Forwards SER Re Lack of 3 H Fire Rated Penetration Seals in Cable Spreading Room Ceiling/Control Room Floor Assembly at Plant.Present Penetration Seals Acceptable
ML20207A807
Person / Time
Site: 05000000, Pilgrim
Issue date: 03/17/1988
From: Mccracken C
Office of Nuclear Reactor Regulation
To: Wessman R
Office of Nuclear Reactor Regulation
Shared Package
ML20204C423 List: ... further results
References
FOIA-88-198 TAC-66913, NUDOCS 8803240359
Download: ML20207A807 (2)


Text

6 N?Y y,...s(,

. /

UNITED STATES Y

NUCLE AR REGULATORY COMMISSION

.k '

i w AssiNoToN. o. c. 20sss

,,' l<, /

e, 4

4, *..

M 171368 Docket No.:

50-293 MEMORANDUM FOR:

Richard H. Wessman, Project Director Project Directorate 1-3 Division of Reactor Projects I/!!,NRR FROM:

Conrad E. McCracken, Chief Chemical Engineering Branch Division of Engineering & Systems Technology, NRR

SUBJECT:

SAFETY EVALUATION REPORT CONCERNING LACK 0F 3-HOUR FIRE RATED PENETRATION SEALS IN CABLE SPREADING ROOM CEILING / CONTROL ROOM FLOOR ASSEMBLY AT PILGRIM NUCLEAR POWER STATION (TAC NO. 66913)

Plant: Pilgrim Nuclear Power Station Licensee: Boston Edison Company TAC No.: 66913 Review Status: Complete The Chemical Engineering Branch Safety Evaluation Report of the licensee's resolution of Item A on page 4 of Region ! Inspection Report 87-39 is enclosed (Enclosure 1). Item A pertained to deficient penetration seals in the Cable Spreading Room ceiling / control room floor assembly and the effect of these deficient seals on a 1981 exemption from certain requirements of Appendix R to 10 CFR 50 to provide automatic suppression in the enntrol room. Approval of the exemption was based, in part, on a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> rating of the ceiling / floor assembly between the Cable Spreading Room and the Control Room.

The licensee presented several technical points supporting their position that the existing penetration seals are satisfactory and that upgrading these seals is not required.

We agree with the licensee and find the present penetration seals acceptable.

i

,1 C/

lr~<cs l

l l

.f

, (q _9 b rp C piV SgY i

r y

l

l t

e l

I l

R. Wessman l r

l l

l Our SALP input is provided in Enclosure 2.

We consider our effort on TAC No.

l 66913 to be complete.

P J f+n J

.w =-

l onrad E. McCracken. Chief I

Chemical Engineering Branch Division of Engineering & Systems Technology

Enclosures:

(1)SER (2) SALP Report ec:

L. Shao J. Richardson f

D. Kubicki

3. Boger i

D. Mc knald A. Krasopoulos. Region 1

6. Wiseman. Region !!

J. Ulie. Region !!!

t R. Ireland. Region !Y C. Ramsey V l

Contact:

D. Notley. x20847 l