transmitting Amendment No. 86 to Facility Operating License No. DPP-51 for Arkansas Nuclear One, Unit 1, to Mr.

John M. Griffin, AP&L, dated November 3, 1984

3. 8tW Report 32-1147602-02 "177 OTSG Tube / Sleeve Loads," in support of the
. 40% plugging criteria submitted as attachment to letter from J. Ted Enos, AP8L, to J. F. Stolz, NRC, dated October 14, 1986. -
4. Letter from J. Ted.Enos AP&L to J. F. $$olz, NRC, dated Octcher 23, 1986, including Attachment 1 (Ruptu.re Test Data of Damaged Alloy 600 OTSG Tubing), and Attachment 2 (Collapse Test Data on Damaged Alloy 600 OTSG Tubing).
5. Letter from T. Gene Campbell, AP&L to J. F. Stolz, NRC, transmitting

, safety review regarding the accident analyses of the FSAR.

1 e

h zi 1

1 I

i 1

'i'

'i i

i

_2 v _ 1 _.. . . __ _P 'r. -,.o <" = 7 0. , " - ^ - - -

.m - F -, -'T-- ~----*r---- Ir.)

. .. ..~' . .'. .:

MEETING SUVMARY DISTRIBUTION k[ _

([) f

Licensee: Arkansas Power & Light Company

  • Copies also sent to those people on service (cc) list for subject plant (s).

Docket File NRC & L PDRs Rdg File JStolz GVissirg CMcCracken GEdison OGC

, EJordan BGrimes JPartlow

FSchroeder FMiraglia WCollins

  • LBMarsh RWright CYCheng
LDGilbert WDJohnson b

5 l:

'.i l!

l l,f 6

4 r,

,,. _ . . - .. . _ . . ,