Forwards Info Received from Ies Utilities,Inc Re Discussions About Conversion from Current to Improved TS at Daec. Requests That Info Be Placed on Docket
ML20203C414
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 12/05/1997
From: Kelly G
NRC (Affiliation Not Assigned)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9712150299
Download: ML20203C414 (32)


Text

__ __ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _

( g-v c

s" ,

t ,- :

December 5, 1997 MEMORANDUM TO: Information and Records Management Branch -

Office ofInformation Resources Management -

FROM: Glenn B. Kelly, Senior Project Manager Project Directorate 3 3, DRPW, NRR

SUBJECT:

INFORMATION TO BE PLACED ON TIIE DUANE ARNOLD ENERGY CENTER (DAEC) DOCKET (50-331)

The enclosed information documents a fax received from IES Utilities Inc. regarding discussions

, about the conversion from current to improved Technical Specificatior.s at DAEC Please place the enclosed fax on the DAEC docket.

Enclosure:

as stated ,

Docket Nos. 50-331

- cc: See next page

, DISTRIBUTION. "

. Docket File - PUBLIC G. Grant, DRP, Rlli EAdensam (EGA1) o

' PD3-3 RF R. Savio G. Kelly ACRS (h " '

,OGC- E. Tomlinson R. Tjader ,

, DOCUMENT NAME: G:\DUANEARN\lTSFAX01.WPD ro . . copy or m. occum ni no, cat. m m. non c cony ro .it. cam.nsenclosure E= Copy wim .tt.chment/ enclosure N e No copy .4 I

OFFICE PM:PD33 E LA:PD33 E _

?lNAME- GKelly\ kh! , r1 DATE-- 12/05/97 12/ /97- ,

OFFICIAL RECORD COPY

' a. a wt j [ ""9 fq@y

, 5 9712150299 971205 PDR ADOCK 05000331 P PDR l.lil.ill.l!I.lil.1.1.1 iI.I r

49 'h'4, .

ge- , UNITE.0 STATES j l'y. - NUCLEAR REGULATORY COMMISSION -

p 2 WASHINGTON, D.C, 2066Mm01 -

December 5, 1997 MEMORANDUM TO: Infonnation and Records Management Branch Office ofInformation Resources Management FROM: Glenn B. Kelly, Senior Project Manager Project Directorate 3-3, DRPW, NRR g

SUBJECT:

INFORMATION TO BE PLACED ON Tile DUANE ARNOLD ENERGY-CENTER (DAEC) DOCKET (50-33!)

- The enclosed information documents a fax received from IES Utilities Inc, regarding discussions

about the conversion from current to improved Technical Specifications at DAEC. Please place the enclosed fax on the DAEC docket.

Enclosure:

as stated Docket Nos. 50-331 cc: See next page -

,,___ q

" l I

i l

I I

l l

i w

l j.

r a

d i

i

12/05/97 13:22 9319 851 9193 IEs INDUSTRIES 2003[016

! LS Instrumentation 3.3.6.3 3.3 INSTRUMENTATION 3.3.6.3 Low Low Set (LLS) Instr entttion

( 8V LC0 3.3.6.3 The LLS valve instrumentation for each Function in Table 3.3.6.3-1 shall be OPERABLE.

APPLICABILITY: MODES 1. 2. and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One LLS valve A.1 Restore channel (s) to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable due to OPERABLE status.

inoperable channel (s).

B. One or more safety / B.1 --------NOTE---------

relief valves (S/RVs) LC0 3.0.4 is not with one Function 3 applicable, channel inoperable. ---------------------

Restore tailpipe Prior to pressure switches entering MODE 2 OPERABLE status. or 3 from MODE 4 w.

C. ---------NOTE--------- C.1 Restore one tailpipe (14] days Separate Condition pressure switch to entry is allowed for OPERABLE status, each S/RV.

One or more S/RVs with two Function 3 channels inoperable.

(continued)

BWR/4 STS 3.3-67 Rev 1. 04/07/95

12/05/97 13:22 0319 851 7193 IES INDUSTRIES @004/016

, RCS P/T Limits 3.4.10 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. -----

---NOTE--------- C.1 hitiate action to Immediately Required Action C.2 restore parameter (s) shall be completed if to within limits, this Condition is entered. ASD ,

C.2 Determine RCS is Prior to Requirements of the acceptable for entering MODE 2 LC0 not met in other operation, or 3.

than MODES 1. 2.

and 3. v t 7. .

SURVEILLANCE REQUIRFMENTS IURVtiLLANLL FREQUENCY SR 3.4.10.1 ........------.-..-NOTE--------------------

Only required to be performed during RCS heatup and cooldown operations and RCS inservice leak and hydrostatic testing.

Verify RCS pressure. RCS terperature, and 30 minutes RCS heatup and cooldown rates are within the limits specified in the PTLR.

SR 3.4.10.2 Verify RCS pressure and RCS temperature are Once within within the criticality limits specified in 15 minutes the PTLR. prior to control rod withdrawal for the purpose of achieving criticality (continued)

BWR/4 STS 3.4-24

  • Rev 1. 04/07/95

18/05/97 13:33 3319 851 7193 IES INDl'STRIES @ 005/016 t

4 I

I 3.C.t Waf4 I

'39l-2 L f

1

! 1 4

e a

1 f ..*

b

IES INDUSTRIES @006/016 12/05/97 13:23 G 319 851 7193 ,,

. Primary Containment Hydrogen Recombiners 3.6.3.1 3.6 CONTAINMENT SYSTEMS 3.6.3.1 Primary Containment Hydrogen Recombiners (if permanently installed)

LCO 3.6.3.1 Two primary containment hydrogen recombiners shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION pre" ~ m nN... COMPLETION TIME m 1 ~

A. One primary FA1 --------NOTE------

containment hydrogen d LCO 3.0.4 is not )

recombiner inoperable. I* applicable.

1 Restore primary ' 30 days containment hydrogen recombiner to OPERABLE status.

IB. Two primary B.1 Verify by 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

! containment hydrogen administrative means I

recombiners that the hydrogen AtiQ i inoperable. control function is

! maintained. Once per l 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> l thereafter B.2 Restore one primary 7 days containment hydrogen

' recombiner to l

OPERABLE status.

(continued) l BWR/4 STS 3.6-40 Rev 1. 04/07/95

12/05/97 13:23 C319 851 7193 IEs INDUSTRIES @ 007/016

[Drywell Cooling System Fans) 3.6.3.2 3.6 CONTAINMENT SYSTEMS 3.6.3.2 [Drywell Cooling System Fans)

LCO 3.6.3.2 Two [drywell cooling system fans) shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

AfTIONS WC # .__

ornmorn ACTION COMPLETION TIME l.

A. One [ required)

('- A.1 --------NOTE----- --

[drywell cooling LCO 3.0.4 is not system fan) applicable.

inoperable.

Restore required) 30 days

[drywell cooling system fan) to OPERABLE status.

B. Two [ required) B.1 Verify by 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />

[drywell cooling administrative means system fans) that the hydrogen AND inoperable, control function is maintained. Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND B.2 Restore one 7 days

[ required] [drywell cooling system fan) to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion l Time not met.

BWR/4 STS 3 6-42 Rev 1. 04/07/95

12/05/97 13:23 C319 851 7193 IES INDUSTRIES @ 008/016

- ' CAD System 3.6.3.4 3.6 CONTAINMENT SYSTEMS 3.6.3.4 Containment Atmosphere Dilution (CAD) System LCO 3.6.3.4 Two CAD subsystems shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS I

RE0gD" M3J( COMPLETION TIME A. One CAD subsystem fl .--..-. NOTE------ T --

inoperable. '

LCO 3.0.4 is not applicable.

syster 30 days to OPERABL; status. I IB.TwoCADsubsystems B.1 Verify by 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable, administrative means i that the hydrogen M i control functiot, is

, maintained. Once per j 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter I

! I M I B.2 Restore one CAD 7 days subsystem to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Compietion Time not met.

BWR/4 STS 3.6-45 Rev 1. 04/07/95

12/05/97 13:24 0319 851 7193 IEs INDUSTRIES @009/016 DG [18) SSW System 3.7.3 3.7 PLANT SYSTEMS 3.7.3 Diesel Generator (DG) [1B) Standby Service Water (SSW) System LCO 3.7.3 The OG [1B) SSW System shall be OPERABLE.

APPLICABILITY: When DG [18) is required to be OPERABLE.

ACTIONS COMPLETION TIME A. DG [1B] SSW System 1

-- ---------NOTE-------------

inoper able.

l CO 3.0.4 is not applicable. l A.1 B hours Unit [1] plant service water (PSW) subsystem.

. MD A.2 Verify cooling water Once per 31 days is aligned to DG [18) from a Unit [1] PSW subsystem.

MQ A.3 Restore DG [1B) SSW 60 days System to OPERABLE status.

B. Required Action and B.1 Declare DG [1B) Immediately Associated Completion inoperable.

Time not met.

BWR/4 STS 3.7-7 Rev 1. 04/07/95

12/05/97 13:24 0319 851 7193 IEs INDUSTRIES @ 010/016 LLS Instrumentation 3.3.6.3 3.3 INSTRUMENTATION 3.3.6.3 Low-Low Set /LLS) Instrumentation LCO 3.3.6.3 The LLS valve instrumentation for each Function in Table 3.3.6.3-1 shall be OPERABLE.

APPLICABILITY: MODES 1. 2. and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One LLS valve A.1 Restore channel (s) to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> inoperable due to OPERABLE status, inoperable channel (s).  %.,

z.

B. One or more safety / B.1 --------NOTE---------

relief valves (S/RVs LC0 3.0.4 is not with one Function 3 i applicable, channel inoperable. 6 1 . .:

Prior to pre tches to entering MODE 2 OPERABLE status, or 3 from MODE 4 C. ---------NOTE--------- C.1 Restore one tailpipe [14] days Separate Condition 3ressure switch to entry is allowed for 0PERABLE status, each S!RV.

One or more S/RVs with two Function 3 channels inoperable.

(continued)

BWR/4 STS 3.3-67 Rev 1. 04/07/95  ;

l i

l I 12/05/97 13:24 0319 851 7193 IES INDUSTRIES @011/016 RCS Leakage Detection Instrumentation 3.4.6 3.4 REACTOR COOLANT SYSTEM (RCS) i 3.4.6 RCS Leakage Detection Instrumentation LC0 3.4.6 The following RCS leakage detection instrumentation shall be OPERABLE:

a. Drywell floor drain sump monitoring system: [and)
b. One channel of either primary containment atmospheric particulate or atmospheric gaseous monitoring system:

[and

c. Primary containment air cooler condensate flow rate monitoring system).

APPLICABILITY: MODES 1. 2. and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME

=,..-=.,

A. Drywell floor drain -------------NOTE N ------ .

sump monitoring syste 'LC0 3.0.4 is not applicable.

inoperable. -------------- --------------

  1. ~ -

30 days

_ r h t @-7dd oring system to OPERABLE status.

(continued)

BWR/4 STS 3.4-12 Rev 1. 04/07/95

12/05/97 13:24 C319 861 7193 IES INDUSTRIES @ 012/016 RCS Leakage Detection Instrumentation 3.4.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Required pni.,ary --------NOTE------

containment C0 3.0.4 is not atmospheric monitoring pplicable. '

system inoperable. ------------ ----- --------

B.A .ples Once per of primary 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> containment atmosphera MD 7 B.2 Restore required 30 days primary containment l atmospheric i monitoring system to OPERABLE status.

C. Primary containment C.1 ---------NOTE -------

air cooler condensate Not aoplicable when

- flow rate monitoring required primary system inoperable. containment atmospheric monitoring system is inoperable.

Perform SR 3.4.6.1. Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (continued) -

BWR/4 STS 3.4-13 Rev 1. 04/07/95

12/05/97 13:25 0319 851 7193 IES INDUSTRIES @ 013/016 RCS Leakage Detection Instrumentation 3.4.6 ACTIONS ._

(continued)

C0'?lTION """or0 ACTION COMPLETION TIME 5 Required primary ----------NOTE--------

containment LC0 3.0.4 is not applicable. l atnospheric --------------------------

~~

monitoring system inoperable. O. .

quired 20 days i primary containment i AND atmospheric  ;

monitoring system to I Primary containment OPERABLE status.

air cooler condensate flow rate monitoring 0B i system inoperable.

O.2 Restore primary 30 days containment air cooler condensate flow rate monitoring l system to OPERABLE status.

E. Required Action and E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A. A!iD B. [C. or 0] not met.

E.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F. All requireC leakage F.1 Enter LC0 3.0.3. Imediately detection systems inoperable.

BWR/4 STS 3.4-14 Rev 1. 04/07/95

18/05/97, 13:35 C319 861 7193 IES INDUSTRIES @ 014/016 m

I

)

l cts 3.s.t-+

I l

P i

l d

a 1

4 em *

, , , , _ . . _ __ - -- --r---='- --

12/0s/s7 13:25 0319 851 7193 IEC IND STRIES .$015/016

,CT5 '3.1.1-M ... _ .

'TkL '?4>$tuer . %s 4.5 N uJ N

& Cf5 h h .TJ5 &

. .... M b n C _.. h 1. C.D 3 T..l j 6 W.bsis % Ka. " ls A .

pssua..s.cAs '.'. . peb. p c.rs 3 a . A. a. c. . m M.q,

.. ...t.4 % . 4n d . % ' m

  • p gzo , cdQ k pw:Ax. .L s e c. k e n . 64 W & .9 sed ewy4Lnaim

..k..uc L.t... Ek e ,..ca d 6 M yJ. A f &.

. . . . odh.q. epa 4.D.oC.L..IMao h ySSR N. CT54 .

Ir4.. comp clac.Arb,.bd b jE4 & rel*44 A

. L -h. . e; b .

Ine. % M tc<. (crs) 6 .12 bcs.

._...CCfd.) % .

M._  ; 3 E59.5_MS M rAop j -Sa. CJS W.h'%

-h (M w.hglli. 'wvretMfeb"lnmedia:h"

. . . . _ . . -fee..ML caosWOim ),

. h e. & ..'. S % s N & 'r:TS 'QQ kch% d

. . ~ . . . . .

%.W ~77+ 9 % -\4-a. C'f5 &%

. .l.. 0 s3 (L'tsk Cub,b .fv- Opu d M ,.

- M h ; 'L %. d M M % .t4.n. g (&

- . . . . . . " Lao. pe.s:w. sc.c.s " rsr Ab .

s .t.#.uc.g c;Q .

. . M 9.7. A..L..b M . %7's

  • Adh C.. l hbyk., O dc.h6 -

{ %det.d,

12/08/97 13:25 C319 851 7193 IksINDUSTRIE3 PJ016/016 Cars 3. g.1 - y ..(Wr.)

w n @ (.e.4')- LQls). "  %- xrs LCn 3. S. l , d lea g4aut. ccca 'o p a a L op J i -

4.t<- 4 q. g Llig a tco3.v.i (et.a.1,z(s). % ,.J (o pss u ec.s 6% " W ve " M L qmd by Ac h s L n..no I, z. t a . .rt sbdl

s. u d*1 t d bLn. C E 3 % g - + d F L uk w 6dd 6 & rrs, 6 . a

- v lo4 (if.R4 M 6CCS UY h U

Q .A %.%<.' s4d b % -4.

A & c..t ; q s k s p b p

. made 1,43 e eso .sygeM h 4.

<w AC M (e_4., %L% , 5675, tctV=,dt..).

6'.4e 4 e- 4 6,e i

9* 9  ? g ,

e a

~ ~'

12/05/97 13:28 Q319 851 7193 IES IND1?STRIES IB002/016 _

DISCUSSION OF CHANGES ITS 3.8.1: AC SOURCES - OPERATING TECHNICAIJHANGES - LESS RESTRICTTVE Li CTS 3.8.A.2.a (one offsite power source inoperable) requites the verification of the Operab:lity of the other offrite power supply and both <mergency diesel generators. CTS 3.8.A.4.a (one DG inoperable) and CTS 4.5.G.1 require the verification of the Operability of the other DG and all low pressure core anA -

_ containment cooling subsystems supported by the Operable DG.fCTS 3.8.A.2.c

[ with both the startup and standby transfonners inoperable the Operability of 61 Low Pressure Cooling Systems (i.e., LPCI and CS). CTS 4.8.A.I.b, with both startup and standby transfonnen inoperable, requires verifying thath y"_ all low pressure core coonne and containment cooline subsystems are Operable (CTS 4.5.G.1).fCTS Definition 1.0.3 requires supported 1 rfeatures toi be declared inoperable when its normal or emergency power source is J l inoperable if a redundant feature is known to be inoperable.. This declaration of]

[inoperability is implicitly required immediatflyJ C1 s 3.8.A.2.c and J.a.t. .1 require the plant to biin Hot Shutdown withm 12 hou s and in Cold Shutdown within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when a DG or both offsite circuits are inoperable concurrent with a required feature (i.e., system, subsystem. comnonenn inoperability. Under te same cond_itions111S 3.8.1, Required Action C.1 allows I 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> pnor to declaring inoperable iliose reouired feature (s) supported by thh inoperable offsite source when the redundant required feature (s) are inoperable.Vn addition, Required Action B.2 allows four hours pnor to ceclarmg moperaote -

, those required feature (s) supported 3v the inoperable DG when the r_edundant required feature (s) are inoperable.Ehe addition of the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 7 allowances in the ITS is consioded less restrictive.

Extending the Completion Time from Immediately to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and 4_ hours, )

respectively, for moperable ortsite sources and diesels when redundant supported

features are known to be inoperable, will allow the operator time to evaluate and l correct any discovered inoperabilities. This will reduce the risk of subjecting the unit to a shutdown while the redundant safety features are inoperable. This change is acceptable because the remaming Operable power supplies are adequate to supply electrical power to the onsite Class 1E Distribution System. Thus, on a I

component basis, single failure protection for the required fee.ture's function may have been lost; however, the function has not been lost. The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Times take into account the component Operability of the redundane l counterpart to the inoperable required feature. By allowing features associated l

P 1

DAEC 7 L-vision C l l

12/03/97 13:29 0319 651 7193 IES INDL'STRIES 2003/016 _

l DISCUSSION OF CHANGES ITS 3.8.1: AC SOURCES - OPERNITNG TECHNICAL CHANGES - LESS RESTRICTIVE (continued)

Li with the inoperableM offsite circuits to be declared inoperable, the (cont.) appropriate, Actions in their respective TSs can be takert. guwuvamy, mc

_ . , _ . _ ..._ r _ - a m.., .moonlity of th+ remaining AC sources, reasonable time for repairs, and low probability of a DBA occu: ring during this period. Therefore, this change is acceptable.

L2 CTS 4.8.A.2.a.l.b requires monthly DG testing at rated load. ITS SR 3.8.1.3 l specifies the DG be loaded greater than the assumed accident load. Since the assumed accident load is less than the DG rated load, the ITS allows the SR to be performed at a lower load. The proposed change is acceptable because it will remove cxcess conservatism while preserving necessary testing to ensure that accident loading requirements can be met. This change is in accordance with the NUREG.

L3 CTS 3.8.A.2.c contains Required Actions with both required offsite sources inoperable. These actions require immediate restoration of at least one offsite source or to be in Hot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in Cold Shutdown within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. ITS 3.8.1 Required Action C.2 allows 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to restore at least one offsite source when both are inoperable. CTS 3.8.A.4.b contains actions when both of the emergency DGs are inoperable. The CTS for this case, requires immediate restoration of at least one DG or to be in Hot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in Cold Shutdown within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. ITS 3.8.1 Required Action D.1 allows 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to restore at least one DG to operable status.

ITS Required Action C.2 Completion Time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> recognizes that the offsite electrical power system is not available to effect a safe shutdown and to mitigate the effects of an accident; however, the onsite AC sources have not been degraded. The remaining two operable DGs are available to maintain the unit in a safe shutdown condition in the event of a DBA or transient. ITS Required Action D.1 Completion Time of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> recognizes that the offsite electrical power system is the only source of AC power for the plant at this level of degradation, and that the risk associated with continued operation for a very short time could be less than that associated with an immediate controlled shutdown. Since an DAEC 8 RevisionC l

% b e

12/05/97 .13:29 @319 851 7193 IES INDUSTRIES @ 004/016 i

-TC Sources ~0perating 3.8.1 ACTIONS CONDITION REQUIRED ACTION i

COMPLETION TIME B. u:entinued) B.3.1 Determine OPERABLE DG 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is not inoperable due -

to comon cause '

failure.

B.3.2 Perform SR 3.8.1.2 '9 f

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />

. for OPERABLE DG. .

AND 7 days B.4 Restore DT.to -

OPERABLE status. . , ,

}AND 8 days from

' discovery of I

failure to for meet f

^ '

C0 except ondition A C.

x.-

Two offsite circuitsN h1 fuelarFirequireil inoperable. 62hoursbrom Daarure(silinoperabl when tae redundant ciscovery of Condition r l CI

_f required feature (s)

...are inoperable.

concurrent with l y inoperability of

' ~ .

.x redundant required .

feature (s) d T

eum f

C2 A

n05 Restore one offsite circuit to OPERABLE status.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND 8 days from discovery of failure to meet LCO except for Condition A (continued)

DAEC 3.8-3 Revision A

~ ' ~ ' ~ ~~ ~

12/05/97 13:29 C319 851 593 IESIIlDUSTRIES NiOOS /ol8' i

bot 3.B.l Spe.c.ihia:f&ns I.ofz),jfj y,2.

jaO V52 AMb hPftTCA M M h

^

u e -s

!AEC*I A

g Pa=f g;,q J- ..

c...m e=% =: = ; = = w - n m ,.==....m L 4. , . . .'n Of = ......~.si. ;,.- -'07 0 M**:" 2.

. tart'\t.!WTT \

.[T$ 'he safety 1 its are limits belov ==nica the etas aole maintenance of ne claddin g,0 5 ano crimary : tems are assures. Exceeding sucn a ':.it reoutres unit snut:own anc review oy tne M lear Regulatory C:entssion tefore re uracticn of unit ootration.

Ooeration oeyone uca a limit :ney act in itself result 'n serious esnstegences

  • Cut it indicates an o rational deficiency sucject t: regula ry review.
2. '.!MtTTv4 SAFETV -.. SETUNG fL55$1 The limiting safety sys settings are settings on instrument ion wnten initiate f tne autenatic aretect1ve ion at a level sucn tnat the safety imits will not se '

exceeded. 'hese settines ate into cor; sideration tne instrtssents on tolerances and the instruments are e tred to se seriodiestly calibrated as s cifies in nese Tecanical Specif1Catic . The limitinc safety system setting lus tne

1erance of the instrument eiven in the systen easign control gives t , limiting tris point for os ation. This aeditional margin nas b estselished so nat witn proper *.ooeration o the instnanentation the safety limits 11 never be cested. The' ineoutlity $1 wnten may be given merely signifies the referres dire ion of operational trip sett ng.
3. L!Mt MG CONDT7045 FOR OPf4 ATTOM 1.t01 The limitin conditions specify tne min i\ accestante levels of systes performany necessary ts sure safe startvo and coers ion of tne f acility. When these s concitions a met, tne clant can ne coerst safely ans anner sal situations can o afely c3ntroll . N Ghen.a system, suasysten, train, cgeponent me cevice is determined to be inooerasle Q[p solel because its Lnorma power source __is ency power's_ource is bemersole. er soleiv because its noser_ tale. Ut may be c:insieeres OPERA 5LE for the pursose ofi LMb, 1sfying the reevirusents of its acolicable Limitir.o Condition for Coeretion.

-i wavidsa- (1) its carrenneneine normal or emereenev_ sower _ Source is OPERABLE: and) g 3.3. l ] 72) all of its esounsant systen(s), suosystant s ), train (s), ::suponent(s) ana l devices (s) are OPERAALE, or likewise satisfy tne recutre!aents of :nis s.inecificatta -

bkt r. Re4 ked' B.2 3 --

~

Ma

-~~- - J OperOkle-dayAc;t C,f[ opera 6%ty

' A. wp 1.0 1 Amenement No. 11a

k. O

~ .- - - . - .. .. - - - .-- --- -.

12/0$/97 13:30 0319 851 7193 IES INDUSTRIES @006/016

$ (M'.C,1 A C, A T"10 n 3.S.!

gCAIC-1

$E!bt; etwbTreM3A_c_A_e_PrnAuch ___ CIT?nvtC!.* AFM sJlletIPIwn.eTO _

3.8 ILIARE LucTAzcm sr IIU 4.

Aoe n eamti h n

' o the aunt try - M(% kvaag wgo A

. 6liee ,.. po.or sy. ..

s e er tvg2, To e are an seequ e supply elects al power for ration those ey ese requires or safety.

neerficatien. 3 .6. I h C. bOVfM.C5- ONU j

. . - - . .. . / _

h P PL.\ i n f5 N i d t: NO M li t . erio3-)

IAt au times when the reactor to

,La the Rup Moes er srAnsw

[g g' b ='8 not in a c0LD ColfDiff ne

\- Q 'IeO h e,

(- Jollowtag AC ele.sracaA p.ieer

,eources anall be OPERABLE: ggg e

1. cstarv.up ca . u .and a .atnaday

. ~ ... transforsere aatu gg.h.C c [ ,, h are avausbie and capable of [

(supplytag _~s..power to the 4kV gg ,y

2. p g .. .Z. I- .

-.h  ;

a. io . o, m .1, m . .ou.... @=0 m' er m sta,rtup or--.

standwr.1a.r._t my g 4 g

,o.ou.coum.._ m em.a.

.r .. . .

[K*:X:'b:"::c .'hW 6 a eme cono 4a

. re o o,,e o, tne o u.ite so ...- ,

l or the startup or standtry . A tranagerners and one eme m e. 1 ,e .. tor m ,rgency .

M 2..) L4Jw M

i. e

.- EN':"&*,'R: nEn;t 6),c** c) - 6 7  % M c Z. /

. o. .t.rt.p a stormers,1 emmle)

.- s- g I

=* C - "ane all Loir- 3 ressure Coo 11aq Systemo OPERABLE R_

kT C j ans ei* han

1) etors maa or both of the gg (, "[

tranafornnes to OPERABLZ etatus ___

- I

2) le an at-least '!OT SMUTDOWN ,G(N, A (.T d.1 6 .

witain the neat 12 house and in g g, MS  !

COLD SMUTDOWW within the

( mf_ollowine_24 hours. p m f.ad V

\ ,

i t

Assendment noJ29.197 J.Bal [

( g6l E. N Oh

12/05/97 13:30 0319 851 7193 IESIhDUSTRIES .9J007/016 m

El . \h f f, }

DAzc-1

^ ~ ^^^^'"^

, ums111ona run v;; -. *vn

_..u,,

45 0 AUXILIARY ELgcTRICAL srsfr.ns Aeolic4 arf 1 ,/*

41..t. . e , ort..i. ..nn,

) equir.

.1..r,mont. of.cth.e austillary

. 1 / ,.co

. .4.mi.e, I

v.rif e otsmAarLITT of the

/\

1 . it et. tric.t .y.to I

k Snecificatient

' ' " * " - - "-~ ^

f.f hl S w se.) - DettsAIn3 g 7

-((% sen'u d,ev.111anceRequixammet.w

r. 1. - y ... j QQ4 Rn Mk

%"D I l -

  • aa '

W h on. of the ofhite .ource.

/ the .tartup or .tandtry or^

% AnO - - -

3 tran.for.or. and one om.trgen

e. 1 cenerater inesor.b1 s = -- son

~

f 14 . 1 alh et sn be ~htt.h.d.N_

b .- With both the startup meditandby)

  1. --forisere inemorahl cua e --

g4g;g::y- _::~ re,.M'ar( - . . 1r .

- {spectficahon 4.5.G.1. hall be ! ,

c p,-

1

..i.f1 4.

S( q.D l As enoment voJ39.197 l

12/05/97 13:31 0319 851 7193 IESINDhSTRIES @008/016 __

l sad.m d.o r6 n 3 8,5

-DAEC1 5 Mn rrdnrridNS TdR OP$TJD@ c5pxvEM AhK'E_RP6NJ ,,,

-- sw,,,om i .- . c a ..

M o _f _. 4witMmv /

CConO 5)

~

(g) D/ith one samma roerumor inoamebinD

~

deserianne asst the OPERARIX KG

@d) 'RU, Aed" 3 3.'2.- Co Act 6.5] m is mas dus _no asummon 4

~

, = = u_

i- a - ' -

w h w Y_4; _ g _

lS @ 2*- .w .

' puummers c - A and esemanumma )

gJ -

d.cza Act- 6.O_

" i coohng C; m agyamd by the m

OPERABLE diname abau be ven6d e L, REO A.4- c If-l\

i i

1, iI i

I Assendamme No. l'".!", 214 3.5 10 l

13/05/97 13:31 S 319 851 1193 IES INDUSTRIES @ 009/016 l

T S 5.Q.l-1

~

t l

l l

l i

l 4

}

l

12/05/97 13:31 0 319 di 7193 IES INDt'$TRIES bb0/0k I

  • l DAEC1 f mmNd CONDmONS FOR OPERATTON 311RVEII.1ANCE REOtfDEMENTS
0. Miniaansmimw Prnsppm Qardinatand G. Mlaimmun Imw Prnanne Coalian and Dianal Gamammaar Availalahty [hamal Gamaalsr Availabilliv l

) 1. During any period %ss one diesel 1. Wsth one diesel genomeer '- ,

J genresar is ! , " _ caemanand ramenor daneramane that the OPERAh!2 diennt i

operosies is persmiemble only during the gemarenor is ses inoperable shes to-

; seven days melans omah diesel cause failues within 24 hoewe and peferun i

pesareter is ensamt usado OPERARIE, Survedlance ?-;_ ^ 4.4.A.2.4.1.a pawridad shes she thing dismal wishin sha Asas 72 beams and every 72' generseer and all kpw prammers esse and banse therenhet. 1a h alllow e.ms nament o aia, skym s. 7; 2. presen. ting and esamism :

l by iba orsRAkts di el gemensor nr. cooling , suppen d by ibe

orERAkti If this reguuemums canaat OPERA 312 damel shall be var:End to be

! he sua, an ordedy SHtTTDOWN oball be OPERABIE.

Imidased med ihn ressner ohn11 he is as Icas HOT 5HITTDOWN wishin the son 12 heure and in COLD ANUTDOWN wishis .,

the ." ": ,24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

2. Amy seeh ofinapmeble va

, is she core and aansainamana eaoling sysasums shall as deinna the capahdity of the roumaining OPERABLE rea= to M the oosting W

3. Whom irradiated fuel is in the resoeor vessel and the renesor is in the COLD 5HITmOWN a=h or REFUEL .

Mode:

)

a. If no work is being H fo. -f dich has the ponemmal for i desaming abe rescem vammel, bash ,

care spray and RHR symans sesy y, s. ,,

y

b. If werk is being yl,, ' whica +

bas the posential for desinant ths  ;<

remsear vemmal. at hat two of any ,

4  %

" of care sprey and/or RER (LPCI or abandown eaaling

, susdn) pm aball be OPERARIX (acauding the cupehnlity to injas water into the rumeur vammal with sucason froni -

the suppresson pool) anempt as Amundeesma No. !M,i". 214 3.5 10

12/0$/97 13:31 0319 831 7193 IES INDt'$TRIEs 2011/016 e

DAEC-1 l LYMf?!NC CONDITIONS FOR OPIRAff 0N SURVTTitANCE RFOUTREFINTS

  • l A> ..

rpecified in specification 3.$.G.3.b(1) and (2), below. A diesel generator required for operation of at least one of these passpo shall be OPERABLE.

y 8jb, -

(1) With one of the two pumps inoperable, restore the IP I" inoperable pump to orrmARLE status within four hours or suspend all operations with a

, potential for draining the g reactor vessel 9 (2) with both ppe inoperable, suspend all operations with a potential for draining the raaetor vessel.

4. During a refueling outage, CORT ALWT1DNS may continue with the suppression pool volume below the minLaum valune specified in l sortion 3.7 provided all of the following conditione are mett (a) The reactor head is removed, the cavity is flooded, the opent fuel pool gates are removed and spent fuel pool water level is maintained within the 1Laits of specification 3.9.C.

(b) At least one core Spray pump capable of transferring water to the vessel is OPERABLE with suction aligned to the condensate storage tank (s).

! (c) The condensate storage tanks contain at least 15,000 gallone of water which is available to the core spray subsystes.

I condensate storage tank (s) level shall be recorded at least every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(d) No work is being performed which has the potential for draining the reactor vessel.

l I

t AMENDMENT NO. Ff,777,77f,201 3.5-10a

12/05/97 13:ht C3196517195 IEsINDt!sTRIE5 kO12/016 AC Sources-Shutdown 3.8.2 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources -Shutdown LC0 3.8.2 The following AC electrical power sources shall be OPERABLE:

a. One qualified circuit between the offsite transmission network and the onsite Class 1E AC electrical power distribution subsystem (s) required by LC0 3.8.8.

" Distribution

b. One Diesel Genirator (DG) capable of supplying one division of the onsite Class IE AC electrical power distribution subsystem (s) required by LCO 3.8.8.

APPLICABILITY: MODES 4 and 5.

During movement of irradiated fuel assemblies in the secondary containment.

1 i

l 1

l l

(continued)

DAEC 3.8-11 Revision A

12/05/97 13:32 0 319 851 71s3 IEs Isot'sTRIEs 0013/016 AC Sources-Shutdown 3.8.2 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One required DG B.1 Suspend CORE Imediately inoperable. ALTERATIONS.

g B.2 Suspend movement of Imediately irradiated fuel assemblies in secondary containment.

B.3 Initiate action to Imediately

c. suspend OPDRVs., .

AND B.4 Initiate action to Imediately restore required DG to OPERABLE status.

=

_SURVEILLN4CE REQUIREMENTS ._

SURVEILLANCE FREQUENCY SR 3.8.2.1 ............ ......N0TE.....-...--.........

The followin SRs are not required to be performed: 5 3.8.1.3, SR 3.8.1.9 through SR 3.8.1.13.

For AC sources required to be OPERABLE the In accordance SRs of Specification 3.8.1. except with applicable SR 3.8.1.8. are applicable. SRs DAEC 3.8-13 Revision A

12/06/97 13:32 0319 651 7193 h5INDt'STR155 7 01'4/056

. Distribution Systems-Shutdown 3.8.8 3.8 ELECTRICAL POWER SYSTEMS 3.8.8 Distribution S ste.. -Shu - _ , _ , , , , , , , , , , , ,

C0 3.8.8 The necessary portions of the AC and DC electrical power distribution subsystems shall be OPERABLE to support equipment required to be OPERABLE. ~

.. ~ .-

APPLICABILITY: MODES 4 and 5.

During movement of irradiated fuel assemblies in the secondary containment.

ACTIONS

..................................... NOTE..........-.........................

LCO 3.0.3 is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Declare associated Immediately AC or DC electrical supported required power distribution features (s) '

subsystems inoperable. inoperable.

?

03 A.2.1 Suspend CORE Immediately ALTERATIONS.

EdiD A.2.2 Suspend movement of Imediately irradiated fuel assemblies in the secondary containment, w - AND . - ..,... . .g-=- --

A.2.3 Initiate action to Imediately sussend operations wit 1 a potential for draining the reactor vessel.

k (continued)

DAEC 3.8 30 Revision A

12/05/97 13:33 C 319 681 7193 IEs INDL'sTRIEs 0015/016 AC Sources-Shutdown B 3.8.2 BASES APPLICABLE within the ACTIONS. This allowance is in recognition that SAFETY ANALYSES certain testing and maintenance activities must be (continued) conducted, provided an acceptable level of risk is not exceeded. During MODES 4 and S. performance of a significant number of required testing and maintenance activities is also required. In MODES 4 and 5. the activities are generally planned and administrative 1y controlled. Relaxations from typical MODES 1. 2. and 3 LCO requirements are acceptable during shutdown MODES based on:

a. The fact that time in an outage is limited. This is a risk prudent goal as well as a utility economic consideration.
b. Requiring appropriate compensatory measures for certain conditions. These may include administrative controls, reliance on systems that do not necessarily neet typical design requirements applied to systems credited in operation NODE analyses, or both.
c. Prudent utility consideration of the risk associated with multiple activities that could affect multiple systems.
d. Maintaining, to the extent practical, the ability to aerform required functions (even if not meeting

() DES 1. 2. and 3 OPERABILITY requirements) with systems assumed to function during an event.

In the event of an accident during shutdown, this LCO ensures the capability of supporting systems necessary for avoiding innediate difficulty, assuming either a loss of all offsite power or a loss of all onsite (Diesel Generator (DG)) power.

The AC sources satisfy Criterion 3 of 10 CFR 50.36(c)(2]ii). ,,, , . ,3, , _ , ,.

w. . .

~

LCO / O'ne offsite circuit capable of supplying the onsite Class 1E power distribution subsystem (s) of LCO 3.8.8. " Distribution

/ Systems-Shutdown." ensures that all required loads are

/ oowered from offsite power. An OPERABLE DG. associated with

/ Distribution System essential bus required OPERABLE by LCO 3.8.8. ensures that a diverse power source is availab,le

-- ~

continued)

DAEC B 3.8-27 Revision A

- .-. -_ -- --______ _~ -- -

12/05/97 13:33 C319 651 7193 IEs INDUSTRIES 2016/016

.,,.,,,. - - e.- - -- . v . = .

LCO 3.5.2 Two low pressure ECCS subsystems shall be OPERABLE.

APPLICABILITY: H0DE 4 MODE 5. except with the spent fuel storage pool gates removed and water level a 21 ft 1 inch over the top of

" essel flange.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required ECCS A.1 Restore required ECCS 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> subsystem inoperable, subsystem to OPERABLE status.

8. Required Action and B.1 nitiate action to , Imediately associated Completion suspend Operations Time of Condition A With a Potential for >

not met. Draining the Reactor [

Vessel (OPDRVs).

I l

C. Both required ECCS C.1 Initiate action to Imediately subsystems inoperable. suspend OPDRVs.

MD C.2 Restore one ECCS 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> subsystem to OPERABLE status.

(continued)

DAEC 3.5 8 Revision A

.-. _ _ - _ . .