ML20205K643

From kanterella
Jump to navigation Jump to search
1998 Annual Environ Operating Rept for Waterford 3. with
ML20205K643
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/31/1998
From: Ewing E
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-99-0066, W3F1-99-66, NUDOCS 9904130315
Download: ML20205K643 (3)


Text

i ,-

,ia ,s~

%g t perations,Inc.

Killona, LA 70066 Tel 504 739 6242 -

E C. Ewing,111 -

gagety a segulawy Anes W3F1-99-0066 A4.05 PR-April 8,1999 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Annual Environmental Operating Report - 1998 Gentlemen:

Attached is the 1998 Annual Environmental Operating Report for Waterford 3. This report is submitted pursuant to Subsection 5.4.1 of the Environmental Protection Plan (Appendix B to the Operating License).

Should you have any questions regarding this report, please contact Roy Prados at (504) 739-6632.

Very truly yours, j 1 E.C. Ewi g Director,  ;

Nuclear Safety & Regulatory Affairs ECE/RWP/ssf fgh Attachment fb

./

cc: E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),

J. Smith, N.S. Reynolds, R.H. Gibson (EPA),

L.K. Levy (LA DEQ), NRC Resident inspectors Office I

9904130315.981 DR 1  !

ADOCK 050 382 sk.

c eda _a ,

)

i a

Attechment to W3F1-99-0066 Page 1 of 2 WATERFORD 31998 ANNUAL ENVIRONMENTAL OPERATING REPORT l

The following information is provided pursuant to the Environmental Protection Plan (EPP) Subsection 5.4.1 for the calendar year 1998.

A. Summaries and analyses of the results of the environmental protection activities required by EPP Subsection 4.2:

This subsection of the EPP provides protection of the two cultural resourns areas on the Waterford 3 site. There were no activities which affected either the Plantation Overseer's House site or the Plantation Quarter's site, both eligible for the National Register of Historic Places, during this reporting period.

B. EPP noncompliance's and the corrective actions taken to remedy them:

There were no noncompliances with the requirements of the EPP during this reporting period.

C. A discussion of changes in station design or operation, tests, or exoeriments made in accordance with the EPP Subsection 3.1 which involved a potential significant unreviewed environmental question:

There were no changes in station design or operation, tests or experiments involving a potential significant unreviewed environmental question during this reporting period.

D. Nonroutine reports submitted in accordance with Subsection 5.4.2:

On September 30,1998, Waterford 3 notified the Louisiana Department of Environmental Quality (LA DEO) of the status of the measures 'Naterford 3 has taken with regard to minimizing periodic cooling tower spill over.

Waterford 3 has obtained system design changes from the cooling tower vendor and has included these changes in the plant's Performance improvement Plan for prioritization and implementation during the next refueling outage, Refuel 10. Implementation of the changes should minimize the spill over of water from the cooling towers.

I i

- Att:chment ti W3F1-99-0066 Page 2 of 2

- Concurrent with the above, Waterford '3 has applied for two additional Intemal'

- Outfalls to be included in the plant's Louisiana Pollutant Discharge Elimination.

System (LPDES) permit. ; This will result in requiring discharges from the cooling towers, such as spill over, be limited, monitored and reported to the LA DEQ in a monthly discharge monitoring report.

f a

.___