February 5, 1988 PFNORANDUM FOR:
Steven A. Varga, Director Division of Reactor Projects I/!!
Bruce A Boger. Assistant Director FROM:
for Region ! Reactors Division of Reactor Projects I/I!
SUBJECT:
PILGRIM FIRE PROTECTION LICENSING ACTIONS Pilgrim currently has thirteen licensina actions that will have tn be resolved prior to a restart decision by the staff.
Five of these involve fire of the five is essentially cceplete and the Tech. Spec. package is in OGr.}One protection issues for whic.h CMEB has lead responsibility for our review.
A sixth fire protection issue involves a proposed Exemption to Appendix R rtquirements relating to safe shutdown. The SER on this proposed exes'/ tion is j
being completed by SPLB and no technical, procedural, or schedular cracerns are evident.
P.. Wessman and D. Mcdonald met with C. McCracken and D. Notley of the CMEB to review the five issues being reviewed by the CMEB and apree to target dates for completion of the staff effort. Enclosure 1 sunnarizes th's status of these actions. We believe the target dates for completion of our effort will not place us on the utility's "critical path."
l We indicated in the enclosure that one item (seals-4-inch and under) is waiting for a submittal. We have just received the submittal and provided it i
to D. Notley.
Two other items (Control Room Floor, and Combustible Loadings in the RB and Torus Room) may not be acceptable to the staff. We are I
continuing our dialegue with BEco regarding these three issues. We have contacted BEco management to ensure deco is giving proper attention to fire I
protection issues and are continuing our dialogue with BECo regarding these
- issues, i
l Bruce A. B
. Assistant Director for Region ! Reactors Division of Reactor Projects I/!!
Enclosure:
As Stated j
cc w/ enclosure:
C. McCracken J. Durr (RI) l D. Notley A. Krasopoulos (RI)
L. Shao J. Craig i
J. Richardson S. Collins (R!)
F. Miraglia R. Blough (RI)
- 0. Gonaley JOHNSONag{-J90d $of 4 000926 peg
[
f
s ',.
f.
Inclosure i PILGRIM FIRE PROTECTION LICENSING ACTIONS iER LIC IAC DATE DATE SUPJECT'REMARKG 53416-10/28/8" 03/15/88 3.Appandix R axametiens invelvins RB and torus fire ar*as snd combustible loadings.
SER of 10/28 required clarification.
O.
Gormley revising SER to reflect clarifications of 11/24/87 meeting with BEco.
Transitory loads info received from BECo 1/19/88.
BECo propoting combustible loads that may not be acceptable.
CMEB (Nctley) to review SER rewrite and assure technically acceptable
,before it goes to OGC.
54610 12/23/87 02/15/88 Tech. Spec. Amendment package sent to OGC 01/22/88.
65962 03/01/88 04/01/88 3 Accendix R exemetions involvinz cower sueelies in Aux. Building.
Initial CMEB review indicates BECo request of 8/10/87 probably acceptable.
66913 03/15/88 04/01/88 Control Room Floor.
Seals found by inspectors that do not meet 3-hour basis of exemption granted in 1981.
BECo submittal of 12/8/87 proposes treating control and cable spread room as common area.
Initial CMED review indicates probably unacceptable.
Additional information needs and staff position for restart
- unknown, 03/15/88 04/01/38 Seals inch and under.
BECo submittal expected by 2/8. (Review target dependant on this date).
Generic approach subject of topical review, results cf which are not expected for 3-6 months.