Summary of 760819 Meeting W/Mark I Owners Group,(Ge) in Bethesda,Md Re Discussions on Mark I Containment Ltp.List of Attendees EnclML20125C572 |
Person / Time |
---|
Site: |
Millstone, Hatch, Monticello, Dresden, Peach Bottom, Browns Ferry, Nine Mile Point, Fermi, Oyster Creek, Hope Creek, Cooper, Pilgrim, Brunswick, Vermont Yankee, Duane Arnold, Quad Cities, FitzPatrick, 05000355 |
---|
Issue date: |
09/09/1976 |
---|
From: |
Guibert J Office of Nuclear Reactor Regulation |
---|
To: |
Office of Nuclear Reactor Regulation |
---|
References |
---|
NUDOCS 9212110238 |
Download: ML20125C572 (4) |
|
Similar Documents at Millstone, Hatch, Monticello, Dresden, Peach Bottom, Browns Ferry, Nine Mile Point, Fermi, Oyster Creek, Hope Creek, Cooper, Pilgrim, Brunswick, Vermont Yankee, Duane Arnold, Quad Cities, FitzPatrick, 05000355 |
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20217M5371999-10-25025 October 1999 Summary of 990901 Meeting with Licensee in Rockville,Md Re Util Planned Conversion to Improved Sts.Attendance List & Agenda Encl ML20217K8511999-10-21021 October 1999 Summary of 990914 Meeting with Cp&L,National Marine Fisheries Service & North Carolina Wildlife Resources Commission at Brunswick Plant Re Biological Opinion Issued by NMFS & Need to Reinitiate Consultation with NMFS ML20217H7031999-10-18018 October 1999 Trip Rept of 990927-30 Visit to Bnfl Offices in Richland,Wa Re Design Review Meetings on Electrical single-line Diagrams & Dgs,Hlw & Low Activity Waste Ventilation,Fire Protection Issues & Melter Design/Hazards ML20217H5711999-10-15015 October 1999 Summary of 990927 Meeting with FPC Re Plant,Unit 3 Large Bore Piping Project.List of Attendees & Matl Used in Presentation Enclosed ML20217H1001999-10-13013 October 1999 Summary of 990930 Meeting with Util in Rockville,Md Re Proposed Five Percent Power Uprate for Plant,Unit 1.List of Meeting Participants & Licensee Meeting Handout Encl ML20217F9621999-10-0707 October 1999 Summary of 990929 Meeting with Nasa in Rockville,Maryland Re Proposed Decommissioning Plans for Nasa Plumbrook Test & Mockup Reactors ML20212K8671999-09-30030 September 1999 Summaries of 971111,980317,980505,980623,980707,980806, 980917,981023,981110,981217,990114,990205,990318,990325, 990416 & 990714 Meetings with Licensee Re Implementation of plan-for-excellence Restart Issues.With Minutes & Handouts ML20212H2231999-09-24024 September 1999 Summary of 990831-0901 Meeting with STPNOC in Rockville, Maryland Re 990713 Request for 14 risk-informed Exemptions to Exclude safety-related LSSC & non-risk Significant Components from Special Treatment Requirements ML20212H1911999-09-24024 September 1999 Summary of 990819 Meeting with Util & DOT to Discuss Packaging & Applicable Regulations for Haddam Neck Rv Shipment Scheduled for September 2000 ML20217D1001999-09-24024 September 1999 Summary of 990901 Meeting with Nmpc,Nyseg & Amergen Energy Co in Rockville,Maryland Re NMPC Plans & Pending Submittal Re Transfer of NMPC Interest & Authorities Under Operating Licenses for Nine Mile Point ML20216H8631999-09-24024 September 1999 Summary of 990714 Meeting with Cyap & Bpc Re Hazards Analysis of Proposed Installation of Natural gas-fired, Turbine Driven Electric Generation Facility on Site of Haddam Neck Plant.List of Attendees & Meeting Notes Encl ML20212D1631999-09-20020 September 1999 Summary of 990908 Meeting with Myap in Rockville,Md Re Plant License Termination Plan.List of Attendees & Licensee Handouts Encl ML20212A2471999-09-15015 September 1999 Summary of 990902 Meeting with Westinghouse in Rockville,Md Re Changes That W Plan to Make in Rev 3 of AP600 Design Control Document (Dcd).List of Attendees & Handouts Encl ML20212A3101999-09-14014 September 1999 Summary of 990823 Meeting with Util in Rockville,Md to Discuss License Termination Plan.List of Attendees Encl ML20216E5571999-09-10010 September 1999 Summary of 990831 Meeting with Duke Cogema Stone & Webster & DOE Re Design of Mixed Oxide Fuel Fabrication Facility (MOX-FFF) & License Application Submittal Schedules.Agenda & List of Attendees Encl ML20211P9981999-09-0808 September 1999 Summary of 990816 Meeting with Saxton Nuclear Experimental Corp & Gpu Nuclear Corp in Saxton,Pa to Continue Discussions Started at Meeting on 990701,about Resubmission of License Termination Plan.List of Attendees & Briefing Matl Encl ML20211N2321999-09-0808 September 1999 Summary of 990701 Meeting with Utils Re Resubmission of License Termination Plan for Saxton Nuclear Experimental Facility.List of Meeting Attendees Encl ML20211N2141999-09-0808 September 1999 Summary of 990720 Meeting with Util in Rockville MD Re Amend Currently Under Review by Staff Pertaining to Control Room Habitability at Plant Units 1 & 2.List for Attendees & Licensee Handouts Encl ML20211N5371999-09-0808 September 1999 Summary of 990901 Meeting with Util in Rockville MD Re Plans for Advanced Core Monitoring Sys.List of Attendees & Licensee Agenda Encl ML20211K3471999-08-31031 August 1999 Summary of 990728 Meeting with Util Re Staff 990721 RAI Re Smud Application for ISFSI at Rancho Seco Site.Attendace List Encl ML20207H8921999-08-30030 August 1999 Summary of 990713 Meeting with Usec Re Status of Ncse/A Review & Upgrade Effort Being Conducted at Portsmouth GDP, Including Extended Completion Date for Priority 2 Portion of NCS Cap.List of Attendees & Slides,Encl ML20211F5761999-08-26026 August 1999 Summary of 990813 Meeting with Licensee in Rockville,Md to Discuss Status & Completion Schedule of Active & Soon to Be submitted,TMI-1 Licensing Issue.List of Attendees & Meeting Handouts Encl ML20210U3011999-08-16016 August 1999 Summary of 990727 Meeting with Bnfl Fuel Solutions (Bfs) & Consumers Energy in Rockville,Md Re Bfs Integrations Status, Wesflex Sys & Big Rock Point Plant Dry Storage Plans.Meeting Agenda,Attendance List & Meeting Handouts,Encl ML20210Q1841999-08-11011 August 1999 Summary of 990722 Meeting with Util Re Proposed TS for SG Water Level low-top Trip Setpoint.List of Meeting Attendees & Handout Provided by Util Encl ML20210P9511999-08-10010 August 1999 Summary of 990722 Meeting with Util in Rockville,Md Re Recently Signed Asset Purchase Agreement Between Licensee & Amergen Energy Co & Proposed Transfer of CPS License to Be Submitted to Nrc.List Meeting Attendees & Handout Encl ML20210Q7891999-08-10010 August 1999 Summary of 990713 Conference Call with Util Re Licensee Proposed Exemption Request ,as Supplemented by Ltr Re Emergency Preparedness ML20210S7941999-08-0909 August 1999 Summary of 990723 Meeting with Stakeholders in Rockville,Md Re Responsibilities of Div of Licensing Project Mgt & Solicit Feedback on Div Ongoing Redefinition Process from Interested Stakeholders.List of Attendees Encl ML20210L5231999-08-0505 August 1999 Summary of 990708-09 Meeting with Detroit Edison Co in Rockville,Md Re Issues Related to Fermi 2 Submittal for Conversion of Current TSs to Improved Standard Tss.List of Participants & RAI Tracking Numbers Encl ML20210L6541999-08-0404 August 1999 Summary of 990713 Meeting with Util in Rockville,Md Re Licensee Proposed Mods to Reactor Building Spray Sys Operation & Hpis.List of Attendees Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20210G0721999-07-29029 July 1999 Summary of 990617 Meeting with Licensee in Rockville,Md Re Licensing Requirements of k-eff (Rev 10).Attendees Listed ML20210H6681999-07-29029 July 1999 Summary of 990329 Meeting with Gpu in Forked River,Nj Re Possibility of Decommisssioning of Oyster Creek Nuclear Generating Station.List of Attendees & Licensee Handouts Provided ML20210H6271999-07-29029 July 1999 Summary of 990622 Meeting with EOI Re NRC Briefing by RBS on Issues Associated with Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees Provided ML20210G2711999-07-28028 July 1999 Summary of 990707 Meeting with Util in Rockville,Md to Discuss Licensee Termination Plan.List of Attendance & Handouts Encl ML20210B7521999-07-21021 July 1999 Summary,For Docket 7200030,of 990707 Meeting with Myap,S&W & NAC Intl Re Util Plans to Store Spent Fuel Using NAC-UMS Dry Storage Sys.Attendance List,Meeting Handouts & Util Rulemaking Handout,Encl ML20210C0181999-07-20020 July 1999 Trip Rept of 990609-0611 Visit to GE-Vallecitos Facility Re Renewal of Matl License SNM-960 ML20209G6971999-07-16016 July 1999 Summary of 990624 Meeting with Util in Rockville,Md to Discuss Plant License Renewal Program.List of Meeting Attendees & Presentation Matls Discussed at Meeting Encl ML20210A6941999-07-16016 July 1999 Summary of 990628 Meeting with Util in Rockville,Md Re Arkansas Nuclear One,Unit 2 Steam Generator Operational Assessment.List of Meeting Attendees & Licensee Handout Used During Meeting Encl ML20210D7801999-07-16016 July 1999 Summary of 990715 Meeting with TVA Re TVA Evaluation of Fee Structure Compared with Recent Actual Fees & NRC Guidance in Estimating Review Effort for Licensing Actions.List of Attendees & Matl Used in Presentation Enclosed ML20210E0201999-07-16016 July 1999 Summary of 990629 Meeting with Util in Rockville,Md Re Ongoing Efforts in Planning Sf Storage Strategy,Including Licensing of Isfsi,At Plant.With Attendance List & TVA Handout ML20210D7601999-07-16016 July 1999 Summary of 990616 Meeting with TVA in Rockville MD to Brief Staff on Planned SG Replacement.List of Attendees & Handout Provided by TVA Encl ML20209E7641999-07-0707 July 1999 Summary of 990617 Meeting with Licensee Re Util Plans to Add Racks to & Replace Older Racks in Sfp.List of Attendees Encl ML20196L1131999-07-0101 July 1999 Summary of 990330 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2.List of Attendees & Meeting Slides Encl ML20196K4621999-07-0101 July 1999 Summary of 990114 Meeting with Util in Rockville,Md Re Status of NRC Review of Bg&E License Renewal Application for Calvert Cliffs Npp.List of Meeting Attendees & Meeting Slides Encl ML20196J4111999-06-30030 June 1999 Summary of 990524 Meeting with Util in Rockville,Md to Discuss Technical Issues Re Proposed Rerack of Spent Fuel Pool at Plants.List of Attendees & Handouts Encl ML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20212J5991999-06-28028 June 1999 Summary of 990602 Meeting with Licensees to Discuss Safety & Licensing Requirements Applicable to Installation of Natural gas-fired,turbine-driven Electric Generation Facility on Site at Haddam Neck Plant ML20196H1471999-06-24024 June 1999 Summary of 990609 Meeting with Duke Energy Corp Re NRC Conclusions for TIA-98008 on Use of Compensatory Actions for Control Room Emergency Ventilation System & to Present Positions.List of Participants & Licensee Handouts Encl ML20196F8281999-06-24024 June 1999 Summary of 981203 Meeting with Representatives of & Contractors to Util in Rockville,Md Re Bge Performance on Aging Mgt Evaluation Re Susceptibility of Cast Austenitic Stainless Steel Components to Thermal Embrittlement.W/Encl ML20196G4301999-06-24024 June 1999 Summary of 981216 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Plant,Units 1 & 2 1999-09-08 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Dresden]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Nine Mile Point]] OR [[:Fermi]] OR [[:Oyster Creek]] OR [[:Hope Creek]] OR [[:Cooper]] OR [[:Pilgrim]] OR [[:Brunswick]] OR [[:Vermont Yankee]] OR [[:Duane Arnold]] OR [[:Quad Cities]] OR [[:FitzPatrick]] OR [[:05000355]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Dresden]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Nine Mile Point]] OR [[:Fermi]] OR [[:Oyster Creek]] OR [[:Hope Creek]] OR [[:Cooper]] OR [[:Pilgrim]] OR [[:Brunswick]] OR [[:Vermont Yankee]] OR [[:Duane Arnold]] OR [[:Quad Cities]] OR [[:FitzPatrick]] OR [[:05000355]] </code>. Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20217M5371999-10-25025 October 1999 Summary of 990901 Meeting with Licensee in Rockville,Md Re Util Planned Conversion to Improved Sts.Attendance List & Agenda Encl ML20217K8511999-10-21021 October 1999 Summary of 990914 Meeting with Cp&L,National Marine Fisheries Service & North Carolina Wildlife Resources Commission at Brunswick Plant Re Biological Opinion Issued by NMFS & Need to Reinitiate Consultation with NMFS ML20217H5711999-10-15015 October 1999 Summary of 990927 Meeting with FPC Re Plant,Unit 3 Large Bore Piping Project.List of Attendees & Matl Used in Presentation Enclosed ML20217H1001999-10-13013 October 1999 Summary of 990930 Meeting with Util in Rockville,Md Re Proposed Five Percent Power Uprate for Plant,Unit 1.List of Meeting Participants & Licensee Meeting Handout Encl ML20217F9621999-10-0707 October 1999 Summary of 990929 Meeting with Nasa in Rockville,Maryland Re Proposed Decommissioning Plans for Nasa Plumbrook Test & Mockup Reactors ML20212K8671999-09-30030 September 1999 Summaries of 971111,980317,980505,980623,980707,980806, 980917,981023,981110,981217,990114,990205,990318,990325, 990416 & 990714 Meetings with Licensee Re Implementation of plan-for-excellence Restart Issues.With Minutes & Handouts ML20216H8631999-09-24024 September 1999 Summary of 990714 Meeting with Cyap & Bpc Re Hazards Analysis of Proposed Installation of Natural gas-fired, Turbine Driven Electric Generation Facility on Site of Haddam Neck Plant.List of Attendees & Meeting Notes Encl ML20217D1001999-09-24024 September 1999 Summary of 990901 Meeting with Nmpc,Nyseg & Amergen Energy Co in Rockville,Maryland Re NMPC Plans & Pending Submittal Re Transfer of NMPC Interest & Authorities Under Operating Licenses for Nine Mile Point ML20212H1911999-09-24024 September 1999 Summary of 990819 Meeting with Util & DOT to Discuss Packaging & Applicable Regulations for Haddam Neck Rv Shipment Scheduled for September 2000 ML20212H2231999-09-24024 September 1999 Summary of 990831-0901 Meeting with STPNOC in Rockville, Maryland Re 990713 Request for 14 risk-informed Exemptions to Exclude safety-related LSSC & non-risk Significant Components from Special Treatment Requirements ML20212D1631999-09-20020 September 1999 Summary of 990908 Meeting with Myap in Rockville,Md Re Plant License Termination Plan.List of Attendees & Licensee Handouts Encl ML20212A2471999-09-15015 September 1999 Summary of 990902 Meeting with Westinghouse in Rockville,Md Re Changes That W Plan to Make in Rev 3 of AP600 Design Control Document (Dcd).List of Attendees & Handouts Encl ML20212A3101999-09-14014 September 1999 Summary of 990823 Meeting with Util in Rockville,Md to Discuss License Termination Plan.List of Attendees Encl ML20216E5571999-09-10010 September 1999 Summary of 990831 Meeting with Duke Cogema Stone & Webster & DOE Re Design of Mixed Oxide Fuel Fabrication Facility (MOX-FFF) & License Application Submittal Schedules.Agenda & List of Attendees Encl ML20211N5371999-09-0808 September 1999 Summary of 990901 Meeting with Util in Rockville MD Re Plans for Advanced Core Monitoring Sys.List of Attendees & Licensee Agenda Encl ML20211P9981999-09-0808 September 1999 Summary of 990816 Meeting with Saxton Nuclear Experimental Corp & Gpu Nuclear Corp in Saxton,Pa to Continue Discussions Started at Meeting on 990701,about Resubmission of License Termination Plan.List of Attendees & Briefing Matl Encl ML20211N2141999-09-0808 September 1999 Summary of 990720 Meeting with Util in Rockville MD Re Amend Currently Under Review by Staff Pertaining to Control Room Habitability at Plant Units 1 & 2.List for Attendees & Licensee Handouts Encl ML20211N2321999-09-0808 September 1999 Summary of 990701 Meeting with Utils Re Resubmission of License Termination Plan for Saxton Nuclear Experimental Facility.List of Meeting Attendees Encl ML20211K3471999-08-31031 August 1999 Summary of 990728 Meeting with Util Re Staff 990721 RAI Re Smud Application for ISFSI at Rancho Seco Site.Attendace List Encl ML20207H8921999-08-30030 August 1999 Summary of 990713 Meeting with Usec Re Status of Ncse/A Review & Upgrade Effort Being Conducted at Portsmouth GDP, Including Extended Completion Date for Priority 2 Portion of NCS Cap.List of Attendees & Slides,Encl ML20211F5761999-08-26026 August 1999 Summary of 990813 Meeting with Licensee in Rockville,Md to Discuss Status & Completion Schedule of Active & Soon to Be submitted,TMI-1 Licensing Issue.List of Attendees & Meeting Handouts Encl ML20210U3011999-08-16016 August 1999 Summary of 990727 Meeting with Bnfl Fuel Solutions (Bfs) & Consumers Energy in Rockville,Md Re Bfs Integrations Status, Wesflex Sys & Big Rock Point Plant Dry Storage Plans.Meeting Agenda,Attendance List & Meeting Handouts,Encl ML20210Q1841999-08-11011 August 1999 Summary of 990722 Meeting with Util Re Proposed TS for SG Water Level low-top Trip Setpoint.List of Meeting Attendees & Handout Provided by Util Encl ML20210P9511999-08-10010 August 1999 Summary of 990722 Meeting with Util in Rockville,Md Re Recently Signed Asset Purchase Agreement Between Licensee & Amergen Energy Co & Proposed Transfer of CPS License to Be Submitted to Nrc.List Meeting Attendees & Handout Encl ML20210Q7891999-08-10010 August 1999 Summary of 990713 Conference Call with Util Re Licensee Proposed Exemption Request ,as Supplemented by Ltr Re Emergency Preparedness ML20210S7941999-08-0909 August 1999 Summary of 990723 Meeting with Stakeholders in Rockville,Md Re Responsibilities of Div of Licensing Project Mgt & Solicit Feedback on Div Ongoing Redefinition Process from Interested Stakeholders.List of Attendees Encl ML20210L5231999-08-0505 August 1999 Summary of 990708-09 Meeting with Detroit Edison Co in Rockville,Md Re Issues Related to Fermi 2 Submittal for Conversion of Current TSs to Improved Standard Tss.List of Participants & RAI Tracking Numbers Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20210L6541999-08-0404 August 1999 Summary of 990713 Meeting with Util in Rockville,Md Re Licensee Proposed Mods to Reactor Building Spray Sys Operation & Hpis.List of Attendees Encl ML20210G0721999-07-29029 July 1999 Summary of 990617 Meeting with Licensee in Rockville,Md Re Licensing Requirements of k-eff (Rev 10).Attendees Listed ML20210H6681999-07-29029 July 1999 Summary of 990329 Meeting with Gpu in Forked River,Nj Re Possibility of Decommisssioning of Oyster Creek Nuclear Generating Station.List of Attendees & Licensee Handouts Provided ML20210H6271999-07-29029 July 1999 Summary of 990622 Meeting with EOI Re NRC Briefing by RBS on Issues Associated with Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees Provided ML20210G2711999-07-28028 July 1999 Summary of 990707 Meeting with Util in Rockville,Md to Discuss Licensee Termination Plan.List of Attendance & Handouts Encl ML20210B7521999-07-21021 July 1999 Summary,For Docket 7200030,of 990707 Meeting with Myap,S&W & NAC Intl Re Util Plans to Store Spent Fuel Using NAC-UMS Dry Storage Sys.Attendance List,Meeting Handouts & Util Rulemaking Handout,Encl ML20210A6941999-07-16016 July 1999 Summary of 990628 Meeting with Util in Rockville,Md Re Arkansas Nuclear One,Unit 2 Steam Generator Operational Assessment.List of Meeting Attendees & Licensee Handout Used During Meeting Encl ML20210D7601999-07-16016 July 1999 Summary of 990616 Meeting with TVA in Rockville MD to Brief Staff on Planned SG Replacement.List of Attendees & Handout Provided by TVA Encl ML20210D7801999-07-16016 July 1999 Summary of 990715 Meeting with TVA Re TVA Evaluation of Fee Structure Compared with Recent Actual Fees & NRC Guidance in Estimating Review Effort for Licensing Actions.List of Attendees & Matl Used in Presentation Enclosed ML20210E0201999-07-16016 July 1999 Summary of 990629 Meeting with Util in Rockville,Md Re Ongoing Efforts in Planning Sf Storage Strategy,Including Licensing of Isfsi,At Plant.With Attendance List & TVA Handout ML20209G6971999-07-16016 July 1999 Summary of 990624 Meeting with Util in Rockville,Md to Discuss Plant License Renewal Program.List of Meeting Attendees & Presentation Matls Discussed at Meeting Encl ML20209E7641999-07-0707 July 1999 Summary of 990617 Meeting with Licensee Re Util Plans to Add Racks to & Replace Older Racks in Sfp.List of Attendees Encl ML20196K4621999-07-0101 July 1999 Summary of 990114 Meeting with Util in Rockville,Md Re Status of NRC Review of Bg&E License Renewal Application for Calvert Cliffs Npp.List of Meeting Attendees & Meeting Slides Encl ML20196L1131999-07-0101 July 1999 Summary of 990330 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2.List of Attendees & Meeting Slides Encl ML20196J4111999-06-30030 June 1999 Summary of 990524 Meeting with Util in Rockville,Md to Discuss Technical Issues Re Proposed Rerack of Spent Fuel Pool at Plants.List of Attendees & Handouts Encl ML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20212J5991999-06-28028 June 1999 Summary of 990602 Meeting with Licensees to Discuss Safety & Licensing Requirements Applicable to Installation of Natural gas-fired,turbine-driven Electric Generation Facility on Site at Haddam Neck Plant ML20196H1471999-06-24024 June 1999 Summary of 990609 Meeting with Duke Energy Corp Re NRC Conclusions for TIA-98008 on Use of Compensatory Actions for Control Room Emergency Ventilation System & to Present Positions.List of Participants & Licensee Handouts Encl ML20196G4301999-06-24024 June 1999 Summary of 981216 Meeting with Util in Rockville,Md to Discuss Status of NRC Review of Bge License Renewal Application for Plant,Units 1 & 2 ML20196F8281999-06-24024 June 1999 Summary of 981203 Meeting with Representatives of & Contractors to Util in Rockville,Md Re Bge Performance on Aging Mgt Evaluation Re Susceptibility of Cast Austenitic Stainless Steel Components to Thermal Embrittlement.W/Encl ML20195J8561999-06-16016 June 1999 Summary of 990518 Meeting with Dlc & Westinghouse to Discuss Dlc License Amend Request to Revise TS Limiting Safety Sys Setpoints to Be More Conservative ML20195J6631999-06-16016 June 1999 Summary of 990519 Meeting with Usec Re Intent to Amend Portsmouth Gaseous Diffusion Plant Moderation Technical Safety Requirements.List of Attendees & Handout Encl 1999-09-08 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Dresden]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Nine Mile Point]] OR [[:Fermi]] OR [[:Oyster Creek]] OR [[:Hope Creek]] OR [[:Cooper]] OR [[:Pilgrim]] OR [[:Brunswick]] OR [[:Vermont Yankee]] OR [[:Duane Arnold]] OR [[:Quad Cities]] OR [[:FitzPatrick]] OR [[:05000355]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Millstone]] OR [[:Hatch]] OR [[:Monticello]] OR [[:Dresden]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Nine Mile Point]] OR [[:Fermi]] OR [[:Oyster Creek]] OR [[:Hope Creek]] OR [[:Cooper]] OR [[:Pilgrim]] OR [[:Brunswick]] OR [[:Vermont Yankee]] OR [[:Duane Arnold]] OR [[:Quad Cities]] OR [[:FitzPatrick]] OR [[:05000355]] </code>. |
Text
. y.
([l
<3 issto% . -
k UNITED STATES NUCLEAR REGULATORY COMMISSION hfh' g' t
$ WASHINGTON, D, C. 20666 6fATO 41 g 1 E
September 9, 1976 Q ,/
'[hN',$l*?
np ;y yW wddrdiDOCKETSHOS.: 50-219, 50-J20,- 50-237, 50-245, 50-249, 50-254,' 50-259 W Nt f(% 50-260,6W-263, 50-265) 50-271/ 50-277, 50-278,/50-293,
$M i4 d@ v 50-296,'50-298, 50-321 50-324, 50-325,/ 50-331, 50-333,/
50-341, 50-354f 50-355, and 50-366.
sDs;%gRg
~"'
'*l LICENSEES: Boston Edison Company, Carolina Power & Light Company, Commonwealth Edison Company, Detroit Edison Company, Georgia Power Company, Iowa Electric Light & Power Company, Jersey Central Power & Light Company, Nebraska Public Power District, Niagara Mohawk Power Corporation, Northeast Nuclear Energy Company, Northern States Power Company, Philadelphia Electric Company, Power Authority of the State of New York, Public Service Electric and Gas. Tennessee Valley Authority, Vermont Yankee Nuclear Power Corporation.
FACILITIES: Oyster Creek Nuclear Generating Station Nine Mile Point Unit 1 Pilgrim 1. Dresden Units Nos. 2 and 3 Millstone Unit No. 1. Quad Cities Units Nos. 1 and 2 Monticello, Peach j Bottom Units Nos. 2 and 3. Browns Ferry Units Nos.1, 2 and j
3, Verment Yankee, Hatch Units Nos.1 and 2, Brunswick Units Nos. 1 and 2, Duane Arnold Energy Center, Cooper, Fitzpatrick, Enrico Fermi Unit No 2, and Hope Creek Units Nos.1 and 2.
SUPtiARY OF MEETING HELD ON AUGUST 19, 1976 WITH REPRESENTATIVES OF THE MARK I OWNER'S GROUP On August 19, 1976 a meeting was held in Bethesda with represcatatives of the Mark I Owner's Group General Electric Company (GE), and their technical consultants. The purpose of this meeting was to discuss the Mark I Containment Long Term Program (LTP). Enclosure 1 is a list of the meeting attendees.
SUMMARY
D. Galle, Commonwealth Edison Company and Chairman of the Mark I Containment Owner's Group, stated that the Owner's Group was prepared to discuss the individual LTP activities and to describe their overall strategy for conducting the LTP. He further stated that the Owner's Group was carrying on three parallel efforts (identification of load mitigating devices, development of structural fixes, and load definition through testing and analytical models) simultaneously in order to ensure timely completion of the LTP.
[6C gd4 9212110238 760909 gu2 PDR ADOCK 05000263 l P PDR I
~,, v 2 m .
I V , j.
6 I B. Sobon, GE, reviewed the history of GE's Mark I Containment design efforts from the Bodega Bay testing program to the present time. He h* d emphasized that, although more work is required prior to the final resolution b of the current Mark I Containment design concerns, one should not lose 1 . f a perspective of the progress which has already taken place.
+ mo P. Ianni, GE. described the individual LTP activities and the overall LTP strategy. Enclosure 2 contains the slides used in his presentation. He stated that the LTP schedule would result in the completion of the LTP plant-unique analyses by December 1978. The NRC staff expressed the following concerns related to the LTP content and schedule:
- 1. The testing programs for d finition of steam loads for the existing straight downcomer design (as opposed to a downcomer with load I mitigation device) should be expedited to assure that structural l fixes may be implemented at the earliest possible date on those l facilities which will nct require load mitigating devices.
- 2. The program for definition of steam loads for potential load mitigating devices should be expedited to assure that a device is chosen and is available for installation at the earliest possible i date.
- 3. The effects of fluid-structural interaction on the torus shell due to safety-relief valve (SRV) actucation should he investigated for individual plant torus shell thicknesses and for plant-specific SRV locations.
- 4. Fluid-structural interaction effects on the torus sheH due to LOCA loads should be investigated.
- 5. Post-LOCA operability of pumps and valves in piping which is attached to the torus should be evaluated in the LTP.
With respect to the first two NRC staff concerns mentioned above, D. Galle stated that the Owner's Group would (1) conduct small-scale, open-tank screening tests of potential load mitigating devices with steam in early 1977, (2) review the potential for accelerating the small-scale, closed-tank, steam testing program, and (3) would complete the design evaluation of a large-scale steam testing facility by October 1976.
B. Kiang SRI, presented additional infonnation about the 1/12 scale Three-Dimensional Testing Program to address the NRC staff's concerts related to (1) the selection of 1/12 scale for the testing facility, (2) the selection of a straight cylinder torus section for the testing facility, and (3) the adequacy of the instrumentation for the testing facility. Enclosure 3
a x 0 O N
& e , p.
S" contains the slides used in his presentation. The NRC staff expressed concern that the criteria utilized in the selection of the scale for the three-dimensional testing facility did not include an instrument error
$y ' analysis. In addition, the NRC staff expressed concern that the straight b' cylinder torus section would not adequately represent the effects of the C maldistribution of water mass or the discontinuity effects at the mitered Ljoints in an actual torus design. The NRC staff stated that the abovementioned concerns would have to be accounted for in evaluating the test data and that conservative adjustments to the data would be required. Representatives of the Owner's Group acknowledged the NRC staff's position on this matter and stated that they realized that a more so)histicated, larger scale, test facility may be required in order to tace full credit for the three dimensional load mitigating effects demonstrated by the 1/12 testing program. They further stated that their current intent is only to confinn the "20% value" for three-dimensional load reducing effects (i.e., further justify the use of a correction factor, "CF") which was utilized in the STP plant unique analyses.
W. Cooper, Teledyne, presented the proposed schedule for development of the LTP structural acceptance criteria. Enclosure 4 contains the slides used in his presentation. The NRC staff stated that a close working relationship between the NRC and the Owner's Group would be essential to assure that the proposed schedule is met.
The Owner's Group presented additional information on specific aspects of the LTP in response to the NRC's request by letters to each Mark I licensee dated August 11-13, 1976. Enciosure 5 contains the infonnation presented. With respect to the response to concern #10, the Owneris Group stated that the potential for combination of SRV loads with LOCA loads should be considered " mechanistically". The NRC staff stated that we would infonn the Owner's Group of our position on this matter within the next two or three weeks.
<e John C. Guibert Operating Reactors Branch #3 Division of Operating Reactors I
h G-- ,_
91 $$ QN}[x y g l, p ,
.-M
g r~3 (N g *
"' %[*, ('~ )NUCLEAR REGULATORY COMMIS$10N UNITE 9 STATES j
' j ..
[ ,$ . CASHINGTON. D. C. 20$55
{$ifiOf ve a D'
c l
J-..l
. %,,,,,/
V Q
$I/
- .t ye e
- Local PDR R. L. Baer dBecket Files 5"d A 6 5 *A. Schwencer NRR Rdg ~B. K. Grimes ORBf3 Rdg Project Manager
. *K. R. Go11er NRC Participants D. Eisenhut *ACRS (i6)
- 7. J. Carter T. B. Abernathy .
- D. L. Ziemann D. Thompson
_