ML20203C032
| ML20203C032 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/16/1996 |
| From: | Lieberman J NRC OFFICE OF ENFORCEMENT (OE) |
| To: | Beach A, Goldberg J, Miraglia F NRC (Affiliation Not Assigned), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF THE GENERAL COUNSEL (OGC) |
| Shared Package | |
| ML20203B905 | List: |
| References | |
| FOIA-99-76 NUDOCS 9902110147 | |
| Download: ML20203C032 (1) | |
Text
.
October 16, 1996 MEMORANDUM TO:
A. Bill Beach, Regional Administrator Region III Frank J. Miraglia, Acting Director Office of Nuclear Reactor Regulation Jack R. Goldberg, Deputy Assistant General Counsel for Enforcement Office of the General Counsel FROM:
James Lieberman, Director Office of Enforcement Originals!;nsd By James Usherms
SUBJECT:
01 REPORT 3-96-032; RE: D.C. COOK The above captioned OI report was initiated to determine if an employee of American Electric Power, working at the D.C. Cook Plant, moved a bar code strip on the door leading to the Unit I reactor cable tunnel.
The bar code strip was used by security personnel to validate firewatch tours.
This action could have inhibited security personnel's capability to confirm entry into the area designated by the bar code.
After a preliminary OI review, RIII concluded that, although the bar code strip appeared to have been moved by an individual as a prank, the moving the bar code strip itself was not a violation of an NRC requirement.
The 01 investigation was subsequently closed. Accordingly, I do not intend to request an 0GC analysis of this report. OE will consider the matter closed i
unless we receive a different view within three weeks of the date of this memorandum.
Please contact Mark Satorius of my staff at (301) 415-3280 with any comments.
cc:
J. Milhoan, DEDR R. Zimmerman, NRR G. Caputo, 01
- 8. Burgess, RIII DISTRIBUTION:
JLieberman, OE MSatorius, OE Day file 01 File
/
A /
OE 0:0E k b MSatorius JLifbbman n
10/4 96 10/<;/96'
/
Doc Name:
G:\\396032.MS l
h
~
9902110147 b 208
~ \\..(