MONTHYEARML20217D4661995-12-0404 December 1995 Summary of 950911 Meeting W/Commonwealth Edison Re Util Commitment to Improving Dresden,Matl Condition at Zion, Declining Performance at Braidwood & Comed Resources ML20059A6861993-10-0808 October 1993 Discusses 931006 Operating Reactors Events Briefing 93-38 Which Informed Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 930929.Attendees Listed in Encl 1 ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20126K0451992-12-14014 December 1992 Summary of Operating Reactors Events Briefing 92-20 on 921209 ML20217D4531992-03-0606 March 1992 Summary of 920305 Meeting W/Commonwealth Edison Co Re Items of Mutual Interest Re Performance of Utilities Nuclear Power Plants.General Topics Included,Performance of Zion & Dresden Stations ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20058N9711990-08-0909 August 1990 Summary of Operating Reactors Events Meeting 90-20 on 900808 ML20244D2791989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-13 on 890329 to Discuss Events Occurring Since Last Meeting on 890322.Summary of Reactor Scrams for Wk Ending 890326 Encl ML20235V5051989-02-27027 February 1989 Summary of 890202 Meeting W/Prof Loss Control,Util & NRC at Plant Site Re Resolution of Findings During App R Insp of out-of-svc Safe Shutdown Equipment in High Radiation Areas ML20196B9821988-12-0101 December 1988 Summary of Operating Reactors Events Meeting 88-47 on 881129.List of Attendees,Events Discussed & Significant Elements of Events,Two Events Suggested for long-term Followup & Summary of Reactor Scrams Encl ML20150B4671988-06-20020 June 1988 Summary of 880608 Facility Site Visit to Attend Exit Meeting for Insp of Emergency Operating Procedures (EOP) Performed by Assigned Region I EOP Team ML20235Z5891987-10-0808 October 1987 Summary of 871006 Operating Reactor Events Meeting 87-34 Re Events Occurring Since 870929 Meeting.List of Attendees & Presentation Matl Encl ML20237J1221987-08-20020 August 1987 Summary of Operator Reactors Events Meeting 87-27 on 870818. List of Attendees & Viewgraphs Encl ML20214F6731987-05-18018 May 1987 Summary of 870514 Meeting W/Util Re Review of Status of Pending Licensing Actions on Util Plants.Meeting Agenda & List of Attendees Encl ML20207A5221987-05-15015 May 1987 Summary of Operating Reactors Event Meeting 87-13 on 870507 Re Events Which Occurred Since 870428.List of Attendees, Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20215F0151986-12-16016 December 1986 Summary of Operating Reactor Events Meeting 86-43 on 861208. List of Attendees,Events Discussed & Significant Elements of Events Encl ML20214P8971986-11-25025 November 1986 Summary of Operating Reactors Events Meeting 86-40 on 861117.List of Attendees,Events Discussed,Significant Events Data Sheet & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20214P9371986-11-21021 November 1986 Summary of Operating Reactor Events Meeting 86-39 on 861110.List of Attendees,Events Discussed & Significant Elements of Events Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20215G0561986-10-0707 October 1986 Summary of 860911 Meeting W/Bwr Owners Group in Bethesda,Md Re Strawman Generic Requirements for Enhancing BWR Containment Performance in Severe Accident Conditions.Second Technical Exchange Meeting in mid-Nov 1986 Proposed ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20151N3021985-12-19019 December 1985 Summary of 851216 Operating Reactor Events Meeting 85-27. Attendance List,Viewgraphs of Events Discussed,Significant Event Elements,Assignment of Followup Review Responsibility & Status of Previous Assignments Encl ML20205J0421985-11-21021 November 1985 Summary of ACRS 307th Meeting on 851107-09 in Washington, DC Re Review of Application of Beaver Valley Power Station 2,EPA Stds for High Level Radwaste Repository & Investigation of Significant Incidents at Power Plants ML20141E9501985-11-18018 November 1985 Summary of ACRS Subcommittee on Reactor Operations 851104 Meeting in Washington,Dc to Discuss Recent Plant Operating Experience.Fr Notice,Schedule of Discussion & Agenda Encl ML20138P0081985-10-21021 October 1985 Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007 ML20133E4631985-10-0101 October 1985 Summary of Operating Reactors Events Meeting 85-17 on 850923.List of Attendees & Viewgraphs Encl ML20141E5521985-09-26026 September 1985 Summary of ACRS Subcommittee on Reactor Operations 850910 Meeting in Washington,Dc to Discuss Recent Operating Occurrences.Fr Notice,Meeting Schedule & List of Meeting Slides Encl ML20209G6871985-09-0909 September 1985 Summary of Operating Reactor Events Meeting 85-14 on 850826 to Brief Director & Div Directors on Events Which Occurred Since 850813 Meeting.Computer Printout of 1985 Operating Reactor Events Meeting Topics to Date Encl ML20125C5621978-05-0101 May 1978 Summary of 780309-10 Meeting W/Mark I Owners Group in Bethesda,Md Re Changes in Long Term Program as Reflected in Rev 3 to Mark I Owners Group Program Action Plan ML20127A4681978-03-0101 March 1978 Summary of 771129 Meeting W/Mark I Owners Group & GE in San Franciso,Ca Re Listed Topics,Including Results & Bases for long-term Program Decision Point 3.List of Attendees & Viewgraphs Encl ML20148G7781978-01-18018 January 1978 Summary of 780105 Meeting W/Util Re SEP Review of Environ Qualification of Electrical Equipment ML20141N3471977-05-20020 May 1977 Summary of 770411 Meeting W/Mark I Owners Group & GE to Discuss Structural Acceptance Criteria for Mark I Containment long-term Program.List of Attendees Encl ML20125C5711976-09-0909 September 1976 Summary of 760812 Meeting W/Mark I Owners Group,Ge,Epri & Techncial Consultants Re Listed Long Term Program Tasks ML20125C5721976-09-0909 September 1976 Summary of 760819 Meeting W/Mark I Owners Group,(Ge) in Bethesda,Md Re Discussions on Mark I Containment Ltp.List of Attendees Encl ML20125D6581976-08-18018 August 1976 Summary of 760717-08 Meeting W/Representatives of Mark I Owners Group in Bethesda,Md Re Discussions on Reassessed Content of Mark I Containment LTP & Recently Submitted Responses to Questions on STP Final Rept ML20235E9641975-08-0606 August 1975 Summary of 750717 Meeting W/Mark I Owners Group Re Role of Mark I Owners Group Program & Schedule for Determining Mark I Safety/Relief Valve & LOCA Dynamic Loads & Impact of Loads on Operating Mark I Plants.List of Attendees Encl 1995-12-04
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20217D4661995-12-0404 December 1995 Summary of 950911 Meeting W/Commonwealth Edison Re Util Commitment to Improving Dresden,Matl Condition at Zion, Declining Performance at Braidwood & Comed Resources ML20059A6861993-10-0808 October 1993 Discusses 931006 Operating Reactors Events Briefing 93-38 Which Informed Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 930929.Attendees Listed in Encl 1 ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20126K0451992-12-14014 December 1992 Summary of Operating Reactors Events Briefing 92-20 on 921209 ML20217D4531992-03-0606 March 1992 Summary of 920305 Meeting W/Commonwealth Edison Co Re Items of Mutual Interest Re Performance of Utilities Nuclear Power Plants.General Topics Included,Performance of Zion & Dresden Stations ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20058N9711990-08-0909 August 1990 Summary of Operating Reactors Events Meeting 90-20 on 900808 ML20244D2791989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-13 on 890329 to Discuss Events Occurring Since Last Meeting on 890322.Summary of Reactor Scrams for Wk Ending 890326 Encl ML20196B9821988-12-0101 December 1988 Summary of Operating Reactors Events Meeting 88-47 on 881129.List of Attendees,Events Discussed & Significant Elements of Events,Two Events Suggested for long-term Followup & Summary of Reactor Scrams Encl ML20150B4671988-06-20020 June 1988 Summary of 880608 Facility Site Visit to Attend Exit Meeting for Insp of Emergency Operating Procedures (EOP) Performed by Assigned Region I EOP Team ML20235Z5891987-10-0808 October 1987 Summary of 871006 Operating Reactor Events Meeting 87-34 Re Events Occurring Since 870929 Meeting.List of Attendees & Presentation Matl Encl ML20237J1221987-08-20020 August 1987 Summary of Operator Reactors Events Meeting 87-27 on 870818. List of Attendees & Viewgraphs Encl ML20214F6731987-05-18018 May 1987 Summary of 870514 Meeting W/Util Re Review of Status of Pending Licensing Actions on Util Plants.Meeting Agenda & List of Attendees Encl ML20207A5221987-05-15015 May 1987 Summary of Operating Reactors Event Meeting 87-13 on 870507 Re Events Which Occurred Since 870428.List of Attendees, Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20215F0151986-12-16016 December 1986 Summary of Operating Reactor Events Meeting 86-43 on 861208. List of Attendees,Events Discussed & Significant Elements of Events Encl ML20214P8971986-11-25025 November 1986 Summary of Operating Reactors Events Meeting 86-40 on 861117.List of Attendees,Events Discussed,Significant Events Data Sheet & Summary of Presented Events That Will Be Input to NRC Performance Indicator Program Encl ML20214P9371986-11-21021 November 1986 Summary of Operating Reactor Events Meeting 86-39 on 861110.List of Attendees,Events Discussed & Significant Elements of Events Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20215G0561986-10-0707 October 1986 Summary of 860911 Meeting W/Bwr Owners Group in Bethesda,Md Re Strawman Generic Requirements for Enhancing BWR Containment Performance in Severe Accident Conditions.Second Technical Exchange Meeting in mid-Nov 1986 Proposed ML20210J0261986-03-24024 March 1986 Summary of Operating Reactor Events Meeting 86-08 on 860317 to Discuss Events Occurring Since Last Meeting on 860310 ML20154N8751986-03-12012 March 1986 Summary of Operating Reactor Events 860310 Meeting 86-07 W/Ornl Re Events Occurring Since 860303 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154C9931986-02-24024 February 1986 Summary of Operating Reactors Event Meeting 86-04 on 860210.List of Attendees,Briefing & Reactor Scram Summaries Encl ML20151N3021985-12-19019 December 1985 Summary of 851216 Operating Reactor Events Meeting 85-27. Attendance List,Viewgraphs of Events Discussed,Significant Event Elements,Assignment of Followup Review Responsibility & Status of Previous Assignments Encl ML20205J0421985-11-21021 November 1985 Summary of ACRS 307th Meeting on 851107-09 in Washington, DC Re Review of Application of Beaver Valley Power Station 2,EPA Stds for High Level Radwaste Repository & Investigation of Significant Incidents at Power Plants ML20141E9501985-11-18018 November 1985 Summary of ACRS Subcommittee on Reactor Operations 851104 Meeting in Washington,Dc to Discuss Recent Plant Operating Experience.Fr Notice,Schedule of Discussion & Agenda Encl ML20138P0081985-10-21021 October 1985 Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007 ML20133E4631985-10-0101 October 1985 Summary of Operating Reactors Events Meeting 85-17 on 850923.List of Attendees & Viewgraphs Encl ML20141E5521985-09-26026 September 1985 Summary of ACRS Subcommittee on Reactor Operations 850910 Meeting in Washington,Dc to Discuss Recent Operating Occurrences.Fr Notice,Meeting Schedule & List of Meeting Slides Encl ML20209G6871985-09-0909 September 1985 Summary of Operating Reactor Events Meeting 85-14 on 850826 to Brief Director & Div Directors on Events Which Occurred Since 850813 Meeting.Computer Printout of 1985 Operating Reactor Events Meeting Topics to Date Encl ML20125C5621978-05-0101 May 1978 Summary of 780309-10 Meeting W/Mark I Owners Group in Bethesda,Md Re Changes in Long Term Program as Reflected in Rev 3 to Mark I Owners Group Program Action Plan ML20127A4681978-03-0101 March 1978 Summary of 771129 Meeting W/Mark I Owners Group & GE in San Franciso,Ca Re Listed Topics,Including Results & Bases for long-term Program Decision Point 3.List of Attendees & Viewgraphs Encl ML20148G7781978-01-18018 January 1978 Summary of 780105 Meeting W/Util Re SEP Review of Environ Qualification of Electrical Equipment ML20141N3471977-05-20020 May 1977 Summary of 770411 Meeting W/Mark I Owners Group & GE to Discuss Structural Acceptance Criteria for Mark I Containment long-term Program.List of Attendees Encl ML20125C5711976-09-0909 September 1976 Summary of 760812 Meeting W/Mark I Owners Group,Ge,Epri & Techncial Consultants Re Listed Long Term Program Tasks ML20125C5721976-09-0909 September 1976 Summary of 760819 Meeting W/Mark I Owners Group,(Ge) in Bethesda,Md Re Discussions on Mark I Containment Ltp.List of Attendees Encl ML20125D6581976-08-18018 August 1976 Summary of 760717-08 Meeting W/Representatives of Mark I Owners Group in Bethesda,Md Re Discussions on Reassessed Content of Mark I Containment LTP & Recently Submitted Responses to Questions on STP Final Rept ML20235E9641975-08-0606 August 1975 Summary of 750717 Meeting W/Mark I Owners Group Re Role of Mark I Owners Group Program & Schedule for Determining Mark I Safety/Relief Valve & LOCA Dynamic Loads & Impact of Loads on Operating Mark I Plants.List of Attendees Encl 1995-12-04
[Table view] |
Text
_ _ __._ _ ____ _ _
t UIsiTSO aTAft3
\ NUCLEAQ MEGULATORY COMMISSION
, 9 III0loN 911 a
- f. ! 700moostysLTmOAO I st.tN ALLYN. ILUNOl5 64137 JUN 2 01988 .
MEMORANDUM FOR: A. Pert Davis, Regional Administrator FROM: H. J. Miller, Director, Division of Reactor Safety
SUBJECT:
DRESDEN SITE VISIT On June 8, I visited the Dresden Plant to attend the exit meeting for an inspection of emergency operating procedures (EOPs) performed by the assigned Region I E0P team. The E0P inspection identified deficiencies and weaknesses in Dresden's E0Ps that must be addressed by the licensee. However, none of the findings raised imediate safety concerns. Sumary notes from the E0P exit meeting are attached.
While at the site, I toured the facility with the resident inspector, Paul D.
Kaufman. Unit 2 was operating at 90% power while Unit 3 was shutdown in a j refueling outage. I toured the Unit 3 drywell and other contaminated areas as well as readily accessible areas to get a good, overall picture of material cor.ditions. I also visited the control room and spoke to operators. The following sumarizes my observations: .
i 1. While significant progress has been made in cleaning and painting the plant, I noted numerous oil and potentially contam'nated water / steam leaks. There was, for example, significant leakage occurring at the Unit 2 (operating unit) EHC station. A significant amount of EHC fluid was observed standing inside the weir wall surrounaing the EHC pumps and heat exchangers. In some cases, it appears some of the leaks or pumps were actually painted over; the oil leaks have finally worked their way through the paint, however.
- 2. We noted several deficient situations involving ongoing maintenance. In one insttnce, maintenance was being performed on a flow control valve in a condensate /feedwater recirculation line using hoists rigged from safety related electrical conduit. This repeats a problem which was recently raised by the RI's with licensee management. Another problem involved maintenance being performed on equipment without adequate cleanliness controls (e.g., unattended condensate system flow control valve with bonnet and valve intervals removed without protection). Combined with ,
recent fires, which were attributable to contr.:: tor activities, these situation raise strong questions about CECO's control of contractors doing maintenance and modification work at the plant.
- 3. From discussions with several operators, it appears that operator morale has improved at the plant over the past year or so. They said they are pleased with steps being taken to upgrade material condition. They said they saw management (e.g., the plant manager) in the plant more of ten 8807120037 880705 PDR ADOLK 05000910
& ' . 4U
e i
A. Bert Davis 2 JUN 2 0 1988 than in the past. However, several nuisance alarms or annunciators and other indicator problems (steam flow and reactor vessel water levels) were pointed out to me by one operator as examples of problems still being experienced in maintaining a high level of material readiness.
- 4. The control room was quite noisy and not in very good, overall condition in large part because of major modifications being made in overhead spaces.
Modifications underway to improve lighting, altering the ceiling to (among other things) quiet the room, and wall-off the Unit 3 control room, appear to be needed.
Some of the poor housekeeping conditions observed may have been due to the fact that an outage in Unit 2 was just completed simultaneously with the Unit 3 refueling outage sapping plant resources. In any event, the items above present concerns which I talked to the plant manager about.
Separately, and after my visit, the inonthly management meeting with CECO on Dresden was held. The issues identified in my tour were among those discussed.
Specifically, for example, the problem of contractor control was raised. My impression from the plant tour and recent events (e.g., fires, maintenance problems associated with the MSIV failures) is that these periodic visits and canagement meetings are important steps as we follow CECO's efforts to improve
- r.aintenance and material conditions at Dresden, operating both units at tne same time.
i H. J. Miller, Director Division of Reactor Safety
Attachment:
As stated cc w/o attachment:
J. Taylor NRR J. Clifford, EDO C. J. Paperiello, Rill E. G. Greenman, RIf!
J. J. Harrison, RIII l G. C. Wright, RIII l
W. L. Forney, RIII I 3. G. Dupont, SRI
! P. D. Kaufman, RI i
l .
l l