ML20153D478

From kanterella
Jump to navigation Jump to search
Opposes Licensing & Operation of Plant Due to Defective Seismic Const,Use of Outdated Seismic Criteria in Control Room & Incomplete Evacuation Plans
ML20153D478
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/12/1982
From: Holtz R
AFFILIATION NOT ASSIGNED
To: Gilinsky V
NRC COMMISSION (OCM)
Shared Package
ML20151Y970 List: ... further results
References
FOIA-87-444 NUDOCS 8805090162
Download: ML20153D478 (1)


Text

,..

/

's i,

250 Ranchito Lane San Luis Cbispo, California 93401 January 12, 1982-i Mr. Victor Gilinsky U.S. Regulatory Comission l

h'ashington, - D. C. -20555 Dear Mr. Gilinsky i

On January 19th the Nuclear Regulatory Comission has scheduled tull-newer Hearings for the Diablo Canyen Nuclear Power Plant.

In light of the hard evidence of defective seismic construction of the plant, the use of outdated seismic criteria in the building that houses the reactor control rooms, and evacuation plans for San Luis Obispo and Santa Barbara Counties which are incomplete and do not in any way address the possibility of an earthquake and a Diablo radiation leak occuring simultaneously,.it is difficult to believe that a Comission with its cheif responsibility.

being the safety of the people, would consider this action.

If you do continue with this procedure en the date set, the oceple

[

cf the counties involved can only assume that you wish to get the Plant on line at any cost without regard to the censequences.

l Very sincerely, g

Ruth L. Holta

.i i

i

/b'

-l 4

l l

l l

8805090162 890418 i

PDR FOIA 1

HAMLIN87-444 PDR i

i