IR 05000454/1985038

From kanterella
(Redirected from ML20141M964)
Jump to navigation Jump to search
Advises of Completion of Review of Addl Info Re Request for Withdrawal of Violation Noted in Insp Repts 50-454/85-38 & 50-455/85-42 on 850828-29 Re Liquid Waste Discharge. Withdrawal Inappropriate
ML20141M964
Person / Time
Site: Byron  
Issue date: 02/25/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20141M965 List:
References
NUDOCS 8603030144
Download: ML20141M964 (2)


Text

- _

_ _ -

,

.

FE8 251986 Docket No. 50-454 Docket No. 50-455 Commonwealth Edison Company ATTN:

Mr. Cordell Reed

'

!

Vice President

Post Office Box 767 Chicago, IL 60690

'

Gentlemen:

Subject:

BYRON STATION UNITS 1 AND 2, RESPONSE TO N0. 50-454/85038 AND NO. 50-455/85042; REQUEST FOR RECONSIDERATION OF VIOLATION N0. 2

,

l Reference:

(a) October 1, 1985, letter W. D. Shafer to Cordell Reed

'

(b) October 31, 1985, letter D. L. Farrar to J. G. Keppler

(c) November 21, 1985, letter W. D. Shafer to Cordell Reed (d) February 4, 1985, letter D. L. Farrar to J. G. Keppler

!

We have reviewed the additional information submitted (reference (d)) in support of your request for withdrawal of the referenced citation associated with the inspection conducted by Mr. L. J. Hueter on August 28-29, 1985.

We were unable to make a thorough review of your evaluation because insufficient detail was provided regarding the bases for your analysis.

Moreover, the value of the parameter, v, based on Reynold's Number and the criterion for selecting the particular value were not given. However, the final result of your evaluation appears to be that the liquid waste di.scharge was diluted in 30,500 gallons of water over a dispersion length of 577 feet.

Inasmuch as, the liquid waste discharge was 2700 gallons with a concentration of about 30 times MPC, this dilution would only reduce the average concentration in the release to approximately 2.6 times MPC.

Based on this consideration, we believe withdrawal of the citation would be inappropriate. We reviewed your corrective actions for this event during our inspections of November 25-27, 1985, and February 4-6, 1986.

These actions appear to be adequate and we have no further questions regarding this matter.

Sincerely,

,

' Original signed by U.p. Shafer" g 3ogo g gj8

'

G W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branch See Attached Distribution

<0D RIf (

RIII %

I

,

e)

H

/ld Schumacher o ney S

W

.

.

.

.

..

.

_. - -

-

.

,

.

,

FEB 251986 Commonwealth Edison Company

Distribution cc:

D. L. Farrar, Director of Nuclear Licensing V. I. Schlosser, Project Manager Gunner Sorensen, Site Project Superintendent R. E. Querio, Plant Manager DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Byron Resident Inspector, RIII Braidwood Phyllis Dunton, Attorney General's Office, Environmental Control Division D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE Steve Lewis, ELD L. Olshan, NRR LPM H. S. Taylor, Quality Assurance Division