Summarizes 830418 Meeting W/J Wermiel,A Vietti & B Buckley & J Smith Re Status of NRC Reevaluation of Component Cooling Water Sys.Comments Solicited from J Smith on Draft SER in Area of Surge Tank Level Instrumentation Seismic Design
ML20209C129
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 04/27/1983
From: Parr O
Office of Nuclear Reactor Regulation
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20209B155 List:
References
FOIA-86-151 NUDOCS 8305060159
Download: ML20209C129 (2)


Text

.

' f5 t *O m..

R. L W an. Girte.:or, M i' a : '

r. -

' Rt..

L.

Pubenst:'in. AEsistant Cirs. tor i r. ' -p Oivision :,' Systeras Integratier., we Roger J. Mattson, Director Div f s 3cn ::- Sj::em

. c

-,9.. :

Division of Systems Integration, Np.A i

FROM:

Dlan D. Parr, Chief, Auxiliary Syste:ns Branch. ?'r.::co - I Integration, NRR

~

2 So - 2 7 % g

(

SUBJECT:

MEETING WITH "MR. JDHN SMITH" REGARDING Ati.EGATIONS C T

'E'.?E'7 f

THE DIABLO CANYON CCMPONENT C001.ING WATER SYSTE.M 5

On Monday evening April 18, 1983, staff members including mr.el f. J. Wcm ei, 4

A. Vietti, and B. Buckley met with "Mr. John Smith" in orace tv discuss tne 3

status of the staff's reevaluation of the Diablo Canyon component cooling water y

system (CCWS) including those concerns raised by Mr. Smith during his meetin.;

p cith the staff in January 1983.

We solicited connents from Mr. 5.r.ith reca-dit:c si our understandng of his concerns and any comments he had on our draf t CCW1 I

safety evaluation report (SER).

[

Mr. Smith provided specific comments regarding our SER in the areas of the .C*4 surge tank level instrumentation seismic design, seismic Category I surge

.w-

?

makeup capability and appropriate procedures, use of the term seismic Cat.mor p

I" when referring to the qualification of nonessential loop "C" component 3

pressure boundaries to the SSE, and heat renoval capability when only twe CCW N

pumps are operable. We indicated we would discuss his concerns with the appli-h

! cant during our April 19, 1983 meeting and would revise the SER before issuance.

d In addition, Mr. Shif th also raised two new items not previously mentioned n y('

l the January meeting.

There are as follows:

1.

How can the NRC staff assure itself that the Hosgri seismic reverif'cc D u

[

of various components is adequate when many of these components lac.

u.,

fj documentation or other QA to support their design, materials of con.t c.

.oe.

and installation? This is particularly true of the upgradi.3g of c r.we ts f

unich were originally bought as nonessential equipment and thus hac no,.-

O applied to them. We will discuss this matter with Mr. J. P r.nig ht se E.

connection with the Division of Engineering review of tha DiaMo Car. yon

.(

Phase ! IDVP.

n Y,'

2.

Wy doesn't the staff take a sir.gle passive f ailure to tha r.'CkS conti, eent cith an accident such as a LOCA as prescribed in the cefinition of 'sincla

,5 failure" in 10 CFR 50 Appendix A and because GDC 44 ref ers

, sing'e failure.

We informed Mr. Smith that we were aware of ' mis ae >nstan.-

s where a passive failure is taken after an accider' JN ! ni'

'J 3-'

c-seal failure in the long tene pust-LOC 3 er eery mde MW Section 9.2.2 does not inc lude pa ss ive t a C n s % ' :c r ni # ~

1

<. ~ r ~,. w g 3.o:Soso/59

,o v1

\\ --

O F r i C I A L, h *_ '. U 4 ; >

i-'

.~.v--

m.casmuux-n w,s w.,,-.

-m

i l

l

.Or.'d a.

. ? r.' u -

tie it:fomd Mr. 1r:th t ha t the two nes i te,,r+4-e..

nagement.

On the evening o*' april 19, 1933, Mr. Seii'.h called Mr. %-

i. -

further concerns with Dia:,lo Canyon.

We understand r.

u 1 :.

  • ce n--

a memorandura to J. Eisenhut discussing this : n/ersa'.1cr..

Based on the discussions.<ith Mr. Scith on A;-il 10, and tne Aar.i 19 ene call Mr. Smith is probably not totally satis f tec un tr.e

.t3"',

lutice, of his concerns.

Olan D. Parr, Cnie' Auxiliary Systens Branch Division of Systems integration cc:

R. Mattson L. Rubenstein D. Eisenhut T. Novak G. Knighton 1