ML20205E431

From kanterella
Jump to navigation Jump to search
Summary of 860730 Meeting W/Util at Region I Re 860725 Announcement to Keep Facility Out of Svc to Complete App R Fire Protection Mods.W/O Encl Meeting Agenda & List of Attendees
ML20205E431
Person / Time
Site: 05000000, Pilgrim
Issue date: 08/12/1986
From: Leech P
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20204C423 List: ... further results
References
FOIA-88-198 NUDOCS 8608180348
Download: ML20205E431 (1)


Text

_ _ _ _

1 L

I August 12, 1986 i

Docket No. 50-293 LICENSEE:

Boston Edison Company j

i FACILITY:

Pilorim Nuclear Power Station L

SUBJECT:

MEETING WITH BOSTON EDIS0N COMPANY RE PILGP!M STATION l

l On July 30, 1986, I attended a meetino with Boston Edisnn Company representa-i tives at the NRC Region I headquarters. The principal attendees are shown on the attached notice of the meetino. Also attached is the meetino acenda, t

Reginn I will issue a meetino report.

i The following items of information from the meeting are of particular interest f

to NRR:

[

1.

On July 25 BECo had announced a decision by its Poard of Directors to keen Pilgrim out of service in order to complete Aprendix R fire protectinn mndifications, refueling, and containment enhancement measures. BEco indicated at the meeting that restart is likely in i

February 1987, but it en91d be as late as May 1987.

j 2.

The containr'ent measures will relate to improvements in hydrogen control, venting and spray. The fire pump may be connected to the spray system.

I i

3.

An extensive startuo procram of several weeks is planned and there will l

be "hold pnints" during the startup, which will allow REco and Region I I

]

to review the plant status before the startup continues.

I 4

In response to IE Infortnation Notice 86-39. BEco has examined two RHR pumps i

and will examine two more. To date, no wear rinos defects have been detected visually but one bearing exhibited waar. A lower impeller wear ring has been sent out for further examination.

g Original signed by:

Paul H. Leech, Project Manager BWR Pro.iect Directorate #1 1

]

Enclosures.

J As stated 1

DISTRIRtITION:

Docket Mle Pilgrim File

[

4 J. Zwolinski BWM1 Reading File l

W6 R. Bernero

[

C. Jamerson R. Houston i

i I

DBL:BWQU Pleech\\ %

08/ W 36 i

i i

r SQNKDW~a 7Q-l

i i

  1. 118 M No.86-084 U.S. NUCLEAR REGULATORY COMMISSION I

1 REGION I t

NOTICE OF LICENSEE MEETING a

i l

]

Name of Licensee:

Boston Edison Company i

Name of Facility:

Pilgrim Nuclear Power Station Docket No.:

50-293 i

Time and Date of Meeting:

1:00 p.m., July 3,0, 1986 t

location of Meeting: NRC, Region I, Main Conference Room I

l Purpose of Meeting: Management Meeting l

1 i

NRC Attendees:

T. V iey, Regional Administrator l

1 J. '

an, Deputy Regional Administrator i

R. Starostecki, Director. Division of Reactor Projects j

S. Ebneter Director, Division of Reactor Safety H. Kister, Chief, deactor Projects Branch No.1, ORP 1

]

J. Strosnider, Chief, Reactor Proje.s Section No. 18, ORP j

M. McBride, Senior Resident Inspector, Pilgrim P. Leech, Project Manager NRR Licensee Attendees:

J. Lydon, Chief Operating Of ficer A. L. Oxsen, Vice President - Nu$ lear Operations 1

A. E. Pedersen, Plant Manager

.l E. Howard, Vice President - Engineering & QA K. Roberts, Director of Outage Management 4

j R. Swanson, Nuclear Engineering Manager Note: Attendance by NRC personnel at this meeting should be made known by July 25, 1986 via telephone call to J. Strosnider Region I, at i

FTS 8-488-1129.

i l

1

(

j Prepared by:

i a

1 i

I i

i

~

y byr l

W v'

V l

1

i 1

i JULY 30, 1986 NRC/ BOSTON EDISON COMPANY MANAGEMENT MEETING AGENDA Plant Status - RHR/LLRT Status Update on SALP Issues Status of 6-Week Management Review Plan to Control Overtime During Startop Overview of Haster Startup List 1

i Mark I Containment Issues and PNPS l

Once/ Cycle Surveillance Issue l

j Status of MR Backlog l

Effectiveness of Maintenance Planning Prucc>s l

Major Outage Activities l

1 l

l l

l 1

l k

o

/

~

2 Distribution:

victor Stello, Jr., Executive Director for Operations James Sniezek, Acting, Deputy Executive Director for Regional Operations and Generic Requirements James M. Taylor, Director, Office of Inspection and Entorcement James G. Partlow Director, Division of Inspection Programs, IE Jane Axelrad, Director, Enforcemert Staff. IE J. Lieberman, Director and Chief Counsel, Regional Operations and Enforcement Division, OELO R. Bernsro, Division Director, NRR P. Leech, Project Manager, NRR J. Zwolinski, Branch Chief, NRR Public Document Room (POR)

Local Public Document Room (LPOR) 1 i

i e

\\

)

./

UNITED STATES NUCLEAR REGULATORY COMMISSION o

g WASHINGTON. D C. 20H4

%.....J g

1 1906 l

l r

MEMORANDUM FOR:

D. Huller. Director l

BWR Project Directorate #2. DBL J. Zwolinski. Director

)

BWR Project Directorate fl. DBL FROM:

Gus C. Lainas. Assistant Director Division *of BWR Licensing h

SUBJECT:

SCHEDULES FOR REVIEW OF HATCH 1 AND 2; P!LGRIM:.2,4 MGNTICELLOEXTENSlQti DATES -

A i

1 We hau received TAC requests to perform reviews of operating license ext.ensions for Hatch I and 2. Pilgrim, and Monticello. Considering the low priority for this effort, we would propose the following review 1

schedules:

1.

Hatch I and 2: wuly 1987 i

2.

Pilorimi, August 1987 l

3.

Monticello:

Jeptember 1987

{

Note that there are four branches involved 14 this effort. PSS will coordinate the responses and you will be provided with integrated Plant SERs.

If you need any furth1r clarification or would like to comment on the above, please advise me and we can meet.

U d

Gus C..ainas. Assistant Director

[

Division of BWR Licensing cc:

W. Houston B. D. Liaw M. Srinivasan J. Hulman W. Hodges G. Rivenbark P. L sch R. Auluck o% 2-,c o _

p.