MEMORANDUM FOR:
C. J. Anderson, RI V. Benaroya, URR T. E. Conlo7, RII C. I Grimes, NRR W. S. Little, RIII Y. A. Moore, NRR S. D. Richardson, IE W. M. Shields, ELD FROM:
F. Rosa, Chainnan Fire Protecticn Pclicy Working Group
SUBJECT:
PROPOSED CHANGES TO THE STANDARD TECHNICAL SPECIFICATIONS ON FIRE PROTECTION i.
As agreed to during our meeting on November 16, 1984, some of the Bethesda based members of the W. G. attempted to revise tne W Standard Te inical Specifications (the CRGR package version) to incorporate all of the coments from the W. G. into a single document. The results of this effort are pro-v'ded in the markup of the STS (Enclosure 1). We have also prepared a draft memorandum to the Steering Comittee (Enclosure 2) transmitting a final re-comended revisions package.
(
Please review and ccm ent on the proposed STS revision and on the conclusions and recoment.iations contained in the draf t memorandum. I would like to obtain a W. G. consensus on this, difficult as this might be. Therefore, to the l
extent possible, please frame your coments in terms of specific word changes and identify those deemed essential for your concurrence on the final package.
Your coments are requested prior to January 4,1985.
I have designated Chris Grimes as the Acting Chairman of the W. G while I am on annual leave during the Holidays. Please send your coments to both Chris and myself. A full W. G. meeting to consider the. final package is tentatively scheduled for Jan. 10-11, 1985, so keep the dates open.
Best wishes for the Moliday Season, and may you find an identical draft copy of the perfect STS on Fire Protection in your stocking on Christmas morning.
Faust Rosa, Chairman Fire Protection Policy Working Group
\\Znclosures:
stated' cc: See attached list s
~
{
{
}
f'Q %, g wl4 V C /
cb Rl'
()G/ff
/.
I
f n
Var. Addressees.
cc:
R. H. Vollmer J., N. Grace, IE T. T. Martin, RI W. J. Olrastead, ELD J. A. 01shinski, RII R. L. Spessard, RIII T. War. bach E. Butcher
- 0. Parr J. Wermiel R. W. Houston (w/o enclosure) j l
l 1
\\
l
~
h
,sfA/CL OS//tg j
{khk W
_4 II:57Rt! MENTATION I
l O
l 9/ %4.h.,q M i
g FIRE DETECTION INSTRUMENTATION.
$2
(>
- 6 D O o p C % O 6 E S l
.IMITING CONDITION.FOR OPERATION 3.3' B.8 As a minimum, the fire detection ' instrumentation. for each fire detection zone shown in Table 3.3-11 shall be OPERABLE.
APPLICABILITY: Whenever equipment pretected by the fire detection instrument is required to be OPERABLE.
)
ACTIO" Ep1hoort or l
c.
Wit 5 any h.
ML.M-.asrf thaAon/
Eunetww# fire detection irdtruments shown in Table 3.3-11 inoperable,,
restore the inoperable in ument(s) to OPERABLE status within W 6 stablish a fire watch patrol to inspect the zone (s) with the inoperable instrument (s) at' least once per hour, unless the it'strument(s) is located inside the containment, then inspect that containment zone at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (or monitor the containment air temperature at leart once per hour at the locations listed in.
Specification 4.6.1.6'-
b.
With more t1 one-half of the Funct' n A fire' detection instruments in any fire 20.
shown in Table 3 -11 inoperable, or with any
(
Function B fire
'ection ins
.,ents shown in Table 3.3-11 inoperable, or sith any two or re ad' oent fire detection instru.se'nts shown in i
Table 3.3-11 inoperab ithin 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a fire watch patrol to inspect the zone (
w.
.the inoperable instrument (s) at least once per hour, un
.s the i trument(s) is located inside the contain-ment, then ins
.t that conta ment zone at lea'st once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (or monitor + e containment air emperature at least once per hour
(
at the locations' listed i'n Specif.ation 4.6.1.6).
__y w
b /.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE REOUIREMENTS 4.3.3.8.1 Each of the above required fire detection instruments which are accessible during plant operation shall be demonstrated OPERABLE at least once per 6 months by performance of a TRIP ACTUATING DEVICE OPERATIONAL TEST.
Fire detectors which are not accessible during plant operation shall be demonstrated OPERABLE by the perfomance of a iRIP ACTUATJNG DEVICE OPERATIONAL TEST during each COLD SHUTDOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the previous 6 months.
4.3.3.8.2 ervised circuits w r i: br[ associated with the detector alarms of each of the above required fire detection instre ents sna11 be cemonstrated 0?!RABLE at least once per 6 months.
J.3.3.8.3 The nonsupervised circuits, associated with detector alarms, between the instrument and the control roc. shall be demonstrated OPERAELE at least ente per 31 days.
W-STS 3/4 3-68
" - '. ~
i
't
. a.
TABli 3.3-11.
l FIRE DECTECTION INSTRUMENTATION g
TOTAL NUMBER-
~
INSTRUMENT LOCATION g
OF INSTRUMENTS ty J 1
'j (11)ust.rative-)
HEAT FLAME SMOKE;
{p (x/y)
(x/y)
(x/y) 1.
. Containment #.
O L Jgf a.
2ene'l Ele'vation b.
Zone 2 Elevation
-'Q gn 2.
Control Room Vb*
g 3.
Cable Spreading Vo-r C.,t y
a.
Zone 1 Elevation
.D g b.
Zone 2 Elevation
.. E,. g o
4.
Co:puter Room. 1 E
c
, 5.
Switchgear Room O
U g
y-
]
6.
Remote Shutdown Panels k
C Sd
- 7. ' Station Battery Rooms 4
-]..y.9
=C 8
Turbine Q
7 y
a.
2one 1 Elevation D
3 0 J,
b.
2one 2 Elevation OW $
9.
Diese1' Generator c.
O. ] 3 a;
2one 1 Elevation b.
Zone 2 Elevation _
gd c.]
o 10.
Safety Related Pu=ps
_$.O.]
~
a.
Zone 1 Elevation I O'.
b.
Zone 2 Elevation _
,k g O
'll.
Fuel Storage instro die d h y
a.-
Zone 1 Elevation b.
Zone 2 Elevation
?
(List all detectors in areas re; related equip:nent).
red to ensure ths OPERAB3LITY of safety-a,
j
- (x/y)!! x is number of Function (ear.ly warning fire detection and * '
)
. totification only
/
' y is number of Function actuation of Fire Suppression Systems and early warning and notificationWsuuc.er.ks#
- The fire detection instruments located within the containment are not required to be OPERABLE during the performance of Type A containrent lear, age rate tests.
W-STS
~
3/4 3-65
~~
gjiTSYSTEPS 3/$. 7.11 FIRE SUPPRESSION SYSTEMS '
~
FIRE SUPPRESSION WATE'R SYSTEM g
{ ggg p i.IMITING C NDITION FOR OPERATION
~
3.7.11.1 The Fire Suppr sion Wat'er System shall be OPERABLE with:
fire.pHype54edpumps, each with a capacity of At least (ty )itt) their discharge aligned to the fire suppression a.
(2500) gpet w
- header, t
j
.b.
Separate water supplies, ach' with a minimum contained volume of gillons, and An OPERkBLEi. flow path capable of taking suc' tion from the tank c.
and the '
tank and transferring the water through distribution piping with OPERABLE sectionalizing control or isolation valves to the yard hydrant curb valves, the' last valve ahead of the' water flow alarm device on each s--inkler or hese standpipe, and the last valva aber.d of the deluge vh've on each Delt.ce or Spray System required to be OPERABLE per. Specifications 3. 7.11. 2, 3. 7.11. 5, and 3. 7.11. 6.
dPPLICABILITY:
At all tices.
~
- K ACTION:
k With one pump and/or one water supply i'noperable, re, store the inope'r-a.
able equipment to OPERABLE status within 7 days.or provide an alter-nate backup pump or supply.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
b.
With the Fire 3uppression Water System otharwise inoperab.le establish a backup Fire Suppression Water System within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
O
- j T
i W-STS
.3/4 7-30 l
p....
-,..,,_.,.----,.-w
_---e,
._---~.-a,,
,-n,
g.
s i
{ s 4 ' plain SYSTEMS I
SURVEILLANCE REQUIREMENTS 1
7
- 4. 7.11.1.1.- The Fire Suppression Water System shall be demonstrated OPERABLEr w
, 'a.
t l' east once per 7 days by verifying the contained water supply
- volume, b.
At least once per 31 days on a' STAGGERED TEST BASIS by starting each tiectric motor-driven pump and operating it for at least 15 minutes en recirculation flow, At least once per 31 da,vs by verifying Gat each valve (manual, power c.
operated, or automatic) in the flow path is in its correct position,
- i.v sW
~ d f.
At least.orice per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel,
\\
C/
At least once per 18 months by performing a sys' tem functional test which includes simulated automatic actuation of the system throughcut its operating sequence, and:
1)
Verifying that each ' automatic valve in th'e flow path actuates to its correct position, 2) f u
e s
- pppt, gg-3)
Cycling each valve in the flow path that is not testab1'e dur'ing plant operation through at least or}e complete cycle of full' travel; and, f ) fer ying at e ch fi suppr sion
.ps rts uen ally) 4
(/
maint n th Fir uppres on W er.Sy em sure reattr' han equa to psig.
/
f f
At least once per 3 years by performing a flow test O the system in accordance with Chapte'r 5, Section 11 of a Fire Protection Handbook.
14th Edition, publis M d by the National ire Protection Associatir,n.
qstem.(b.sh and 2
e
+
e I.
),,- STS 3/4 7-31
.------.--...---.ws,,-
w,.,
-*v,..-.--.--e wwew,.ww.-,--
,,---my
,--,w--_w.---...----~e.-,-m
- w. -..u -
(
3 idSErtf p_.3/ 4 _.'7.-31
. _ _._N tr [(y s'n g_.. %f-. to.th_.[i e c,... po m p_ 5 t c#ts._ (5tgV e nt
_ _ __._....th rough. Ca3to mo.i's c - o@ Q.PCMon _. Gnd d r3 t U cra_ - l50._
. PCC<2.nT._04..PGTEd.. Ca@CC N C d.. Q O Y.. I C t h-T h G ft._
I,5. pc.r c. cit __ of._. tiri e... toto 3._. t of cd_ h ec.d.... an d.__ _ __..
_.... _. T h c J.. t n t,.
sh ot o-f.l. hec.d. do ts ricrt ex.ce_ed.. _ -.. _.
__.\\ 90. pcreent...of__ c cied. hcod Sor_. split - Co SC._..
.. _ pomps.__. of....
140 eccc enY for. "end - 6c.cr[oO._
pomps, og raf t.d Spec,d.
(rpro).
. (
A..
/
l-Pi.ANTSY. STEMS,'
h.7i'
~
SURVEILLANCE REQUIREMENTS (Co.ntinue'd)
T t
3 4.7.11.1.2.
The fire pump diesel engine shall' be demonstrate 1f OPERABLE:
cu
~
,a., "At, least once per 31 days by verifying:
t 1
- 1)..The. fuel storage tank contains at leas,t gallons of fuel, Cont)OboOSy 2)
The diesel starts from ambient conditions and operates for at' least 30 minutes on recirculation flow.
g b.
j At least once per.92 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTH-D270-1975 is within the acceptable limits specified in Table 1.of ASTM f
0975-1977 when checked for viscosity, water, and sediment; and 5
- g..
At least:ence per 18 months, during shutdown, by subjecting the diesel c.
to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommen,dations for the class of service.
4.7.11.1.3 The fire pump diesefstarting 24-volt battery bank and charger.
shall be demonstrated OPERABLE:
At least once per 7 days by verifying that:
a.
1) k The electrolyte level of each battery is above the plates, and 2)
The overall battery voltage is gre~ater than or equal to 24 vol'ts'.
b.
At least once per 92 days by verifying that the specific gravity is appropriate, for continued. service of the battery, and At least once per 18 months by verifying that:
c.
1)
The batteries, cell' plates, and battery racks show no visual indication of physical damage or abnormal deterioration, and i
2)
The battery-to-battery and terminal connections are c' lean, tight, free of corrosion, and coated with anti-corrosion material.,
)
.g i
r, l
~
h'-STS 3/4 7-32 0
,v--
v,-
,.,,y,,-,,,_.,,-,_,,,,,,.--,_,,,-e,---.%-,
y-
..y,-,
..-,yy.7-,,,.-,,,y
,,,,y.y,,-,-,,,,,,. -.,,,, -,
g- '
him anocIottzd
. q-PLANT SYSTEMS
^
SPRAY AND/OR SPRINKLER SYSTEMS OLto d drcM d i
de,tectors (Tobic O-k
- LIMITING CONDITIO'N FOR OPERATION knNCIk x
/
3.7.'11.7 Thit, following Spray and/or Sprinkler Systems)shall b.e OPERABLE:
(Plant depen' dent'- to be liste'd by name and location.)
a.
b.
c.
{.
APPLICABILITY:
Whenever equipment. protected by the Spray / Sprinkler System is required to be OPERABLE.
f ACTION:
t
@9"9" With one r more of the above required Sp'[ay and/or Sprinkler System's a.
inoperab e, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> e,stablish a continuous fire watch with equip:: ant for those areas in which redundant systems or components could be damaged;,for other areas, establish a t
hourly fire watch patrol.
b.
The provisions of Specifications '3.0.3 'and 3.0.4 are not applicable.
J SURVEILLANCE REOUIREMENTS
~
4.7.11.2' Each of the.above required Spray and/or.Sprin er Systems shall be demonstrated OPERABLE:
At least once per 31 days by verifying that 'each valve (manual,' power a.
operated, or automatic) in the flow path is in its correct position, 1
b.,
At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full. travel, c.
At least once per 18 months:
~-
1)
By performing' a system functional test which includes simulated automatic actuation' of the system, and:
'.c g
.l a)
Verifying that the automatic vahes in the flow path
'l actuate to their correct positions on a test'.
signal, and-
' ~~
f b)
Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle i
, of full travel.
3f4 W-STS
~
-33 "C
'th CY W C.t tI i5 O.V C b tCE.b \\ c h % c.,
by S T C TO.
p,
- -.-.y.
-,.. _ _ _ _...... ~.. _. - _ -
i l ', s ', P. A*.T SYST EP.S 1 l i
.\\
SURVEILLANCE REQU*REMENTS (Continued)
\\:f '
})
By a' visual inspection of the
- Sith?'
beadrWto verify their integ ity; and.
- 3), By a sisual inspection of en nozzle's spray a'rea to verify the spray pattern is not obstr ted.
d.
At least once per 3 years by erforming an air flow test through each open head spray /sprinkl r header and verifying each open head spray / sprinkler nozzle is u bstructed.
J (s,ptern piging 3 honge$ cnd 1
appo etenences n
.(
g s
e O
S e.
1 i,
i 1
h'-STS
,3/4 7 34 9
F e.
ew
. ooo**
- m Me
.W**
,,,n.
, - - -, - -,. -,,, - - - - - +,.,,, -,., - -,, - -. -
--,.-,w-.
Their'c55 obol d '
nAin sysw.S d du ds' $ n ditc O M
,]-
i Mymo CGd C0'2 SYSTEMS k tcCTO M bICD.I* b'%,*
I i
, N
- LIMITINGi CONDITION FOR OPERATION N
.s
(
.r 3r7.'11.3 The following High Pressure and Low Pres.sure CO System shall be OPERABLE:
2 (Plant dependent - to be listed by name and location.)
a.
b.
c.
APPLICABILITY:
Whenever equipment protected by the CO Systems is required to be OPERABLE.
2 ACTION:
With one.or more of the above requ' ired C0 Systems inoperable,.
a.
within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a continuous fire watch with backup fire 2
suppression equipment for those areas in which redundant systems or cc:ponents could be damaged; for other areas, establish an hourly
)
fire watch patrol.
'The provisio.ns. of Specifications '3.0.3 and 3.0.4 are not applicable.
b.
SURVEILLANCE REQUIREMENTS 4
a 4.7.11.3.1 Each of the above required C0 Systems shall be demonstrated OPERABLE at least once per 31 days by ver$fying that each valve (manual, power
{
operated, or automatic) in the flow path'is in its correct position.
4.7.11.3.2 Each of, the above required.kmNkeswel CO S
2 ystems shall be demonstrated OPERA 3LE:
For \\ou>-pet %ut e sgstems,
- a. A At least once per 7 days by verifying the CO., storage.. tank leve f
be. greater than and pressure to be greater than
- psigfand, b.
At least once per 18 months by verifying:
~-
4y gpd eJorm t
1)
The system including valves, associated Vent lation Systemre.r t o c.i s fire dangers, and fire door release mechanism ' actuate manually.
- }
and automatically, upon receipt of a simulated actuation signal,'
'I ud t
,2)
Flow from each nozzle during a Puff Test."-
't) The idtge'its of the ystem pipig., hengers anci opporTen coct.s % ' wsucJ msecetien.
W-STS 3/4 7-35 4
g
___ _. --~._
I i
0 J
e e
.m gwcrt_..p_S_/4.1 'as
.t
._.......,. kc._ hjh - 90t.SSO O t._ SNSTtrOS.. Cd.Ir,c.bT on c.C.
i 3
pr e-. b. mo n.T.h S.-
. 4 r_r s'.
in That 'ft1L__.
r.._..._.-..
e$00ogt _. tcnk_ A.c cd gh.t it of IcG.St_._90 7o..
Oh... (u.u - Ch C.0jC.-. ua t_A ghf._. Gnd.
3
._e_.-__--__..-._-..---....--.....
i.
..f e-
- 1
i l'.[,'PLANTSYSTEMS,"
~
~
t'.
)
SURVEILLANCE REQUIREMENTS (Continued)
[
l 1 3.-
s' "i
4.7.11.3.3.
ch of-the above required High Pre ure CO Systems shall be demonstrate.d 0 ABl.E:
2
~~
a.
At'least'o e per 6 months b erifying the CO stor, age tank wei,ght 2
to be at. lea 90% of full a.rge weight, and b.
At least once per nths by:
\\
1)
Verifying sys m, including associated Ventilation System l.
fire dam rs and fi door release mechanisms, actuates manuall) and a matica11y,,up and
~
receipt of a simulated actuation signal, t
2) erformance of a flow test t ough headers and no nles to assure'.no blo:kage.
~
a 6
I e
e e,
i e
i 3.
1
\\
. s 4
e e
o e
G t
W e
G e
9 O
8 O
O e i
i g
A h'-STS 3/4 7-36 4
sgn= r*
ee.
p.
- ~
~
--r-
,_y.,-
.-.4____,_m.....
.~,._....m_.._._
m,....--__._.--,m.,..
...mm.
.m..
l '.
?
- PLAtiT SYS'TEMS '
stdodig thiir o woact.ted dec. hon Cl[CditS 0.nd i
HALON SYSTEMS d C,t @ 6 c.yf U -H, b h
{
9 j --~.
i
' LIMITING CONDITION FOR OPERATION 1.
3.7,11.4, hhe following Halon System shall be OPERABLE:
(Plant dependent - to be listed by name 'and location'.')
a.
b.
c.
1 APPLICABILITY: Whenever e' qui;, ment protected by the Halen System is required to be OPERABLE.
dCTION:
With oni or more of the above requiied Ha1.on Systems inoperable.
a.
within I hour establish a continuous fire Vatch with backup fire suppression equipment for those areas in which redundant systems or components' could be damaged; for:other areas, establish an hourly fire watch patrol.
b.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicab1e.
SURVEILLANCE REQUIREMENT 5' k
4.7.11.4 Each of the above required Halen Systems shall be demonstrated
~'
OPERABLE:
, a.
At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path is in its correct-
- position, b.
At least once per 6 months by verifying Halon storage tank weight to be at least 95% of full charge weight (or. level) and pessure to be at least 90% of full charge pressure, and Verif iq f
c.
At least once per 18 months by:
1)- eThe system, including associated ventilation System fire dampers and fire door release mechanisms, actuates manually
~'
'and automatically, upon. receipt of a simulated actuatier, signal, by pderming e.,th,ST 2M.PetforsanoewMY1ow test through headers and nozzles to' T
'I issure no blockage.
4 e
/ '6 Y T h t, t rtT bj' k NL $9 bTEM ylp5
, hdO El~D v 150<1I]i05(,a Cfion.
cod cpput-tto C.n c.c,5 'q M-STS 3/4 7-37 mm.
-,,,,-.m.,,m.,_,,
_.,,--.,,_...e.
n
.,,,,,,,,,,._,_mn.,,
,,,,,,,.w,,-_-.,,,,-n,.,.m,-,
l
',.. PLANT SYSTEMS "
~-
l 1
FIRE HOSE STATIONS
-- J LIMITING CONDITION FOR OPERATION 1
3.7.11.5 The fire hose stations shown in Table 3.7-5 shall be OPERABLE.
t
- AEPf.iCAB'ILIT'Y:. Wh'enever equipment in the areas protecterb'y the fire he'se g
stations is required to be OPERABLE.
~
l ACTION:
,'E With one or more of the fire hose stations s.hown in Table _3.7-5_
inoperable.Jprovide gated wye (s) on the n rest OPERABLE hose rstation(s.
One outlet,of the wye shal be connected to the 4
standard len of hose provided for e hose station. The second.
outlet of the sha.11 be connec to a length of hose sufficient
. to provide covera e for the ar eft unprotected by the inoperable j
i hose station. Whe it can demonstratpd that the physical
.gg routing of 'the fire. se uld, result in a recognizable hazard to operating technicians lant equipment, or the hose itself, the fire
)
- hose shall be stor in roll at the outlet of the OPERABLE hose 1
station. Signs all !.e m nted above the gated wye (s) to identify the proper h to use The bove ACTION requirement shall be accomplis within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> if he inoperable fire hose is the primary..eans of fire suppressi
- otherwise route the additional Qose thin 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
(
. SURVEILLANCE REOUIREMEN15
)
4.7.11.5 Each of the fire hose stations shown in Table 3'.*/-5 shall be demonstrated OPERABLE:
At least once per 31 days, by a visual inspection of the fire hose a.
stations accessible during plant operation 3 to assure all. required equipment is at the station.
in occcrdance iulti1 b.
At least once per 18 months, by:
on e,ttcM 5htd Proccd "
J 1)
Visual inspection, of the stations not accessible'during plant operations to assure all required equipment is at the station, 2)
Removing the hose for inspection and re racking, and 3)
Inspecting all gaskets and replacing any degraded gaskets in the couplings.
A.t.ileast once per 3 years, by:
c.
i 3)l partially opening each hose station valve to verify valve i
j
.0PERABILITY and no flow blockage, and 2)
Conducting a
- hose hydrostatic test at a pressure of 150 psig or
- at least 50 psig above maximum fire main operating pressure, whichever is greater.
W-STS 3/4 7-38 4
.D
_,.7_.___m_,_-,
,__,,,,_m,
,,,_,__,.-m,,m,,,,
%,m
~w
4 l
l l
1 m
i
\\
. L S E 2 f__ _...._.
~
...testorr.,..thr.,_ incpte cttiuc._. Stc.t. io n.CU to
. _ _ _ _... O?Et2 AS 5-. u> dhin. 94.. hoort Ot-pro v id c, __ _______
3
__...._ co m pce c.b1c, _ _ sopp r r_ssson. co pcMt Ety._. ULTho _._._.._._ __. _
G.N cc.ted. c.,r ec_65. 3_ c[ter.7 dqs,.estcbhsh
_...._.. C.. C o n Ti n o o O 1 -
t r r.,
u.3cfch pc.t eok in__ Th t,. _..
?
o_N t cf ed.. c.c to. CSD.._ _...... _.._.. __ _
_. =
(
..._.w._.
j
/
\\
l 1
~_
1 g
l'
~
f.
4,
)
TABLE 3.7-5 FIRE HOSE STATI NS
\\
?.
LOCATION *.
ELEVATION IHOSE RACK f 1
1 1
t i.i
\\
l 1
m..
l
~
1 l
l
. ~ -
. t.
"List all FiYe Hose Stations required to ensure the OPERABILITY. of safety relatid equipment,.
a W_-STS 3/4 7-39 p.g
\\
s.
l
- 4 l PLAT (T SYSTEMS '
~~
f ~ '
YARD FIRE HYDRANTS AND HYDRART. HOSE' HOUSES L]MTTINGCONbfTIONFO'ROPERATION
\\
3.7.11.6 The yard fire hydrants and associated hydrant hose houses shown ir.
Table 3.7-6 shall be OPERABLE.
APPLICABIllTY:
Whenever equipment in the areas protected by the yard firi hydrants is required to be OPERABLE.
ACTION:
With one or more of the yard fire hydrants or associated hydrant a.
hose houses shown in Table 3.7-6 inoperable, within I hour have
{
sufficient additional lengths of 21/2 inch diameter hose located in.
an adjai:ent OPERABLE hydrant hose house to provide service to the unprotected, area (s) if the inoperable fire hydrant or associated hydrant hose house is the primary means of fire suppression; otherwise, provide the additional hose within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
i
' SURVEILLANCE REOUIREMERTS 4.7.11.6 Each of the yard fire hydrants and associated hydrant hose houses
- s shown in Table 3.7-6 shall be demonstrated OPERABLE
3 in ceccedonce. u.nm on esTc' chshed pr..ocedotc.,
J s
a.
At lea once per 31 days, by visual inspection of the hydrant hose house, o assure all required equipment is at the hose house.
b.
At least once per 6 months (once during March, April, or May and-once during September, October, or November), by visually inspecting iach yard fire h drant an'd veri.fying that the hydrant barrel is dry and that the hydrant is not damaged, and c.
At least once per 12 months by:
2)
Conducting a hose hydrostatic test at a pressure of 150 psig or at least 50 psig above maximum fire main operating pressure,
~
whichever is greater, i
2)
Inspecting all the gaskets and replacing any degraded gaskets in the couplings, and i
3)
Performing a flow check of each hydrant to verify its OPERA 3ILITY.
j 3
/
}j-STS
. 3/4 7-40 4
~ ~ -
j.
-y
,I. s s
i TABLE 3.7-6 l
.?
YARD FIRE HYCRA' TIS AND ASSOCIATED HYDRANT HOSE. HOUSES LOCATION *.-
HYDRANT NUMBER t.'
\\
)
.a
\\
l
~-
.i i
g
.r
=
9 "List all Yaru Fire Hydrants and Hydrant se Houses required to ensure the
.e OPERASILIp of safety rela.ed equipment or' Mo.c.t') itics hoosi
%4t.ti-rtlcLted cro'$
ip m ertt.-
~
}!-STS 3/4 7-41
,. g
-r
._. _... ~ - _... _.,, -. _ _ _ _ _. - _.... _.. _, _.,
4 PLA1!T SYSTEMS' '
I 3/4.7.12 FIRE RATED ASSEMBli'ES
~
a
)t * 'MITING CONDITION FdR OPERATION.'
~
3.7.12 All fire rated assemblies (walls, floor / ceilings, cable tray enclosures
' shd other fi're. barriers.) separating safety-related fire are'as.or separating
~
portions of redundant systems important.to safe shutdown within a fire area and all sealing devices in fire rated assembly penetrations (fire doors; fire windows; fire dampersycable, piping, and ventilation duct penetration seals
'shall be OPERABLE.
L cod APPLICABILITY: At al.1 times.
ACTION:
With one' or.more of the above required fire rated assemb1kes and/or a.
sealing devices inoperable, within one hour either establish a continuous fire watch on it least one side of the affected assembly.
or verify the OPERABILITY of fire det.ectors on at least one side of the inoperable assembly and establish an hourly fire watch patrol.
b.
The provisions of SpeOfications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE REOUIREMENTS
.7.12.1 Theaboverequiredfireratedassemblies and penetration sealing devices shall.be verified OPERABLE:by gesterdag-e/ -
>nsoshPspeetue-c%
8 mo nThs by per4crrrhDj visuo3 in5(>cctionS of:
- o... bn-t r,cs f oncr,per i Jr.
The exposed surfaces of each fire rated assembly,
- l. ).
Each fire window / fire damper and associated hardware, and 3/.
At least 10% percent of each type of sealed penetration.
If apparent changes in appearance or abnormal degradations are found, a visual inspection cf an additional 10% of each type of sealed penetration shall be made. This inspection process shall continue until a,10%
sample with no apparent changes in appearance or abnormal degradation is found.
Samples shall be selected such that each penetration will be inspected every 15 years, b. h+ l e d.St once. per.:n months by Pedormyh odu.nScM tcs.tI of o_t ho st c 0) */s ' of th r.: (ier, dompers Y N.
c.rq '.non-con (or rn-l c.rc -(ound dernp(erS an c.dddtEneA lo9e 3
u.n ch c$no_U.y tcSt ed w W be 3is groct SS dtAl ConTi n oc u ntU cn c.tetptol.)t c 3
merge is Sooocl.
San 10\\ct Shol! be se c etecI Soch d
%cd cji C.c ct Sbi.,bda. 3j4gf.S mW W%,.-
w.STS
~
15 e c c5.
y e
+*e*=.a.*eem, e**.*
_m.,,-,_,_.,._,,.--.---,-_~+,-._.%,
~.--me w.~,,m--,
...----_.w.,,.-..,_.,-.,,w,,-m m,,.,
.PL A1.'T SYSTEMS SURVEILLANCE REOUIREMENTS (Continued)
.~
g 4.7.12.2 Each of the above reouired fire doors shall'be verified OPERABLE by:
rinspecti the. auto:atic hold-open, release and osing mechanism and latches
~
at least o per 6 months, and by verifying:
a.
The OP BILITY of the fire do.o supervision system for each~
l l
elettrica supervised fire oor by performing a TRIP ACTUATING DEVICE OPERA NAL TEST a east once per 31 days, b.
That each locked ci fire door is closed at least once per 7 days, c.
That' doors wit automatte h - -open and release mechanisms are free of cbstructi s at least once r 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and a functional test is perf or-at least once per 1 inths, and d.
That ch unlocked fire door without e trical supervision is osed at least once per 24: hours.
- o.. h+ 1 c c.sr o n c c p c.c B 4 hoi.> rs 9 cr'ih ibcf doors u.s.Th 3
o.oro m es c hold -open catd rcJ cc.sc rnr_chenthrns c.r e, 4ese of obsieocrions cLnd thcr un1oek.cd fiEs doors
(
c.c c closed i toithcot ci t.ctr tecd sope ro i s't on
~
- b. k+ Icost once per 7 do.3s, utMy mc3 cc.ch lockd -
Clostd bro decr is lock.c.d cJid closc2 *>
C.
ht i ec.st once pte h dc.is pteform c.
U2.lP 3
klTO hTlVC:3 9EVICE OPE 2.b Ti o O b.L. TE sT for to.ch cl eCtrt c.c.ll, - Septrvi scd b re door; i
d.
ht lec.st once per b merttas, visbedly sns.p tct hold - open, rt ec.se. c.nd clos %
the cao mofic l
mt chc.n ssms c.nd
\\ arche.s, i n c.cc or d c.n c.c.
wNM esto.bb s'n t2 proct.d ores 3 cnd
- t. kt Acc.st once per 8 months ptc4cem c 3
du.n c.tEncd tes+ of cJl hold-open c.nd tt.\\.c.st M tch c.n t SM S.
t va.sn 3/4. *1-43
i l
~5 l 4.. ~1. t'S d ld-Po2TASt E FtRE Ev.Ti U Go 1 Sl-lE25 WD
~
EM ET2. GE O CM L.1 G n.l T i 9 Cm u
The m co ucd de ihtig egoipmenJ consi crutes ihc 4irst idte of d e-fense 4or (nos.t Iiris
(. in cio di ng int cocn ocd sopprr ssico -sidi c.cos sn Sec3 cn 1
'S I 4. 7. t h.
Tvte.
po r tc.b\\ c exxi qoishce s and 5
cmtrgt ocy
,tiehts p rov '.d t:,
mc ope tofor-tu t th c_
g broc4 capob u.Ury to prot ect sc.4 c bf - tc\\ck ed.
e ^gos p en t rtt 4 torn 4 tit.s,
c.casistent with 'th e e
cotec1\\
4Jcc protec} en progccco c.s dcschbed N -iht Fs r t.
Aceto.rd5 kncS'S sis.
\\ d w e n -t b'i s
's
, i nco e r c.6tc, 'it.shcuJd bc ec;os p edtr#
i tepcccd consiste nt
(
pcc enprig reecu.>ud or wtth the d e f en s c. 'i n - d e pT h en t)oco eng -
t e-l
~
~
i I
i l
'~
1 T
._ _..~.
o P NT SYSTEMS Al-TEEM ATistEE /DEO t(.ATED
' '4. 7.13 SHUT 00kN SYSTEM
_.1ITING CONDITION FOR OPERATION Alternarice /Dedica.te.d 3.7.13 The Bhn.%yShutdown System 49E) hall be OPERABLE.
@t
, at Msd M APPLICABILITY: MODES 1, 2, and 3.
Toxi c 'a. 6 - x.,
ACTION:
A%/055 esosprher\\T Ic% thcn. ttr:3 regoteed s'n Tcbic 3.'6-K a.
With the
, restore the inoperable equipment to OPERABLE N within 7 days o he.,46,. + " *2T
_ et ? =+4ESWMOWt wMtrW M
k IRSE.2T
~
fb.
With e to lea ge fr. UNIDE IFIED L KAGE DENTIF 0 LEA GE I
an eac cool t pum seal 1 kage gr ter an 26 m, dec rey e St dby Mak up Pu_.
inope ble an ake wTION a, above.
/
b g.
TheprovisionsofSpecifications3.0.5and3.0.4arenotapplicable.
ElRVEILLANCE REQUIREMEffiS
(-
A. ~1.13.1
.Ac64rW Each hmonitoring instrumentation channel shall be demonstrated OPERABLE by performN ~#tthe CRANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in Table 4.3_.
4.7.11.1 W Each MW transfer switch, power. supply and er eccb refuttin control circuit shall be demonstrated OPERABLE at least wr&g ooTcqc 3
stW by g
ASS ID55 operating each actuated component from the stations I
p
\\.
_7........
. _... _ t SEW._ _. _
... or prodi de co m p e n s c_ tory shot doua n....__. __._._-_.. _
oc.pc.bWt1 cnd restocc the i ncit.co.bt e ego s p io r_nt te opeec_bt o asstWsn
(:o d o.9 s If Th e in optrob(o cqos p men.T is nor rc5 Tore wthi n k do.yt ). be in hot STAMDBi um Mn Th e n ex.T 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> c.n d H o r S H o T O 3 u 3 d _... _...- _
wiWin. Th e bitova?
94 hours0.00109 days <br />0.0261 hours <br />1.554233e-4 weeks <br />3.5767e-5 months <br />..
..i y
i
(
./.
e4ph-..e
.-e-w age.g 4 9
,, -.-,_-_wg,..w,.
,,.-.,__..-m,__-,---.__,-,.,e,-
V MINIMUM V ~ ~.'
i
.s TI IA000T CHANNELS I
~
g INSTRUMEhT_ (111ustrational Only)
XATION OPERA 0LE 1
1.
Pressurizer Pressure 2.
Pressurizer Level 1
1 3.
Reactor Coolant Hot Leg Temperature 1/ loop.
4.
Reactor Coolant Cold leg Temperature 1/ loop
~
5.' Reactor Coolant Average Temperature I
1 W
6.
Steam Generator Pressure 1/ steam generator 1/ steam generator l
3
- 7., Steam Generator Level Z
8.~ Source Range Flux i
1 R
9.
Auxiliary Feedwater Flow Rate 1
I 1
- 10. Condensate Storage Tank Level 1
- 11. CVCS Hakeup Flow Rate 1
S
- 12. Refueling Water Storage Tank l'evel 1
.1 M
TRANSFER SWITCHES (111ustrational Only)
SWITCll
~
~
LOCAT 0N Y
1.
Auxiliary Feedwater Control
^
~
2.
Safe Shutdowri Equipment Power I
Auxiliary Feedwater Chsrging
\\
i Pressurizer Heaters l~
Valves l
'M3.
CYCS Makeup Flow Control
, 4.
Diesel Generator Control l'
4 5.
Electrical Distribution System Coritrol 1
\\
e i
~
9 CONTROLCIRCUITS(111estrationalOnly)
SWITCH
~
LOCATION o' '
1.
Auxiliary Feedwater Flow 2.
Pressurizer Heater's
)
i 3.
CVCS Makepup Flow 4.
Diesel Generator 5.
E'lec.trical Olstribution System i
DtESE.6, 3tsTTEG.tES, 'POM9S, Vb.UJES i
ADD AuO OTWED. EQos9ptEurr PZovt DED
$7Ec; E icA.Ltd Fo72 ASS oZ pss i
1 1
- ,J..l TABLE 4 W % ll 3
ALTERNATIVE SHUTDOWN Jd)Mo<lNb INSTRUMENTATION
" ' '.l SURVEILLANCE REi}UIREMENTS
=
CllANNEL CHANNEL Y
h n'r.MRIN1ENT (Illustrational Only)
, CllECK_
CALIBRATION s
1.
Pressurizer Pressure M
R m
M-
.R W
2.
Pressurizer Level 1
'1.
2 3.
Reactor Coolant Hot leg Temperature M
R t.
n R
0 4.
Reactor Coolant Cold leg Tempe,rature N
E
.M R
- 5.,Re' actor Coolant Average Temperature I
i L
M R
6.
Steam Generator Pressure 2
i R
7.
Steam Generator level lM R
8.
Source Range Flux M
us
- M R
9.
Auxiliary Feedwater Flow Rate
- 10. Condensate Storage Tank Level jM R
- 11. CYCS Makeup Flow Rate
'M R
- 12. Refueling Water Storage Tank level M
R t
i 4
i 4
)
1
g PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 7.13.f he die 1 generator shall be demonstrated OPERABLE:...
a.
. At least once per 31 days by verifying:
1)
The fuel level in the fuel storage tank is greater than or equal to h, and
(
)
2)
The diesel starts from ambient conditions and operates for at least 30 minutes at greater than or equal to 300 kW.
(.
b.
At least once per 92 days,b/ verifying / hat a sample of diesel fuel t
from the fuel storage tank, obtained in accordance with ASTM-D270-1975, is within the acceptable limits specified in Table 1 of ASTH-0975-1977 when checked for viscosity and water and sediment; and c;r rr,c.h rt.f ucJi n oor c,
tet/subjectMhe diesel c.
At least afW-A to an inspection in accordante with(procedures WM WWpMbi.tstnaoufacturer's recommendafions for the class of service.
Ass /OSS V estcb6hed
- 4. 7.'13./kThe battery bank and charger shall be demonstrated OPERABLE:
At least once per 7 days #verifyM that:
a.
1)
The electrolyte level of each battery is above the plates; and 2)
The overall battery voltage is greater than or equal to & yolts.
(. 3 b.
At least once per 92 days by verifying that the specific gravity is appropriate for continued service of the battery, and c.
At least once per 18 c:enths by verifying that:
1)
The batteries, cell plates, and battery racks show no visual indication of physical damage or abnormal deterioration, and 2)
The battery-to-battery and terminal connections are clean, tight, and free of corrosion.
Add LcCh ad AchN /d hm e >,is W
~
oM er A Ss/pss ty med a s oprydrl< te.
y
\\
- z..., g
~
FLANT SYSTD(
m
'6/4. 7. It PORTABLE
- FIRE EXTINCUISHIRS LDfITING CONDITION FOR OPERATION All hand-iteld porEmble fire extinguishers (including water-based types, dry, chemical, carbon dioxide, halon, loaded strema and dry powder extinguishers) shall be f --M:xle OiG hM prolc. cts.OQ c.rto S ContoAnt O4 Sc.2c-W Tdow ny c.s d nsen19 tc4 in tw e Fde. M a% rc S An cJ9 sih APPLICA3Il m : h
\\dhrnacr equipentn.7 in the, protecycc} CLrtaS ACTION:
a.
Wir.h one or more of the above required portable fire aztinguishers inoperable, within eight hours replace with' a portable fire extir -
guisher having the same classification and at least equal rating.
s b.
The provisions of Specifications '3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE REQUIRDEFIS cPE%%t.E
(
Each of the above required port,able fire extinguishers aball be verified to be f b,3 per4ormtnq sorveUIonce and rocinten enec:, in G.cccrdcin ct. L.ut th eticW.,\\bE d procedorc% Consistent Wttt,
{a.
At Isa once per 31 days by visual inspection the portable fire axtingu era accessible during plant operati s to assure operabil-3 ity. The owing shall be =4n4=11y insp ted while condu: ting p')
the surveilla ce
{C (1) Verify ext isher is in its d gnated location and unobstructed.*
that tamper icators are lace, and that the.axtinguisher is not da= aged, d aired,1 airing, under or overchargsd, or has
,g any obvious corro on.
9 3.
At least once per 12 mont by a maintenance inspecti of the I
portable fire extinguish a ecessible during plant operations V
to assure operability. The f loving shall be =4n4=11y inspecte(
while conducting the urveillan :
R A
i (1) Verify gage ovs proper pres e.
Extinguishars not using O
,3 a gagu s be visually inspec for proper level and
- p-3
%c weighed Y
tt
/ "(2) Yus+ne nozzle' and hose or horn for o structions and any p
cracks. Also irarify operability of co=pb ents in those u,
that can be tested by move.nent.
a t$
e e
e
-r y
_-_.--_,_..-_,--.-e
,.-._-...~w,.--
m-
j PIAL' 57 STEMS f'
3/M.7.l 4 l
N DIERGINCY LICRTINC UNITS d
LIMITING CONDTTION 703 OPERATION
~
Stif-demeu.nech bo.itcq-pouaered A11paars'ency Lighting Units 3
.enana shall be Joacetaseke cP Eft.ASLE -
b as d et.cr'ibec) ih Th a Fi re. Ncca.c.eds. Anedy sh,
APPLICABILITY: N4-ha o.n n m ts.
ACTION:
j..
.a.
With one or more of the above required energency lighting units inoperable, within eight hours the unit shall be replaced with a ope able energency lighting unit.
- ,1 b.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
i SURVIII. LANCE REQUIRDENTS
-? "
c.nd maintenchec 3
Each of the above reqrired emergency lighting units phall be etified to be.Juancicart-(oPEthh.E N pericemin Lu N etllC G CC, in acCcfdCOCC.
pth C5tc.bbshed QroctdO PCh C N5thTCflT t,O t.Th The asast once per 31 days by an operational temp (to include a.
t ifying unit operation, electrolyte level 4 position of v
hydr eter discs (lead acid only) of the rgency lighting units a essible during plant operatio to assure their n
operabilit g
At least once p 6 months by maintenance test (to include
-i cycling battery an checkin change-over setting) of the k
emerge:.cy lighting un a ccessible during plant operations p
.to assure their operab ty.
'~)
c.
At least once per months maintenance test of de emergency o
lighting units accessible ring plant typerations to assure O
' their operab.
y.
3 3
d.
Prior to turning a energency lightin unit to functional i
n status loving any event which could a et its operability, j
"repai.*, or maintenance by performance of a anal test
{ tope affected lighting unit.
{
7.-
.7USThICATI'ON FOR REQUESTEChULMCE, V
)
~ - -
4-
.i
',', i INSTRUMENTATION BASES REHOTE SHUTOOWN SYSTEM (Cont %ed) control and power circuits and transfer. switches necessary to eliminate effects of the fire and allow operation of instrumentation' control and power circuits i
required to achieve and maintain a safe shutdown condition are independent of areas where a fire could damage systems normally used to shutdown the reactor.
This capability is consistent with General Design Criterion 3 and typendix R to 10 CFR 50.
3/4.3.3.6 ACCIDENT MONITORING INSTRUMENTATION The OPERABILITY of the accident monitoring instrumentation ensures that sufficient informatio'n is available on selected pla'nt parameters to monitor and assess these variables following,an a'ccident. This capability is consis-tent with the recommendations of Regulatory Guide 1.97, "Instrumentation for Light-Water-Cooled Nuclear Power clants to Assess Plant Conditions During and Following an Accident," Decembef* 975 and NUREG 0737, "Clarification of TMI.
Action Plan Requirements," Novertber.1980.
3/4.3.3.7_ CHLORINE DETECTION SYSTEMS The OPERABILITY of the Chlorine Detection System ensures that su'fficient
' capability.is av.ailable to promptly detect and initiate protective action in the event of an accidental chlorine release.
This capability is required to protect control room personnel and is consistent with the reco=endations of Regulatory Guide 1.95, "Protection of Nuclear Power Plant Centrol Room Oper-ators Against an Accidental Chlorine Release," Febr:,ary 1975.
\\
3/4.3.3.7 FIRE DETECTION INSTRUMENTATION OPERABILITY of the detection instrumentation ensures that 'both adequate warning capability is available for prompt detection of fires and that Fire Suppression Systems, tha' are actuated by fire detectors, will discharge extinguishing agent in a timely manner.
Prompt detection and suppression'of fires will reduce the potential for' damage to safety related equipment and is an integral element in the everall facility fire Protection Program. 7 gg Pb Fire detectors that are used to actuate Fire Suppression Systems represe.nt' a more critidally important component of a plant's Fire Protection Program than detectoir,s that are installed solely for early fire warning and notifica*, :
t rc c CL5%o ca.cLted bepp r e.ssten s e ry).
t E-STS B 3/4 3-5
)
7-...
e
. ~, 4 a
s INSTRUMENTATION Crio o e "T o h t
1 BASES s
t FIRE" DETECTION' INSTRUMENTATION (Con inued).
o 1d he warnnted f*ytrol ss o v_ /
st b nt pVa fij(' watch d
e es blis fanyarf. Ap a re,svlt, the dete sta than i
rii y fi e warn n d The establishment of frequent fire kni Mted g an patrols in the affected areas is required to provide detection capability h
provide o en until the inoperable instrumentation is restored to.0PERABILITY.
LOOSE-PAT <T DETECTION INSTRUMENTATION
,3/4.3.3.9
~. The OPERABAILITY of the loose part detection instrumentation ensures that in the
, sufficient capability is available to detect loose metallic parts The
~ Reactor System and avoid or mitigate damage to Reactor System components.
allowable out-of-service times and surveillance requirements are ' consistent with the recce.tendations of Regulatory Guide 1.133, "Loose-Part Detection Program for the Primary System of Light-Water-Cooled Reactors," May 1981..
... w.
010 ACTIVE _ LIQUID EFFLUENT MONITORING INSTRUMENTAT
,,.'3/4.3.3.30 RA
^
The radica'ctive liquid effluent instrumentation is provided to monitor j
and control, as applicable, the releases of radioactive materials in 1.iquid-The
. effluents' dur'ing actual or potential releases of liquid effluents.
' Alarm / Trip Setpoints for these instruments shall be calculated and adjuste accordance with the e.ethodology and parameters in the ODCH to insure that th The alarm / trip will occur prior to exceeding the limits of 10 CFR Part 20.
OPERABILITY and use of this' instrumentation is consistent with the requirem The of General Design Criteria 60, 63 and 64 6f Appendix A to.10 CFR Part 50.
purpose of tank level indicating devices is to assure the detection.,an of leaks that if not controlled could potentially result in the transport of '
i radioactive materials to UNRESTRICTED AREAS.
\\
RADIOACTIVE GASEOUS EFFLUENT HONITORING INSTRUMEN 3/4.3.3 11 m
The radioactive gaseous affluent instrumentation is provided to monit j
and control, as applicable, the releases of radianctive materials in gaseous The effluents during actual or potential releases of gaseous aff he i l
accordance 'wlth' the metho61ogy and parameters in the CDCM to ensure that Alarm /Tril This alarm /4. rip w8511 occur prior to exceeding the limits i
?
1 concentrations of potentially explosive gas mixtures in the VASTE GAS HOL i
The OPERABILITY and use of this instrumentation is consis I
the requirements of General Design Criteria 60, 63 and 64 of,ppendix A to SYSTEM.
+
s 3/4 3-6 y-sTs
~
4 O ' P.LAtn SYSTEHi
- t
. BASES SNUBBERS (C'ontinued)
'E The service life of a snubber is established via manufacturer input and information through consideration of the snubber service conditions and associated installation and mafntenance records (newly installed snubber, seal replaced, spring replaced, in high radiation area, in high temperature area,,
etc... ).
The requirement to monitor the snubber service life is included to ensure that the snubbers periodically undergo a performance evaluation in view of their age and operating conditions.
These records will provide statistical b'ases for future consideration of snubber service life. The requirements
.I for the maintenance of records and the snubber service life review are not inte'nded to affect, plant operation.
t 3/4.7.10 SEALED SOURCE CONTAMINATION The limitations on removable contamination for sources requiring leak testing, including alpha emitters. is based on 10 CFR 70.39(c) limits for plutonium.
This limitation will.#nsure that leakage fr'em Byproduct, Source,
. and Special Huclear Material sources will not exceed allowable intake yalues.
Sealed sources are classified into three groups according to their use, with Surveillance Requirements :ommensurate with the probability of damage to a
, (.
source in that group.
Those scurces which are frequently handled are required
- 1. to be tested more of ten than those which are not. Sealed sources which are
/
colitinuously enclosed within a shielded mechanism (i.e., sealed sources within,
radiati.on monitoring or boron measurin'g devices) are considere,d to be stored and need not be tested unless they are removed from the shielded mechanism.
~
3/4.7.M FIRF y PRESSION SYSTEMS 1
The OPERABILITY.'of the Fire Suppression Systems ensures that adequate fire suppression capability is available to confine and e/tInguish fires occurring in any portion of the facility where safety related equipment is located. The Fire Suppression Sy. stem consists of the water system,. spray, and/or sprinklers, CO,, Halon, fire hose stations, and yard fire hydrants.
The collective capability of the Fire Suppression Systems is, adequate to -
minimize potential damage to safety related equipment and is a major element in the facility Fire Protection Program.
Q In the eyent that portions of Fire Suppression Systems are inoperable ;
alternate backup fire-fighting is required.Wtm.made seCahW in -
th_e affected breas unti_1 the inoperable equipment is restored to servi _ce. _,
T.' hey's'ths' i p&rabi ire
'ghtin qi'pme L 1s 1 tencto r use s a ba.up rjein o ire s-ress n, a,1 ger pe od of '
e is owed prov e an alter te me of f' e fig ing tii if the nopera e equi ent) the pr..ary n,ta s_ of re supp ession.
/
g-575 a 3/4 7-6 p.=
.._..-.v_.,_
,,..-..__.,__,_,,..,__..m,.
m m u
s I..
(
,}_PLANTSYSTEMS
, 4.. BASES N
FIRE SUPPRESSION SYSTEMS (Continued) t
- The Surveillance Requirements provide assurance that,,th.e minimum OPERABILITY reduirements of_ the Fire Suppression Systems are met. fan low ce is ac for ifsur' g a 'uffi nt lume fH on ip tn ton tora ta s/
v yi ei er e we t
the vel f thrt L el asur..er#
re ade y e' her U.L or. M. aa rove methd.
00 9 In the event the Fire Suppression Water System becomes inoperable, immediats corrective measures must be taken since this system provides the major fire suppression capability of the plant.
a a
3/4.7.12 FIRE RATED ASSEMBLIES j.'
The functional' integrity of the fire. rated assemblies ar.d barrier penetra-
'tions ensures that fires will be confined o.r adequately retarded from spreading to adjacent portions,of the facility.
Thes'e design features minimize the possibility of a single fire rapidly involving several areas of the facility prioY to detection.and extinguishing of the fire.
The fire barrier penetrations are a passive element in the facility fire protection program and are subject
..to' periodic inspections.
Fire barrier penetrations, including cable penetration barriers, fire k
doors and dampers are considered functional _when the visually observed condition is the sa e as the as-designed condition..s/For t e fire trier netrat) s3 "tha re t in the a est d ce ition,) an luatio hall perforr to s
th th modif' a as c)gradf fire' ting o the fir arr V e er During periods of time when a b$rrier is not functional, either:
(1) a continuous fire watc!) is required to be maintained in the vicinity.of the affected barrier, or (2) the fire detectors on at least one side of the affected barrier must be verified OPERABLE and an hourly fire watch patrol established, until the barrier is restored to functional status.
3/4.7.13 AREA TEMPERATURE MONITORING The area temperature limitations ensure that safety-related equipment' will not be subjected to temperatures in excess of their environmental quali-fication temperatur'es.
Exposure to.ercessive temperatures mLay degrade equipment and can caure; a loss of its OPERABILITY. The temperature limits include an allowance for; instrument error of 1 (
)'F.
/
l'-STS B 3/4 7-7 E
.e
.m. e m
.o
.3 8.
.w. -
- _IW5EF,
...._...Tht, c.ctik t,.. c.ssem bb t.5..
(t. 3.., doors.. cnd_ -
._.da m pers.).
c.tt..
per s o d tc cMy..tcsted....to-
... _ _...... d Cm on strodt,... 'T"rit.'t r,..
e c o_VL. l i.t ^.....
3 1.
s
. m
. = - _ _. -
-=._
=___-
i 1
=
j
.s
1 s
1 INSTRUMENTATION i
9 s
BASES
- DEOichTED gggg g.
3/4.3.5 ' ALTER $ATIVExSHUTDOWN SYSTEM SSIDSS eq0tpNied The OPERABILITY of the e ure.s that a fire will not preclude achieving safe shutdown. The
+
6 are independent of areas where 4 fire could damage systems normally used to shutdown the reactor. Thus/ captbility is consistant with General Design' Criterion 3 and Appendix R to 10 CFR 50.
?
9 h compr_ns'esen swordown cc_pa.$tiw provided t.ohr.o m z.
A S S 1 os s
's i in op re o.b t e, driends on
~
AW mt. sez.esGc. equiprat.nt tnes Is inep troh\\e-pro c.ed o res or wed. ol %.'.sec3ch ec. trois-N..
C"PY.'5d
.?.__ f.? v t.de This ccpchi.1/t1
.4 Should bc tc.vi eua ed cnd -opprov ed bg '
y the '(WD-
~
PORC 4
9 i
f.
i ' '.
ADMIN!STRATIVE CONTROLS.
.r I
t
- d.. The perf'ormance of activities required by the Operational Quality
-. Assurance Program to meet the criteria of Appendix "B",10 CFR 50, at least once per 24 months, t,
e.
The Emergency Plan and implementing procedures at least once per
- gmonths, f.
The Security Plan and ir.plementing procedures at least once per gmonths.
g.
Any other area of unit operation considered appropriate by the (CNRAG) or the (Vice President Operations).
.kp.
The Fire Protection programmatic controls including the implementing procedure,s at least once per 24 months by qualified licensee QA personne];
gg
)#.
The fire ' protection equipment and program implementation at least once per 12 months utilizin'g either qualified offsite licensee fire protection engineer or an outside independent fire protection consultant.
An outside independent fire protection consultant shall be used at least every third year;
" * ~ ' "
M + 4a+ " "': x p x t:r th:r ?] : E l ~
(
. AUTHORITY v
6.5.2.9 The (CNRAG) shall report to and advise the (Vice President operations) on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.
RECORDS 6.5.2.10 Records of (CNRAG) activities shall be prepared, approved and dis-tributed as indicated below:
a.
Minutes of each (CNRAG) meeting shall be prepared, approved and forwarded to the (Vice President-Operations) within 14,. days following each meeting.
b.
Reports of reviews. encompassed by Sectica 6.3.2.7 above, shall be prepared, approved and forwarded to the '(Vice President-0perations) within 14 days,following completion of the review.
, Audit reports en' compassed by Section 6.5.2.8 above, shall be forwarded c.
4
, to the (Vice President-Operations) and to the management positions insponsible for the areas audited within 30 days after completion of,:*.
i the. audit by the auditing organization.
l f
e e
9
i ENCLOSURE 2 MEMORANDUM TO: Richard Vollmer, Chainnan Fire Protection Steering Comittee FROM:
Faust Rosa, Chairman Fire Protection Policy Working Group
SUBJECT:
FIRE PROTECTION POLICY WORKING GROUP REVIEW OF STANDARD TECHNICAL SPECIFICATION 5 FOR FIRE PROTECTION k
Ref:
1) 2)
3)
The Working Group reviewed Standard Technical Specifications (STS) taking into g
account coments from Regions I, II and III (Reference 1, ? and 3). The CRGR package version of the Westinghouse STS was used as t'he basis document.
The Working Group atternpted to simplify and clarify the STS and added speci-fications for alternative and dedicated shutdown systems, portable fire extinguishers and ernergency lehting. The rationale for these additions is I
that these features are explicitly included in Appendix R.
The STS as marked I.,
to show the prop,osed changes is enclosed.
- =, -
=e,
- + +
+, - - - -, -
,---------,,,----.--------*w,----err r.
G
- O R. Vollmer,
t The Wor' king Group is not entirely satisfied with its revisions to the STS.
Although we believe the surveillance and LCOs concerning fire protection enhance safety, we are concerned that the way they are presented elevates fire protection almost to the stature of ECCS. However, given the safety signifi-cance of fire protection and the present format of the STS, the Working Group could not come up with an acceptable alternative.
\\
We believe that the technical specification format included in the proposed rulemaking offers a more appropriate way of regulating fire protection sur-veillance and compensatory measures for inoperative equipment. The rule-making (47FR13369, 3/30/82) calls for only the most important features to be included in the body of the technical specifications. The LCOs, compensatory measures, surveillance requirements, and administrative requirements of lesser importance but still important to safety removed from the technical specifica-tions are to be placed in a companion document (supplemental specifications).
The supplemental specification may be revised by the licensee upon approval of its safety comittee. The supplemental specifications and the documentation of surveillance and tests conducted in accordance with the suppleme.ntal speci-
~
fications are subject to NRC inspection.
We recomend that the "r.ew" Tcchnical Specifications include an ahinistrative requirement for the licensee to maintain a procedure for surveillance and compensatpry measures for inoperative equipment. This procedure wCJld not be
3-M. Vollmer I
a part of the Technical Specifications but would be included in and therefore could be revised by the licensee en approval of the licensee's safety comittee without NRC approval. However, the procedure and the records of surveillances and compensatory r.easures could be inspected by the region.
The Working Group recomends as an interim measure that the Standard Technical Specifications be modified in accordance with the enclosure to this memorandum.
We further recomend that when (or if) the new Technical Specification format of the proposed rulemaking is adopted, the detailed fire protection LCOs and surveillance requirements be dropped in favor of an administrative requirement for the maintenance of a procedure for surveillance and compensatory action.
Faust Rosa, Chairman Fire Protection Policy Working Group cc: Steering Comittee Menbers W. G. Members T. Wambach E.Bytcher,
- 0. Parr J. Wemiel
-s---
--,y.
m.
,, -., - - + -,,
,.,,cv,
q,,
UNITED STATis p e g '.," " p. 7 i
[
3,.,,
g NUCLEAR REGULATORY COMMISSION sg jj wasmotoN. o. c.aonee s
S.
DEC 101984 MEMORANDUM FOR:
Victor Stello, Jr., DEDROGR Harold R. Denton, Director, NRR Richard C. DeYoung Director, IE FROM:
William J. Dircks Executive Director for Operations
SUBJECT:
FIRE PROTECTION POLICY STEERING ComITTEE RECOM ENDATIONS In a memorandum dated October 26, 1984, the Fire Protection Policy Steering Comittee provided me with their recomended actions on the fire protection policy and program. Coments on these recomendations have been received from the appropriate program and regional offices. The individual coments are enclosed.
These coments, although generally supportive of the Steering Comittae's work, raise a nunber of serious questions which need to be answered before a na proceed to the Comission on this matter. They are.:,
1.
Are all the recomendations technically justified from the safety standpoint?
2.
Are the resource estimates correct?
3.
How will the inspection program be impacted to the extent that resources will be diverted from other activities?
4.
Considering the current status of fire protection capability at, operating i
plants, does the current risk dictate the reprograming of inspection resources for fire protection inspection?
5.
Is the magnitude of the safety problem comensurate with the proposed actions; e.g., no further schedular exemptions?
6.
Should the revised interpretations and Questions and answers be issued and what impact will they have on the overall program?
7.
Do the recomendations go beyond what the Comission intended in promulgating Appendix R?
In light of the above, I have decided to proceed in the following way:
1.
The Director, NRR, should release the report of the Steering Comittee to j
the PDR and invite coment by interested parties. Coments should be analyzed by NRR with assistance from IE and ELD as needed. This analysis should be provided as part of a Comission paper.
. ~
~
. -. ~. -.. -.-.-
.o
\\
2 2.
The Director, NRR, should provide a quantitative estimate of the public risk associated with fire from operating plants based on their current status; 1.e., incomplete core 11ance with Appendix R.
This estimate should be based on your review of pertinent existing PRAs that have been reviewed by NRC. The ROGR staff should be kept infonned of 2
progress in this area. This estimate and associated basis should be provided in the Comission paper.
3.
The Director. IE, should provide an evaluation of the reprograming of inspection activities that will be necessary in order to implement the 1
Steering Comittee's recomendations regarding inspection. Inspection activities to be reprogramed shall be identified and a basis provided.
i 1his report shall be provided to NRR for the Comission paper and shall be consistent with the results of Task 2.
4.
The Director, NRR, with assistance from the Directors of IE and ELD should prepare a Comission paper that addresses the activities to date and provides specific recomendations for Comission approval. TMt paper should address the specific questions identified above. Target date for providing the paper to the CRGR for review is February 1,1985.
5.
CRGR should review the proposed Comission paper, address each.of the above questions, and make specific recomendations to me not,later than
.'30 days after receipt from NRR.
1 I expect appropriate management representatives from NRR, IE and the Steering Comittee to attend the CRGR meetings on this issue to respond to CRGR questions.
/
\\
i 1
dD William rcks Executive Director for Operations
Enclosures:
As stated cc:
R. Minogue G. Cunningham Regional Administrators
/
'o, UNITED STATES NUCLEAR REGULATORY COMMISSION n
.I wAsmo ton,0. c. soses f
e\\,' My Dec.11, 1984 l
- ..=
NCrIE to:
Faust Ibsa
(
F304:
Bill Sb4* W StBJECT:
P}OPOSED FIJE PR7ECTICN 2EOl SPECS M/ cnly cx2 ment is that scne of the 7tch Spe:s (including the propoed 3/4.7.13 t.14) are rather more philosophical than necessary. See pages B 3/4 3-5,6, B 3/4 7-6,7, for exr:ple. (As an aside, dare did this incr=diMa nir: baring systm ocme finn?) % preference is that Tech Spem state specifically what is required without explaining dry. The dry could go in a backgrtund section screders if "necessary. I see no reasem to add 3/4.7.13 & 14 at all, since it mazely statas the "dafense in depth" principle.
I have no ccr:r:ents en other proposed changes.
Bill -
The Tech Spec numbering sequence was developed as follows: Section 3.X.Y is the set of LCOs for system X and subsystem Y. Section 4.X.Y is the j
surveillance requirements for the same system and subsystem. They are combined into section 3/4 so that the LCOs and surveillance requirenents would appear together for each subsystem.
Section B 3/4.X.Y is the "bases" and provides the background for the LCOs and surveillance for that subsyster; they are not specs and are intended to be philosophical. The specific section you referred to is in the bases.
Chris cc: F. Rosa h