KING oF PRUe81A, PENNSYLVANIA 19400 November 12, 1987 l
Charles V. Barry Secretary of Pubite Safety Executive Office of Public Safety One Ashburton Place Coston, MA 02108
Dear Mr. Barry:
The Nuclear Regulatory Commission staff on August 27, 1986 in an addendum to our Confirmatory Action Letter 86-10 to Boston Edison Company (BEco) required BEco to provide a written report that documented a formal assessment of its readi ness.'or restart of the Pilgrim plant.
In response, BEco transmitted to the NRC on July 30, 1987, the Pilgrim Nuclear Power Station (PNPS) Restart Plan Volume 1 and Volume 2, Revision 0.
This plan provided an outline of the program and a limited description of results.
On October 28, 1987, NRC re-ceived Volume 2, Revision 1, which updates the results of the Restart Program.
A subsequent revision to Volume 2, is expected to be transmitted by BEco in l
connection with the NRC restart team inspection. Enclosed for your information is the revision of the PNPS Restart Plan that we have received to date.
Currsntly, the NRC staff is evaluating BEco's plan to determine its adequacy and to assist us in planning NRC inspections.
As part of oc deliberations, we are requating any comments that the Commonwealth of Massachu etts may have on the plan itself and results to date.
To assure that the Cosunonwealth's comments are appropriately considered by the staff, they should be provided to NRC Region I by December 11, 1987.
By copy of this letter, the PNPS Restart Plan is also being transmitted to other Commonwealth offices that have express-ed an interest to the NRC staff in the restart deliberations.
We would appre-ciate your assistance in coordinating and transmitting the comments from the various Commonwealth offices to us on the schedule discussed above.
As' u'know. tha'NRC'also')Ta*nWt5coWi a nublic meeting in ths'a'res of W '
~
Rentart'Plac'4a.MulWteeniHtti:dtrecD9 frem;the punfle 'regardipg the PNP 5w Pil is plant tublic testimony transcribed from this meeting or provided in writing will also be considered in our deliberations.
At a later date, a followup meeting will be held to explain the NRC staff's disposition of the public comments received.
W havd' requested._Mr,' Peter Aanes: Assistant hretar *ef'.PublW5afety, to provide s"ugge~stfons, regarding moeung tocatons and nee's' of the~dognizant..
1ecal officid14.te*ceopdinate meeting' dates.' Mr. Agnes will be informed of the final schedule for these meetings.
8810270486 000926 MNS
-190 PDR
2 The meetings will be advertized in the local press (please see Enclosure 2).
To further facilitate these meetings, we provided copies of the PNPS plan to the local libraries listed in Enclosure 2 for public review.
We would appre-ciate your efforts as the State Liaison Officer to riotify all appropriate Commonwealth and local officials about tr.ase meetings.
Thank you for your cooperation.
If you have any questions, please call our Regicaal State Liaison Officer, Marie Hiller at (215) 337-5246.
Sincerely, liiam T. Russell dI Regional Administrator
Enclosure:
As Stated cc:
S. Pollard R. Hallisey t
I 4
.n
,,. _ -, - ~ - -
,-.-m,,---
ENCLOSURE 2 NOTICE PUBLIC MEETING NUCLEAR REGULATORY COMH1.iSION The Nuclear Regulatory Commission ataff will conduct a public meeting on (to t.'_determintd) 1987 from 7:00 p.m. to 9:00 p.m. to receive public comer.ts on Boston Edison's Pilgrim corrective action plan entitled "Pilgrim Nuclear Power Station Restart Plan."
These coments should focus on concerns that the public believes should be considered by the NRC staff in its restart assessment
)
i deliberations.
The me ting will be held at (to be determined).
The purpose of the meeting is to receive coments, but not to respond to specific coments or questions.
The staff expects to consider in its eventual restart assessment, all comments and questions it receives.
Oral comments should be limited to five minutes per person to permit the greatest partici-pation of all who come to the meeting.
Written statements to amplify on the oral comments will also be accepted.
Anyone not able to attend the meeting may mail coments to Mr. A. R. Blough, U. S. Nuclear Regulatory Commission, 631 Park Avenue, King of Prussia, PA 19406.
The public meeting will be trans-cribed and a copy of the tran cript placed in the Local Public Document Room.
A copy of the Boston Edison action plan is currently available in the Local i
Public Document Room located at Plymouth Public Library, North Street, Plymouth, Massachusetts. Additional copies will be available at the public if braries in Carver, on Main Street, Ouxbury at 147 St. George St., Kingston on Summer St., Marshfield at Library Plaza, Plympton at 248 Main St., and Wareham at 75 High Street.
-