ML20203C025
| ML20203C025 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/22/1996 |
| From: | Gray J NRC OFFICE OF ENFORCEMENT (OE) |
| To: | Callan L, Goldberg J, Russell W NRC (Affiliation Not Assigned), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV), NRC OFFICE OF THE GENERAL COUNSEL (OGC) |
| Shared Package | |
| ML20203B905 | List: |
| References | |
| FOIA-99-76 EA-96-178, NUDOCS 9902110142 | |
| Download: ML20203C025 (4) | |
Text
..
y-..
,p i
UNITED STATES s
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3000H001
%,.., g May 22, 1996 MEMORANDUM TO:
L. J. Callan, Regional Administrator Region IV William T. Russell, Director Office of Nuclear Reactor Regulatica Jack R. Goldberg, Deputy Assistant General Counsel for Enforcement -
Of ice of the e al Counsel
- A /,
u FROM:
p
.G y,
puty irector 0 fic of Enfor ment
SUBJECT:
01 REPORT 4-95-004; RE: ARKANSAS NUCLEAR ONE: ALLEGED DISCRIMINATION AND TERMINATION FOR REFUSAL TO FALSIFY STEPS i
The above captioned 0! report involves an allegation that a former employee was the subject of discrimination and was terminated because he refused to sign off on Controlled Work Packages (CWP) used to install fire barrier
- penetration seals as being complete without performing all required work steps. The former employee stated that his supervisor went into his locker and retrieved the CWP, and had a superintendent sign-off as completing the work steps.
A review of this matter by the Region IV technical staff and Regional Counsel determined that the procedure requiring the CWP work steps was not an NRC record requirement; however, the alleger's supervisor admitted that he caused a superintendent to falsify information on the CWP by informing him'that all work steps had been completed which he knew was not correct.
The findings of'the OI report-indicate that some action with regard to the licensee and the individual may be warranted in this case. By copy of this memorandum, I am requesting that OGC analyze the report and determine whether there is sufficient evidence to support regulatory action.
OE has assigned EA 96-178 to track this case.
Garry Harris of my staff has' discussed this case with members of the NRR and OGC staffs and arranged a telephone conference for June 6,1996 at 1:30 p.m.
to discuss the issues. Regional Staff may participate by calling my office at l
(301) 415-2741; those in headquarters may attend in Room 07-H-1.
If there is
- a significar& scheduling problem, please call me as soon as possible as an L
alternate tsme can be arranged..
l l
cc:
'J. Milhoan, DEDR R. Zimmerman, NRR G. Caputo, 01 G. Sanborn, RIV-l 2tt01G MOM 3
~
OUNTER99-76 PDR U fl i
i
._.... ~. -.-
3._
May 22, 1996 Multiple Addressees DISTRIBUTION:
JLieberman, OE JGray, OE Enforcement Specialist Day File.(96163)
OI File OE n /h 00:qE m GHaN k JGrb
!&>Mi 41Lyx Doc Name:
G:\\01194006.MHS s
l l
I l'
I 2
i,.
e i
FAX TRANSMITTAL - ONE PAGE ONLY TO:
br4 Sesdor n FRON:
C nu s/ fo M (301) 415-30 8 0 I
I OE UNDERSTANDING AND EA REQUEST FORM
[
ere Conf.r.nc.:
Poet Conference:
EAYS Date Entry Information Date of Request: b b
Region:
CeeeYype: E Reg.
Contact:
Xso vrd Licensee k
o rC(1 J.At f Cd b /\\ t_' CO Tacility (Unit)/ Location:
O "' f Docket No.:
b Leet Day of Insp. :' h b
Late of 01 Ref.
0: Rpt No.t b/-. W-DO N 2/N)d 0 Rpt Det.:
Confer. nee op.n 7:
l I
N
4 0 eA ed d h cc; d n A % a cc\\ k 0 a n h m A a e c M,' n 4. < < n A m. Ukrk 6he sniM a s %% 1sodAr,uken ce meknd.-ke e haI NA he1 15cde)<.J 85-A M '## M N A renw% mvA n} <dakrM.12ee,id 106 % k%d nrd11
~
O (o - l'78 ES:
GN bd hvo *[ k m.hn'c/ -t*
EA Nuznber:
l ccv
/C1L.DL / /L4 L1 /66NO7 I
Det fP2Nd?11.I /@0li iLL[ // 7 /'&ift47 - E K%hN/ G7PNtM/
$bel5C4 t,flLYW /9(.e/.MLNh5iC4[, /)W.d4/id._
Y'
$&h b
,1f$/ f/
f.
.teile:
i
/!{Y k Af/
Y
/l(YI l
p/Y { Y Y xslou9AdK<.__.
I t
SL Supp Drta11e:
2.
Prior Eeceleted Action?
O No D Yes
- EA:
Date:
3.
Identification? O Lic. Credit c No Credit D Inad. Info O NA Commente:
4.
Corrective Action?
D Lic. Credit D No Credit O Inad. Info Consnente :
S.
Enforcement conference Needed?
No D Yee Commente:
6.
Discretion or Order Needed?
[No D Yes Commente:
7 Action?
DJutunittoOE E Regional Acti n
. O Cho e Lettpr Q EDO Review 0 Coanniesion j c Disagreement 0 Other:
f/# VYGd D Y n4 P_r4 y
/tl410 '
80rY
. 7_LiMMA ff 00M f f v#
6.
CP? O No CF 0 Base CP O Double Bees CF 0 Other:
9.
Willfulness involved? D No O Yes D 01 Coordinated D Neede O! Coordinetton l
'rogram Office Represented?
O Mo O Yee
- 11. OGC Represented?
O No 0 Yes Conssente :
AN/ tr 4/ C JAA CQ/h M KAA tt L 13.
Approved:
/
\\.
A aca,n o w M i L 4sa J
'l'/7/y4
\\\\
work pod A7 documnkeAkJ
- ESK FOR PUBLICNSCLOSURE WIm001 APPROVAL 4F THE-DIR5tTOR'Ot ****,
w
Y.
4 E
UNfTD STATES 5
I NUCLEAR REGULATORY COMMISSION
\\s,~ ~ ',/
WASHINGTON. D.C. 20liti64001
- d n &
~, m
'a m4 N 3
~
g /m j,,
se en s or /er + s,_,y Ad&*
g ce (d-m/ ch/es)
W
~
J r
g/J b
w g M
&^
a m p A~-
y j& & #
~
a y a _ a - 2,~us
& ~f y
- p y
A~' 5, # &f, e yfu os h f W
- M ud$
>>su-c AcdAlb bA~'
g
%y----
MG QfWS&
-