Summary of 880608 Facility Site Visit to Attend Exit Meeting for Insp of Emergency Operating Procedures (EOP) Performed by Assigned Region I EOP Team
ML20150B467
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 06/20/1988
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davis A
NRC
Shared Package
ML20150B451 List:
References
NUDOCS 8807120037
Download: ML20150B467 (2)


Text

_ _ __._ _ ____ _ _

t UIsiTSO aTAft3

\ NUCLEAQ MEGULATORY COMMISSION

, 9 III0loN 911 a

f.  ! 700moostysLTmOAO I st.tN ALLYN. ILUNOl5 64137 JUN 2 01988 .

MEMORANDUM FOR: A. Pert Davis, Regional Administrator FROM: H. J. Miller, Director, Division of Reactor Safety

SUBJECT:

DRESDEN SITE VISIT On June 8, I visited the Dresden Plant to attend the exit meeting for an inspection of emergency operating procedures (EOPs) performed by the assigned Region I E0P team. The E0P inspection identified deficiencies and weaknesses in Dresden's E0Ps that must be addressed by the licensee. However, none of the findings raised imediate safety concerns. Sumary notes from the E0P exit meeting are attached.

While at the site, I toured the facility with the resident inspector, Paul D.

Kaufman. Unit 2 was operating at 90% power while Unit 3 was shutdown in a j refueling outage. I toured the Unit 3 drywell and other contaminated areas as well as readily accessible areas to get a good, overall picture of material cor.ditions. I also visited the control room and spoke to operators. The following sumarizes my observations: .

i 1. While significant progress has been made in cleaning and painting the plant, I noted numerous oil and potentially contam'nated water / steam leaks. There was, for example, significant leakage occurring at the Unit 2 (operating unit) EHC station. A significant amount of EHC fluid was observed standing inside the weir wall surrounaing the EHC pumps and heat exchangers. In some cases, it appears some of the leaks or pumps were actually painted over; the oil leaks have finally worked their way through the paint, however.

2. We noted several deficient situations involving ongoing maintenance. In one insttnce, maintenance was being performed on a flow control valve in a condensate /feedwater recirculation line using hoists rigged from safety related electrical conduit. This repeats a problem which was recently raised by the RI's with licensee management. Another problem involved maintenance being performed on equipment without adequate cleanliness controls (e.g., unattended condensate system flow control valve with bonnet and valve intervals removed without protection). Combined with ,

recent fires, which were attributable to contr.:: tor activities, these situation raise strong questions about CECO's control of contractors doing maintenance and modification work at the plant.

3. From discussions with several operators, it appears that operator morale has improved at the plant over the past year or so. They said they are pleased with steps being taken to upgrade material condition. They said they saw management (e.g., the plant manager) in the plant more of ten 8807120037 880705 PDR ADOLK 05000910

& ' . 4U

e i

A. Bert Davis 2 JUN 2 0 1988 than in the past. However, several nuisance alarms or annunciators and other indicator problems (steam flow and reactor vessel water levels) were pointed out to me by one operator as examples of problems still being experienced in maintaining a high level of material readiness.

4. The control room was quite noisy and not in very good, overall condition in large part because of major modifications being made in overhead spaces.

Modifications underway to improve lighting, altering the ceiling to (among other things) quiet the room, and wall-off the Unit 3 control room, appear to be needed.

Some of the poor housekeeping conditions observed may have been due to the fact that an outage in Unit 2 was just completed simultaneously with the Unit 3 refueling outage sapping plant resources. In any event, the items above present concerns which I talked to the plant manager about.

Separately, and after my visit, the inonthly management meeting with CECO on Dresden was held. The issues identified in my tour were among those discussed.

Specifically, for example, the problem of contractor control was raised. My impression from the plant tour and recent events (e.g., fires, maintenance problems associated with the MSIV failures) is that these periodic visits and canagement meetings are important steps as we follow CECO's efforts to improve

  • r.aintenance and material conditions at Dresden, operating both units at tne same time.

i H. J. Miller, Director Division of Reactor Safety

Attachment:

As stated cc w/o attachment:

J. Taylor NRR J. Clifford, EDO C. J. Paperiello, Rill E. G. Greenman, RIf!

J. J. Harrison, RIII l G. C. Wright, RIII l

W. L. Forney, RIII I 3. G. Dupont, SRI

! P. D. Kaufman, RI i