I

'7

'o UNITED STATES

! } ).r. (,j NUCLEAR REGULATORY COMMISSION e

/

"' /. p WASHINGTON, D. C. 20555 h

.~,.s

$$I2 o

1 1983 NOTE T0: Hans Schierling FROM:

James P. Knight, A/D CSE, DE Attached is a specific list of the information that we will need in order to conduct a meaningful audit on October 25-27, 1983, regarding the various allegations received in the course of the Diablo Canyon review. Also included under Item B on this list is a list of information to be audited in relation to open items.in SSER Nos. 18 and 19.

It is our intent that these lists be telefaxed to PG&E so that the first package of information (Item A) will be on the table ready for us to proceed at 9:00 a.m. Tuesday, October 25.

~

James P. Knight, Assistant Ofrector f

for Components & Structures Engineering Divi,s' ion of Engineering cc:

R. Vollmer D. Eisenhut T. Novak G. Knighton P. Kuo H. Polk M. Hartzman

,2 7 k 3 e

i Jt'y r

m INO q 3,L6,66(i

t Information Requested for NRC Audit of October 25-27, 1983 A.

Requested as available for immediate review at 9:00 a.m. Tuesday October 25, 1983 (through Thursday October 27,1983) 1.

A list of computer programs used for the Diablo Canyon reverification program.

2.

Documentation and verification of computer program CE 217.

3.

Calculations for the dynamic model of the containment exteri,+

shell. This includes the mass and stiffness calculations of the containment dome, shell and foundation.

4.

Deconvolution calculations for the containment - inputs (soil / rock properties) model, and computer printouts (for DE and DDE analyses' 5.

Calculations on soil-structure interaction model for containment and inputs (for DE and DDE analyses).

6.

Computer printout for DE and DDE containment exterior shell analysis.

7.

Gereral description on design methods and codes used for containment penetrations and connections.

Typical calculations for inserts and attachment-to containment shell and to the liner plate (two each).

8.

Mass and stiffness calculations for the annulus structure of dynamic model (vertical and horizontal).

9.

Drawings showing all modifications to the containment annulus structure (including shop orawings).

10. Dynamic models of the annulus structure (vertical and horizontal).
11. Computer printouts on vertical seismic response of the annulus structure.
12. Computer printouts on horizontal frequency evaluation of annulus floors.
13. Stress combination evaluations of structural members in the annulus structure, 14 Calculations ated to select critical members for containment i

annulus structtn..

I

15. Stress combinatian calculations for built-up and composite members I

in the annulus structures.

t B.

Requested as available - Tentative 2 p.m. Tuesday October 25, 1983 through Thursday, October 27, 1983.

1.

Design Manual DCM C-54, " Structural Evaluation of Pipe Whip Restraints Outside Containment".

2.

Design Manual DCM C-64 " Design of Rupture Restraints Inside Containment" 3.

a.

Completion report of PGE Open Item 39.

b.

Test data for design of crushable bumpers.

4.

Representative design packages of rupture restraints and crushable bumpers inside containment.

5.

List of essential systems or portions of systems

a. targets on these systems, piping and equipment
b. sources for these targets
c. Specific information on 54 + 68 civil / structural cases and 48 piping cases which were not required or did not have analyses or reviews.

(Listed in PGE respense of 10-12-83 to SSER open items 29 on jet impingement).

6.

Table of piping and conduit threshold pressures.

7.

a.

Design Manual DCM M-65 Rev. 1 " Jet Impingement Analysis Criteria for Inside Containment" b.

Document MEP, Rev. O " Engineering Procedure for the Analysis of Jet Impingement Effects Inside Containment" 8.

Sample calculations for linear support buckling.

l 1

l i

C0ff1ISSION BRIEFING OCTOBER 28, 1983 OUTLINE 1

e BACKGROUND e

DESIGN VERIFICATION PROGRAM STATUS (STAFF & IDVP) e PGE/ PLANT STATUS / SCHEDULE e

ALLEGATI0tlS e

FUEL LOAD READINESS 1

I SLIDE 1 OgTOBER 20, 1903 l

D ISENHUT l

'/

Y

i BACKGP.0UND SSER-18 (AusuST 5,1983) e 1

PRESENTED STAFF EVALUATION OF IDVP AND ITP (STEPS 1, 2 AND 3)

IDENTIFIED OPEN ITEMS, INCOMPLETE EFFORT, AllD NEED FOR FURTHER DOCUMENTATION e

SECY 83-366 (SEPTEMBER 13, 1983 COMfilSSION MEETING) 4 DISCUSSED AT SEPTEf1BER 13, 1983 COMMISSION MEETING ACKNOWLEDGED OPEN ISSUES PRESENTED STAFF EVALUATION, CONCLUSIONS, AND REC 0fflENDATION e

COMMISSION MEETING (SEPTEMBER 27, 1983)

IDENTIFIED 30 SPECIFIC OPEN ITEMS:

14 FOR STEP 1 13 FOR STEP 2 3 FOR STEP 3 PRESENTED PGaE PLANT STATUS AND SCHEDULE i

SLIbE2 QCTQBER 28, 1983 -

U.

ISENHuT f

,_4

-_..,___.-.,.,__.-,__,_-,,__..-__-,__.____._.,__m_,,.,,____._-_._.,_,..,,,,__-,,...,__,_,.,,,.r.___.-____,__,..

l STAFF EVALUATION e

SSER-19 (0CTOBER 14,1983)

SPECIFICALLY DIRECTED TO FUEL LOAD ISSUES LISTS.0THER OPEN ITEMS STAFF CONCLUSION:

ALL ITEMS FOR FUEL LOAD DECISION RESOLVED (6 ITEMS REQUIRE SOME

. FOLLOWUP VERIFICATION WORK) t SLIDE 3 OCTOBER 28, 1933 D. EISENHUT

1 DESIGN VERIFICATION PROGRAM STATUS e

Illyf ALL ITR'S AND PIVISIONS SUBMITTED IDVP FINAL REPORT COMPLETE IDVP EFFORT COMPLETE e

NRC STAFF ALL FUEL LOAD OPEN ITEMS RESOLVED 0 PEN ITEMS REQUIRED FOR STEP 2 (13) AND STEP 3 (3) IDENTIFIED REVIEW 0F IDVP REPORTS COMPLETE FOR FUEL LOAD (SSER 19)

FUTURE SSER NILL ADDRESS ALL REMAINING ISSUES (STEP 2 AND 3) INCLUDING FOLLOWUP FROM STEP 1 SLIDE 4 OcTgsEn 28, 1983 D. t!SENHUT l

l

PGE STATUS / SCHEDULE

~

e FUEL LOAD M0DIFICATIONS COMPLETE OCTOBER 28 INSIDE CONTAINMENT e

SECURITY PLAN IN EFFECT (PLUS 30 DAYS)

NOVEMBER 3 e

ALL FUEL LOAD MODIFICATIONS COMPLETE NOVEMBER 9 e

PLANT WALKDOWN COMPLETE NOVEMBER 10 e

PLANT READY FOR FUEL LOAD (STEP 1)

NOVEMBER 15 e

ALL MODIFICATIONS FROM DESIGN DECEMBER 31 VERIFICATION PROGRAM COMPLETE (STEP 2/3) e PLANT READY FOR LOW-POWER TESTING DECEMBER 31 (STEP 2) e ACHIEVE CRITICALITY JANUARY 17 e

PLANT READY TO EXCEED 5% POWER FEBRUARY 15 (SlEP 3)

SLIDE 5 OCTOBER 28, 1983 D. G. EISENHUT

SUMMARY

OF ALLEGATIONS

1. CONFIDENTIAL
1. COMPONENT COOLING WATER SYSTEM SSER 16

~

(MR. SMITH)

JAN. 1983

2. 10 ITEMS RELATED TO CLASSIFICATION SSER IN BN 83-03 AND DESIGN OF SYSTEMS PREPARAT101 (SOURCE - CONFIDENTI AL)
2. ANONYMOUS VIA 8 ALLEGATIONS REGARDING SEISMIC REVIEW CON-D.FLEISCHAKER STRUCTURAL DESIGN DUCTED, SSI (BN 83-48)

IN PREPARA~

3. CONFIDENTIAL SYSTEMS INTERACTION STAFF AuDI-SEPT. 22 (SOURCE /INFORMATION - CONFIDENTIAL)

OCT. 25-26 (BN 83-163)

4. ANONYMOUS VIA DOCUMENTATION PROBLEMS IN H. P. FOLEY UNDER REVII G0v. CALIF.

ELECTRICAL CONSTRUCTION WORK SEPT. 28,1983 (BN 83-170)

5. ANONYMOUS 8 ALLEGATIONS REGARDING SEISMIC STAFF AuDI-BECHTEL.PG8E STRUCTURAL DESIGN OCT, 25-26 EMPLOYEES OCT. 12, 1983 (BN 83-16)
6. CONFIDENTIAL ALLEGATIONS ON H. P. FOLEY QA/0C (JuST OCT. 19, 1933 MATTERS RECEIVED)

(BN 83-164)

(SOURCE /INFORMATION - CONFIDENTIAL)

SLIDE 6 QCJ.~ 2?,1903 U. ISENHUT j

_2-e 7

MR. JOHN COOPER RHR SYSTEM OPERATION (JuST RECEIVED)

OcT. 24, 1983 AND INSTRUMENTATION (BN 83-169.)

8. ANONYMOUS SMALL BORE PIPING & SUPPORT

(~3UST RECEIVED)

~

OCT, 27, 1983 (BN 83-171)

9. ANONYMOUS SERIOUS INADEQUACIES IN FOLEY (N0 DETAILS

" BILL" AND PULLMAN QA PROGRAMS PROVIDED)

OcT 24, 1983 OTHER Ali FGATIONS UNDER REVIB4 'BY ' REGION V AND 01

~

._3..-

O

4 FUEL LOAD READINESS e

ALL MAJOR MODIFICATIONS INSIDE CONTAINMENT MUST BE COMPLETED.

e ALL FUEL LOAD OPEN ITEMS OF DESIGN VERIFICATION PROGRAM ARE RESOLVED.

o FUEL LOAD AUTHORIZATION (STEP 1) WILL 1NCLUDE MODE 6 AND MODE 5 0F TECHNICAL SPECIFICATIONS ~(I.E., UP TO II40 F REACTOR COOLANT TEMPERATURE)

BACKUP SLIDE 1 OCTOBER 28, 1983 D. G. EISENHUT

4 FUEL LOAD ITEFS (G) REQUIRING FOLLONUP (SSER 19 PAGE C.5-2) 1.

SPECTRUM AVERAGING FOR RESOLVED - ADDITIONAL CONTAINfENT ANANULUS INFORMATION HAS BEEN PROVIDED 2,

20 HZ CUT OFF FREQUENCY RESOLVED - ADDITIONAL INFORMATION HAS BEEN PROVIDED 17.

BUCKLING CRITERIA FOR RESOLVED - AUDIT ON LINEAR SUPPORTS 10/25-27 18.

ANALYSIS OF PIPING RESOLVED - COMPLETION SYSTEMS AT STEP 3 29, JET IMPINGEMENT LOADS RESOLVED - COMPLETION AT STEP 3 30.

RUPTURE RESTRAINTS RESOLVED - AUDIT ON 10/25-27 BACKUP SLIDE 2 QcJOBER 28,1983 J,t!SENHUT