ML20209C490

From kanterella
Jump to navigation Jump to search
Notification of 831014 Briefing for Commissioner Gilinsky, Covering Analyses & Mods Used to Restore Seismic Response of Annulus Steel Structure
ML20209C490
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 10/04/1983
From: Knight J
Office of Nuclear Reactor Regulation
To: Vollmer R
Office of Nuclear Reactor Regulation
Shared Package
ML20209B155 List:
References
FOIA-86-151 NUDOCS 8310130375
Download: ML20209C490 (1)


Text

p c tacoq d

4 UNITED STATES I'i,()F h

NUCLEAR REGULATORY COMMISSION r,,.-

a E WASHINGTON, D. C. 20555

\\;*~d; f 007 4 1933 NOTE TO:

R. H. Vollmer, Director, DE FROM:

J. P. Knight, A/D CSE, DE Agreement of the parties has been reached with regard to a staff briefing for Copnissioner Gilinsky covering the analyses and modifications employed to restore the seismic response of the annulus steel structure at Diablo Canyon Unit. l. Rick Parrish of OGC has informed me that the agreement requires that we provide a short summary of the briefing and subsequent discussions for the record and that we be prepared to repeat the essence of the briefing at the October 28 meeting if requested to do so.

The briefing is now scheduled for Friday, October 14 at 10:00 a.m.

The briefing-will be informal and will largely consist of the staff and perhaps an individual from BNL providing a verbal description of the process using a small number of pre-prepared sketches.

At the present time I anticipate that the briefing will be given by myself, P. T. Kuo and H. Polk of the staff and either Dr. Philippacopoulos or Professor

.- Miller from BNL, -

n

/

f J[.. K h

Ass s ant Director for Comp ~onents & Structures Engineering Division of Engineering cc:

H. Denton D. Eisenhut G. Lear L. Chandler P. T. Kuo H. Polk HLwo33d1 A. Philippacopoulos, BNL C. Miller, BNL Str [ )'

l v

g 73 Jo L 303 75 we

- - - _ _ _ _ _ - - -. - - - - - -