ML20138A351

From kanterella
Jump to navigation Jump to search
Responds to FOIA Request for Documents Re Contracts 02-81-030 & 04-84-113.Forwards Apps a & B Documents. Documents Available in Pdr.Proprietary Data Deleted
ML20138A351
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/12/1985
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Millar F
ENVIRONMENTAL POLICY INSTITUTE
Shared Package
ML20136E458 List: ... further results
References
CON-NRC-02-81-030, CON-NRC-04-84-113, CON-NRC-2-81-30, CON-NRC-4-84-113, FOIA-84-682 NUDOCS 8512120002
Download: ML20138A351 (13)


Text

c- m ,

PDL-ot(,

  1. h UNITED STATES 8 '

%- NUCLEAR REGULATORY COMMISSION g WASHINGTON, D. C. 20555 e

y

%,...../

Mit 1985 Dr. Fred Millar, Director Nuclear and Hazardous Materials Tranportation Project Environmental Policy Institute 218 D Street, SE IN RESPONSE REFER Washington, DC 20003 TO F01A-84-682

Dear Dr. Millar:

This is in response to your' letter dated August 16, 1984, in which you requested, pursuant to the Freedom of Infonnation Act, documents concerning contracts 02-81-030 and 04-84-113. In your telephone conversation with Linda Robinson and Carol Ann Reed on August 21, 1984, you agreed to the deletion of cost (proprietary) data in the documents.

The documents listed on the enclosed Appendices A and B are being placed in the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC. You may obtain access by presenting a copy of this letter or by requesting PDR file F01A-84-682 in your name. Cost data has been deleted from the documents marked with asterisks'.

In addition, the Office of Nuclear Regulatory Research has approximately four inches of documents concerning contract number 04-84-113. Please telephone Mr. William Lahr on 443-7874 to make arrangements for inspection of this material at his office.

In the August 21, 1984, telephone conversation, we agreed to provide you with the identification of a Sandia report done for the Department of Energy. The report is entitled "An Assessment of the Safety of Spent Fuel Transportation in Urban Enviorns" June 1983, SAND 82-2365.TTC-0398.

This completes NRC action on your request.

Sincerely, 7: w "h Donnie H. Grimsley, Director Division of Rules and Records Office of Administration

Enclosures:

As stated 8512120002 851112 682 PDR

[ t_Ah

e 4

Re: F01A-84-682 APPENDIX A NRC-04-84-113

1. Undated Handwritten note to Andrea (1 page)

. 2. Undated Memo from Burnett to Coller, subject: Request for Experimental Determin~ation of Sabotage Source Term for Shipments of Spent Fuel from Gas-Cooled Power Reactors and Nonpower Reactors (RR-NMSS-83-3) (2 pages)

3. . Undated Request for Procurement Action (RFPA) (1 page)
4. Undated Study on Fisson Product Release: Transport Sabotage (2 pages)
5. 11/29/82 Memo from Burnett to Bernero and Goller, subject: Request for Experimental Determination of Sabotage Source Term for High Level Waste Shipments (R pages)
6. 02/22/83 Memo to Dorie from Forehand, subject: Contract Review Board of RFPA# RES-80-180 (1 page) 3
7. 02/22/83 Memo to Grenier from Forehand, subject: Contract Review Board Review of RFPA# RES-80-180 (1 page)
8. 02/25/83 Memo to Brown from Forehand, subject: Contract Feview Board Review of RFPA# RES-83-169 (1 page)
9. 02/25/83 Memo to Muir from Forehand, subject: Contract Review Board Review of RFPA# RES-83-169 (1 page) i
10. 03/25/83 Memo to Hartfield from Forehand, subject: Contract Review Board Review of RFPA# RES-83-169 (1 page)
11. 03/25/83 Statement of Work, Fission Product Release (5 pages)
12. 04/15/83 Request for Procurement Action (RFPA) (1 page)
13. 04/26/83 Justification for Placement of Work with Battelle Columbus (2pages)
14. 07/19/83 Memo from Morton to Halman, subject: Milestone Schedule Delay (RES-83-169 Fission Product Release: TransportSabotage)

(5pages)

15. 08/25/83 Statement of Work, Fission Product Release: Transport Schedule (12pages)

=

an..:n , ~~~ .. ,

Re: F01A-84-682 APPENDIX A (Continued)

16. 08/30/83 Request for Procurement Action (RFPA) (2 pages)
17. 09/22/83 Handwritten Negotiator Review of Sabotage of High Level Waste During Transport (RES-83-169) (3 pages)
18. 09/23/83 Conversation Record (1 page)
19. 10/21/83 Memo from Jessup to Halman, thru Morton, subject: Revised Milestone Schedule for RES-83-169 (3 pages)
20. 10/25/83 Statement' of Non-personal Services (3 pages)
21. 11/08/83 Finding and Determination (4 pages)
22. 11/23/83 Ltr from Goller to Brown w/ enclosure (2 pages)
23. 11/23/83 Proposal (Technical) on Study on Fission Product Release:

Transport Sabotage (65 pages) 24, 11/28/83 Ltr from Jessup to Department of Commerce (1 page)

25. 12/01/83 Request for Procurement Action (RFPA) (2 pages)
26. '12/06/83 Commerce Business Daily (1 page)
27. 01/04/84 Memo from Jessup to Halman thru Morton, subject: Revised Milestone Schedule for RES-83-169 (1 page)
28. 01/04/84 Schedule B, Revision #3 (2 pages)
29. 01/11/84 Memo from Barnold to Jessup, subject: Review of Contractor Organizational Conflicts of Interest, Solicitation No.

RS-RES-84-113. " Study on Fission Product Pelease: Transport Sabotage" (1 page)-

30.-01/13/84 Ltr from Davis to Jessup, re: RFP No. RS-RES-84-113, Proposal No. 587-J-8271 (10 pages)

31. 01/17/84 Memo from Hayes to Morton, subject: RES RFPA No. RES-84-113 (FIN B8997), Battelle Memorail Institute (1 page)
32. 01/18/84 Findings and Determination, Authority to Use Cost Plus Fixed FeeTypeContract(1page)
33. 01/18/84 Determinations and Finding (1 page)

_ _ x s ,. ~ _ _

[

Re'. F0IA-84-682 APPENDIX A (Continued)

. 34. 01/20/84 Memo from Norberg to Morton, subject: Change of Project Manager for RES RFPA No. RES-84-113 (1 page)

35. 02/03/84 _ Memo from Morton to Ting, subject: Designation of Authorized Representative - Project Officer (40 pages)
36. 02/27/84 Memo from Norberg to Morton, subject: Change of Project Manager for RES RFPA No. RES-84-113 (1 page)
37. 03/01/84 Award / Contract (45 pages)
38. 03/01/84 Amendment of Solicitaticn/ Modification of Contract (1 page)
39. 03/08/84 Ltr from Turel to Walters, subject: Contact of Ft. St. Vrain Personnel (1 page)
40. 03/14/84_ Reauest for Procurement Action (RFPA) (2 pages)
41. 03/16/84 Ltr from Smith to Battelle Columbus Laboratories (2 pages)
42. 03/19/84 Memo from Smith to Turel, subject: Designation of Authorized Representative - Project Officer (1 page)
43. 04/16/83 Ltr from Walters to Turel (3 pages)
44. 05/10/84 Ltr from Walters to Turel (2 pages)
45. 06/14/8,4 Ltr from Walters to Turel (3 pages)
46. 06/19/84 "Ltr from Walters to Turel (5 pages)
47. 07/13/84 Ltr from Walters to Turel (2 pages)
48. 08/10/84 Ltr from Walters to Turel (3 pages)
49. 08/21/84 Ltr from Fentiman to Turel (3 pages)

., a_.w - - - ,

Re: F01A-84-682 APPENDIX B NRC-02-81-030

1. Undated Statement of Work, Fission Product Release: Transport Schedule (6 pages)
2. Undated Handwritten, Objectives (4 pages)
3. Undated Procurement Planning Schedule for RFPA (3 pages)
4. Undated Handwritten Memo to File: Fields, subject: Contract No.

NRC-02-81-030 withBattelle(2pages)

5. Undated Questions and Answers (12 pages)
6. Undated Maximum Dose to Downwind Individual, 50 yr. (1 page)
7. Undated Article, General Provisions / Alterations (9 pages)
8. Undated Memo from Bell to Evans, subject: Analysis of Safeguards Needs for Transport of High Level Waste - Coments on Bibliography (1 page)
9. 09/25/80 Memo from Brown to Division of Contracts (18 pages)
10. 10/14/80 Memo from Cornell to Directors of Offices, subject: Scheduling and Management of Projects Planned for Submission to the Division of Contracts for FY 1981 (2 pages)
11. 11/80 General Provisions, Contents (61 pages)
12. 11/03/80 Ltr from Foster to Department of Comerce (1 page)
13. 11/03/80 Memo from Dougherty to Brady, subject: Security / Classification Requirements for. Proposed Procurement Entitled " Analysis of Safeguards Needs for Transport of High Level Waste" (1 page) 14 11/05/80 Determinations and Finding, Nonapplicability of the Privacy Act (1 page)
15. 11/09/80 NRC Form, Small Business / Labor Surplus Set /Aside Review (1 page)
16. 11/10/80 Findings and Determinations (1 page)
17. 11/12/80~ Statement of Non-Personal Services (4 pages)
18. 11/14/80 Memo from Keyser to Winningham, subject: RFP No. RS-NMS-81-030

. Entitled " Analysis of Safeguards Needs for Transport of High LevelWaste(1page)

m  %# w.g % ~ r ._ - ..~. _ & 4 n.; - - , s 4

t Re: F01A-84-682

~

APPENDIX B (Continued)-

' ~

19. l'1/14/80l Memo from Keyser to Avery, subject: Review of Solicitation (1 page)
20. 11/14/80 ' Memo from Keyser to Avery, subject: Review of Solicitation (1 page)

.21.-_11/20/80- Source Selection Board / Panel (1 page)

22. 11/20/80 Handwritten note to File from Keyser (1 page)
23. 11/26/80 Ltr from Dougherty to (Gentlemen), subject: Request for Proposal _No. RS-NMS-81-030 Entitled " Analysis of Safeguards Needs for Transport of High Level Waste" (93 pages)
24. _11/28/80 Memo from Brady to Halman, subject: Approval of Security / Classification Requirements, NRC Form 187, For RFP RS-NMS-81-030 (22 pages)
25. 12/09/80 Amendment of Solicitation / Modification of Contract (1 page)
26. 12/29/80 Memo from Chief, Technical Assitance Contracts Branch to Multiple Addresses, subject: Milestone Schedule - Request for Proposal (RFP)'No. RS-NMS-81-030 (3 pages)
27. 01/15/81 Proposed Research Program (Technical Proposal) (106 pages)
28. 01/16/81 Memo from Miles to Sawyer, subject: Evaluation of Proposals Under RFP No. RS-NMS-81-030, " Analysis of Safeguards Needs for Transport of High Level' Waste" (16 pages)
29. .01/26/81 Record of Telephone Conversation (1 page)
30. 01/26/81 Ltr from Mcdonald to Keyser, subject: Request for Proposal
  1. RS-NMS-81-030 (1 page)
31. 01/27/81 Ltr from Miles-to BDM Corporation (1 page)
32. 02/02/81 Ltr from Mattia to Power Technical Associates, subject: Request for Proposal (RFP) No RS-NMS-81-030 (1 page) 733. 03/17/81 Ltr from Mattia to Defense Contracy Audit Agency, subject:

Request for Audit Under RFP No. RS-NMS-81-030, " Analysis of

. Safeguards Needs for Transport of High Level Waste" (1 page)

34. 03/20/81 RecordofTelephoneConversation(1page)
35. 03/20/81 Record of ~ Telephone Conversation (1 page)

Re: FOIA-84-682 APPENDIX B (Continued)

S6. 03/20/81 Record of Telephone Conversation (1 page)

37. 03/23/81 Ltr from Mattia to Service Applications, Inc., subject:

Request for Proposal (RFP) No. RS-NMS-81-030 Entitled:

" Analysis of a Safeguards Needs for Transport of High Level Waste" (2 pages)

38. 03/30/81 Handwritten notes of Minutes of Meeting (15 pages)
39. 03/30/81 Ltr from Mattia to Analytical Sciences Corporation, subject:

Request for Proposal (RFP) No. RS-NMS-81-030 Entitled:

" Analysis of Safeguards Needs for Transport of High Level Waste" (1 page)

40. 03/30/81 Ltr from Mattia to ERC0/ Energy Resources Co., Inc., subject:

Request for Proposal (RFP) No. RS-NMS-81-030 Entitled:

" Analysis of Safe Waste" (2 pages) guards Needs for Transport of High Level

, 41. 03/30/81 Ltr from Mattia to ETA Engineering, Inc., subject: Request for Proposal (RFP) No. RS-NMS-81-030, Entitled: " Analysis of Safeguerds Needs for Transport of High Level Waste" (2 pages)

42. 03/30/81 Ltr from Mattia to Advanced Reserach and Application Corporation, subject: Request for Proposal (RFP) No.

RS-NMS-81-030 Entitled: " Analysis of Safeguards Needs for Transport of High Level Waste" (1 page)

43. 03/30/81 Ltr from Mattia to International Energy Associates, subject: -

Request for Proposal (RFP) No. RS-NMS-83-030 Entitled:

" Analysis of Safe Waste" (2 pages) guards Needs for Transport of High Level

44. 03/31/81 Ltr from Mattia to BDM Corporation, subject: Request for Proposal (RFP) No. RS-NMS-81-030 (2 pages)
45. 04/03/81 Ltr from Mattia to Battelle Memorial Institute, subject:

Request for Proposal No. RS-NMS-81-030 (1 page)

46. 04/03/81 Ltr from Mattia to Science Applications, Inc., subject: Request for Proposal No. RS-NMS-81-030 (1 page)
47. 04/03/81 Ltr from Mattia to HAR Technical Associates, subject: Request for Proposal No. RS-NMS-81-030 (1 page)

. _ . . ,, - , .m u,m . , ,  :

- Re: F01A-84-682 APPENDIX B (Continued)

'48 . 04/21/81' Memo from Miles to Sawyer, subject: Evaluation of Best and Final Proposals Under RFP No. RS-NMS-81-030 " Analysis of Safeguards Needs for Transport of High Level Waste" (2 pages)

'49. 06/04/81 Clarifications on Best & Final (2 pages)

50. 07/09/81 Determination of Prospective Contractor Responsiblity (1 page)
51. 07/27/81 Finds and Determination, Authority to Use a Cost-Type Contract (1page)
52. 07/28/81 Ltr from Lukz to Miles, re: RFP No. -RS-NMS-81-030 (2 pages)
53. 07/29/81 Memo from Mattia to Sawyer, subject: Designation of Authorized Representative - Project Officer (1 page)
54. 07/29/81 Ltr from Mattie to RDM Corporation, subject: RFP No.

RS-NMS-81-030 (1 page)

55. 07/29/81 Ltr from Mattia to Analytical Sciences Corporation, subject:

RFP No. RS-NMS-81-030 (1 page)

56. 07/29/81 Ltr from Mattia to ETA Engineering, Inc., subject: RFP No.

RS-NMS-81-030(1page)

57. 07/29/81 Ltr from Mattia to Advanced Research and Applications, subject:

RFP Np. RS-NMS-81-030 (1 page)

58. 07/29/81 Ltr from Mattia to International Energy Associates, subject: ,

RFP No. RS-NMS-81-030 (1 page)

59. 07/29/81 Ltr from Mattia to Science Applications, subject: RFP No.

[ RS-NMS-81-030(1page)'

t

60. 07/29/81 Ltr from Mattia to H&R Technical Associates, subject: RFP No.

RS-NMS-81-030 (1 page)

61. 07/29/81 Ltr from Mattia to ERC0/ Energy Resources Co., Inc., subject:

RFP No. RS-NMS-81-030 (1 page)

62. 07/29/81 Ltr from Mattia to Commerce Business Daily, subject: Notice of Award (1page)
63. 07/30/81 Ltr from Mattia to Battelle, subject: Contract No.

NRC-02-81-030(1page)

64. 08/11/81 Record of Telephone Conversation (1 page)

Re: F01A-84~682 APPENDIX B (Continued)

65. 08/19/81 Ltr from Millir to Mattia,-subject: Contract No. NRC-02-81-030 (1 page)
66. 08/26/81 Ltr from Mattia to Battelle, subject: Contract No. NRC-03-81-030

-(1 page)

67. 08/26/81 Award Contract (21 pages)
68. 09/02/81 Memo from Carr to Halman, subject: F0IA request from Janice Rutherford for a copy of Contract Awarded under RFP No.

RS-NMS-81-030 " Analysis of Safeguards Needs for Transport of High Level Waste" (2 pages)

69. 09/02/81 Notification of Contract Execution (1 page)
70. 09/10/81 Handwritten note from Miles, re: Telecon between E. Miles and Linda Robinson, F0IA (1 page)
71. 09/16/81 Memo from Halman tu Carr, sub.iect: F0IA request from the BDM Corporation for Contract Awarded under RFP No. RS-NMS-81-030 to Battelle, Columbus Laboratories (2 pages)
72. 09/23/81 Memo from Miles to Sawyer, subject: Evlauation of Proposed New Key Personnel Under Contract No. NRC-02-81-030 (7 pages)
73. 09/25/81 Ltr from Walters to Sawyer (13 pages)
74. 09/30/81 Memo from Sawyer to Miles, subject: Key Personnel Under ContractNo.NRC-02-081-030(1page)
75. 10/02/81 Memo from Evans to Bell, Erickson, McCorkle, MacDonald and Malaro, subject: Analysis of Safeguards Needs for Transport of High Level Waste -- Technical Assistance Study (1 page)
76. 10/09/81 Ltr from Sawyer to Walters, (4 pages)
  • 77. 10/12/81 Ltr from Walters to Sawyer (2 pages)
  • 78. 11/11/81 Ltr from Walters to Sawyer (4 pages)
79. 11/12/81 Request for Procurement Action (RFPA) (2 pages)
80. 11/24/81 Ltr from Walters to Sawyer (27 pages) 1
81. 12/02/81 Handwritten note to file from Fields (2 pages) l

. 1 Re: F01A-84-682 APPENDIX B (Continued)

82. 12/03/81- Memo from Evans to Baker, Erickson and McCorkle, subject:

Analysis of Safeguards Needs for Transport of High Level Waste (30 pages)

83. 12/04/81 Ltr from Davis to Mattia, subject: Contract No. NRC-02-81-030 (1 page)
84. 12/07/81 Memo from Mattia to Sawyer, subject: Contract No. NRC-02-81-030 (2 pages)
85. 12/09/81 Memo from Erickson to Evans, subject: Analysis of Safeguards

,Needs for Transport of High Level Waste (1 page)

  • 86. 12/09/81 Ltr from Walters to Sawyer (2 pages)
87. 12/10/81 Note for Evans from Baker, subject: Analysis of Safeguards Needs for Transport of High Level Waste (1 page)
88. 12/16/81 Notification of Contract Execution (3 pages)
89. 12/14/81 Memo from McCorkle to Evans, subject: Safeguarding High Level Waste Shipments (1 page)
90. 12/18/81 Ltr from Sawyer to Walters (2 pages)
91. 01/'t1/82 Ltr from Arnold to Siefken (6 pages)
  • 92. 01/13/82 Ltr from Walters to Sawyer (2 pages)
93. 02/82 Billing Instructions for NRC-Cost Type Contracts (8 pages)
  • 94. 02/11/82 Ltr from Walters to Sawyer (2 pages) 1
95. 02/23/82 Ltr from Walters to Sawyer (24 pages) '
  • 96. 03/10/82 Ltr from Walters to Sawyer (2 pages)

\ 97. 03/23/82 Ltr from Sawyer to Walters (1 page)

  • 98. 04/12/82 Ltr from Walters to Sawyer (1 page)
99. 04/26/82 Handwritten note, re: Telephone conversation (1 page) 100. 04/30/82 Conversation Record (1 page)
  • 101. 05/12/82 Ltr from Walters to Sawyer (2 pages)

Re: F01A-84-682 APPENDIX B (Continued) 102. 06/10/82 Ltr from Walters to Sawyer (2 pages) 103. 07/14/82 Ltr from Walters to Sawyer (2 pages) 104. 09/15/82 Conversation Records (1 page) 105. 08/13/82 Ltr from Walters to Sawyer (1 page) 106. 08/20/82 Ltr from Walters to Sawyer (38 pages) 107. 09/02/82 Ltr from Walters to Sawyer (5 pages) 108. 09/03/82 Memo from Burnett to Brown, subject: Contract NRC-02-81-030

" Analysis of Safeguards Needs for Transport of High Level Waste" - Exercise of Option (1 page) 109. 09/07/82 Request for Procurement Action (RFPA) (P. pages) 110. 09/10/82 Ltr from Walters to Sawyer (38 pages) 111. 09/14/82 Ltr from Walters to Sawyer (2 pages) 112. 09/17/82 Amendment of Solicitation / Modification of Contract (2 pages) 113. 09/17/82 Notification of Contract Execution (1 page) 114. 09/22/82 Ltr from Fields to Battelle, subject: Contract No.

NRC-02-81-030 (1 page) 115. 10/12/82 Ltr from Walters to Sawyer (2 pages) 116. 10/19/82 Memo from Gresham to Fields, subject: HRC-02-81-030 " Analysis of Safeguards Needs for Transport" (1 page) 117. 11/15/82 Ltr from Walters to Sawyer (2 pages) 118. 11/23/82 Ltr from Davis to Battelle, re: Contract No. NRC-02-81-030 Modification No. Three (3 pages) 119. 11/23/82 Request for Procurement Action (RFPA) (2 pages) 120. 11/29/82 Ltr from Walters to Sawyer (4 pages) 121. 11/29/82 Amendment of Solicitation / Modification of Contract (1 page) 122. 12/03/82 Handwritten note from Fields (1 page)

[

Re: F0lA-84-682 APPENDIX B (Continued)

  • 123. 12/15/82 Ltr from Walters to Sawyer (2 pages) 124. 12/20/82 Notification of Contract Execution (1 page) 125. 12/31/82 Amendment of Solicitation / Modification of Contract (1 page) 126. 01/04/83 Amendment of Solicitation / Modification of Contract (1 page) 127. 01/07/83 Ltr from Field to Battelle (1 page) 128. 01/11/83 Ltr from Walters to Sawyer (1 page) 129. 02/10/82 Notification of Contract Execution (1 page) 130. 02/11/83 Ltr from Walters to Sawyer (2 pages) '

131. 02/24/83 Memo to Terry, subject: Contract Review Board Review of RFPA#

RES-80-180 (6 page) 132. 03/18/83 Notification of Contract Execution (1 page) 133. 03/14/83 Ltr from Walters to Sawyer (1 page) 134. 03/28/83 Note from Sherr to Baker, subject: Fission Product Release Transport Sabotage Study (9 pages) 135. 04/11/83 Memo from Sawyer to Nulsen, subject: Protection of Spent Fuel Shipments from Nonpower Reactors (4 pages) 136. 04/26/83 Ltr from Walters to Sawyer (1 page) 137. 04/26/83 Memo from Sherr to Erickson, subject: Descriptive Summary for FY 84 Projects (6 pages) 138. 05/11/83 Ltr from Walters to Sawyer (1 page) 139. 05/20/83 Memo from 8urnett to Goller, subject: Request for Experimental Determination of Sabotage Source Term for Shipments of Spent Fuel From Gas-Cooled Power Reactors and Nonpower Reactors (2pages) 140. 06/14/83 Ltr from Walters to Sawyer (1 page) 141. 06/30/82 -Memo from Goller to Burnett, subject: Request for Experimental Detennination of Sabotage Source Term for Shipments of Spent Fuel from Gas-Cooled Power Reactors and Non-Power Reactors (RR-NMSS-83-3)(7pages)

f Re: F01A-84-682 APPENDIX 8 (Continued) 142. 07/14/83 Ltr from Walters to Sawyer (2 pages) 143. 07/15/83 Memo from'Burnett to Goller, subject: Reauest for Experimental Determination of. Sabotage Source Term for Shipments of Spent Fuel from Gas-Cooled Power Reactors and Non-Power Peactors (RR-NMSS-83-3)(1page) 144. 07/19/83 Questions of Safety Analysis re: Sabotage Operations on Spent Fuel Transportation (3 pages) 145. 08/10/83 Ltr from Walters to Sawyer (2 pages) 146. 09/15/83 Ltr from Walters to Sawyer (1 page) 147. 09/21/83 Ltr fron Walters to Sawyer (6 pages) 148. 10/14/83 Ltr from Walters to Sawyer (1 page) 149. 10/24/83 Ltr from Walters to Mattia (4 pages) 150. 11/10/83 Ltr from Walters to Sawyer (1 page) 151. 12/05/83 Conversation Record (1 page) 152. 12/09/83 Ltr from Walters to Sawyer (1 page) 153. 01/12/84 Ltr from Walters to Sawyer (1 page) 154. 02/08/84 Ltr from Walters to Sawyer (2 pages) 155. 03/08/84 Ltr from Sewell to Page (2 pages) 156. 03/09/84 Ltr from Walters to Sawyer (1 page) 157;-03/15/84 Memo from burnett to Brown, subject: Request for Procurement Action (1 page) 158. 03/15/84 Conversation Record (1 page) 159. 03/16/84 Request for Procurement Action (RFPA) (1 page) i 160. 03/19/84 Request for Procurement Action (RFPA) (2 pages)

, 161. 04/13/84 Ltr from Walters to Sawyer (1 page) 162. 04/27/84 Amendment of Solicitation / Modification of Contract (2 pages)

_ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ - _ - _ - _ - _ _ _ - -