ATTACHMENT A TECHNICAL SPECIFICATION CHANGE REQUEST LASALLE COUNTY STATION UNIT 1

SUBJECT:

Extension of a Limited Number of 18 Montn Interval Surveillance Requirements for First Refuel The Technical Specifications require many surveillance tests to be performeo every 18 months (plus a maximum extension defined by specification 4.0.2). To adequately utilize the core (i.e., attain at least the minimum exposure interval for Cycle 1), to allow completion of parts procurement ano design review for license conditions and other plant modifications and to factor in .

Commonwealth Edison system considerations which may arise, Commonwealth Edison requests approval for a one-time-only waiver of a limited numoer of 18-month frequency Technical Specifications surveillance requirements for Cycle 1, provided the surveillance is performed during the first refueling outage. The Technical Specification requirements which are requested to be waived are specified on the following pages. All other surveillance schedules -

for the planned Fall 1985 outage were completed during unscheduled outages during Cycle 1.

The surveillances requested to be waived require a plant shutdown or a plant shutdown results from the surveillance. All daily, monthly and quarterly surveillances have been and will continue to be performed as required.

The 18 month surveillance interval was selected to be consistent with the maximum anticipated interval between refueling outages.

Specification 4.0.2 allows an extension to this 18 month frequency to accommodate operations scheduling. However thi;; extension (25%)

is limited to a maximum of 3.25 x 18 months for 3 consecutive surveillance intervals. The "due date" indicated includes this allowed extension. The end of the most limiting surveillance interval, including the allowable 25% extension, is Septerrber 22, 1985. Refuel 1 is expected to commence on or before October 27, 1985. The period of plant operation during the requested extensions, therefore, is a maximum of 36 days.

8508160357 850809 PDR ADOCK 05000373 p PDR

s x

The LaSalle County Station Unit 1 has been through an ev. tended startup program and has tjeen shutdown several times for equipment failure, feedwater check valve problems, environmental qualification upgrade, etc throughout the first cycle (Cycle 1). Even though this unit has shutdown to perform " refueling" surveillances during mid-cycle before (including the surveillances listed on the following pages) these surveillances again come due before the optimum start of the actual refueling outage. We have concluded, based on a review of past surveillance records that these tests were satisfactory during the previous performance and therefore there is reasonable assurance that the health and safety of the public will not be endangered by -

operation in the proposed manner. The systems, valves, or instruments will not degrade unacceptably if these selected surveillance intervals are extended to October 27, 1985.

1. Logic / Functional Testing Specilication Descriotion Due Date 4.3.1.2 Reactor Protection System (RPS) -?/::/C; Table 4.3.3.1-1 Low Pressure Coolant Injection 9/27/85 4.3.3.2 4.3.4.1.2 ATWS-RPT 9/30/85 4.3.4.2.2 2CC- TT 3/;;i5- *boeJF

~

Table 4.3.7.11-1 Off-Gas Post Treatment Monitor 10/12/85 l 4.3.8.2 Feedwater/ Main Turbine High 10/20/85 l Level Trip 4 .'. 2.2 -v n 24v J. 10/C5/5; ME l

l 4.6.1.4.c MSIV Leakage Control 10/06/85 l

4.8.3.3.1 Thermal Overload Bypass-RHR Valves 10/08/85*

There is no safety significance to delaying these tests for a short period of time. All of the above systems have functional tests and/or calibrations which are within their Tech Spec surveillance frequency.

These functional or calibration tests verify operability of the instrumentation and/or components of which this logic system is a part.

In many cases these tests cover the majority of the logic system. (For e

. - msd>

example all channels of RPS are half scram tested monthly except the mode switch in shutdown position scram). The testing performed to meet the above specification generally entails verification that all portions work together. The result of this testing however requires actuation of systems in a mode which is not possible ouring normal power operation.

Since the parts of the systems which are more likely to fail (valves, r instruments, etc) are verified operable by current curveillances during the extension period, no impact on plant safety will occur.

  • - For non-primary containment automatic isolation valves bypassed under accident conditions.

+ b #h c * , pM h7 8%A; qNnde.^ nM @

8

2. Pressure Isolation Valves-Specification 4.4.3.2 (Table 3.4.3.2-1)

VALVE NUMBER TYPE DUE FUNCTION 1E12-F042B Gate 9/22/85 LPCI B Injection __

lE12-F042C Gate 9/22/85 LPCI C Injection _

lE12-F053B Globe 9/22/85 Shutdown Cooling Return B IE21-F005 Gate 9/22/85 LPCS Injection -

A recundant valve in each line listed above will remain within the Tech Spec surveillance interval. No valves listed are check valves. Gate-and Globe valves have had a good history of meeting the leakage rate recuirements. Alarms monitor the low pressure piping to ensure any leakage is detected (alarm function is tested every 31 days). All valves were last left with zero leakage. These valves cannot be tested with the reactor vessel at pressure. The test also requires access to the drywell which is inerted.

3. Calibrations Specification Description Due Date
a. Table 4.3.1.1-1-10 Turbine Control Valve Pressure 10/6/85 l

Switches

b. 4.4.3.1.b Prim Cont. Floor Drain Sump Flow 10/6/85 Monitoring e ^ n 3_? oM ' Cont. Occrcurrent Prctcetic-  ?!25/S5 3)opjgp

-T;ble 3.0.3.2 1 b} ':S C'!

_ _ .4

- 4_

The items -(c.c:pt c' listed above receive periodic functional testing to ensure the ability of the system to operate if required. h c is protcctcd by izir.g ~ ti b 1; cized to fail pii;; ;c t!~ -~ ~l

--; *ic- "1;c, fc; itcm ; calj 10% ::: ::p ir;d tc b: tcot:: u d-dnterr ' jr' ri c: thor: cre %' 'c trc: :: to b: t:: tad 1 of 2 ;=

tocted :xb 10 n ,$ 51:b ; :c;;; "; T::! Ep  ::e ir ;nt. All devices were found within acceptable limits at the last surveillance.

Item a: Requires that the turbine control oil system be shutdown and requires access to the itin turbine control valves. The turbine control oil system cannot be secured if the turbine is on line or if the bypass valves are passing steam. Therefore, the unit would have to shutdown to critical behind the MSIVs to perform this test.

Item b: To perform this calibration requires access to the drywell (inerted).

Ite c: Tc pcrf: thia Lcam cou prim 2;j wo cam.oco ; . ..tils-ti;. f .

wmdd n ei to ha ch ,t d;m , m320,r,uviu coux cxyc332vc uty,,gli -

te ; m

  • rer - -
4. Electric Power Cource
a. Specification 4.8.1.1.2.d.N These diesel tests are done normally while shutdown during refueling (required by Tech Specs). They are included in the testing program to ensure that periodically certain functions have not degraded. These tests include logic testing, preventative maintenance, etc. The diesel generators are verified .

to be operable while in cperation by performing several surveillances required by specifications 4.8.1.1.2.a, b and c.

This ensures that the diesel will start, will accept load and has available such auxilliaries as necessary. This applies to Divisions II and III only. All Division I testing will remain witnin the required interval. "

Div. II. Dueyl 10/2/Z h g - Div. III,10 '"'k-

b. Division III battery service test Specification 4.8.2.3.2.d.2.c -

This test only verifies that the battery still has sufficicnt capacity by actual testing. However verificatio.) that battery gravities and voltages are proper assures that the battery will be available if required. This slight delay does not affect battery availability. Technical Specification requires shutdown to perform this surveillance. Due 9/25/85.

Xp ll hmw E d. ener&

  • Cub WAt unfA don -L a u.sJ,,lg eq c4 n a s.ua w p q.us y w y.s.s Hsw I.

,fd ', \ '

3

'j 6

i j  ;

4i

5. Others "

l

a. Specification 4. . c.1 - Injection of Standby Liquid Control System into the reac essel using demineralized water.

Verification of pump opera ity is still maintained through other I)8P #5E' i current surveillances. This ' only verifies the flow path to the reactor vessel. This test wou ke Standby Liquid Control inoperable. Due 10/20/85. ,

b. Performance of a leak test required by Table 3.6.3-1 note (j) for valves 1833-F013A,B and 1B33-F017A,B. This is a water leak test to e verify that these check valves are able to close. These lines are small (3/4") which provides seal injection water to the recircula-tion pumps from the CRD System. This tes't requires access to  !

drywell. Due 9/26/85. '

I

c. Specification 4.1.3.1.4. Timing of Scram discharge volume vent and drain valves during reac scram. Vent and Drain valves are , g) , gyp, tested (timed) quarterly per Te pec 4.1.3.1.1 and 4.0.5 to ensure times are within tolerance. uires scram to perform. Due l 10/20/85.

( r ,

e E

e 1

[. .

L

'J 0355K m

Y L

d l,

e p5 s

e I

-.wd

( .w _ _ _ _ _ _ _ _ _ - -

I"T; yll * .

ATTACHMENT B PROPOSED CHANGE TO APPENDIX A TECHNICAL' SPECIFICATIONS TO OPERATING LICENSE NPF-11 Revised Pages:

NPF-11

-3/ 1-3 3/4 4-6 J/,1 3/4 4-9 ,

3/4 3-1 3/4 6-7 .

3/4 3-8 3/4 6-34 3/4 3-23 3/4 8-4 3/4 3-32 3/4 8-17 3/4 3-33 - / 0-2,

'3/4 3-35 3/4 8-28 3," ? ' C - 3/4 8-29 3/4 3-89 -

3/4 3-90 3/4 3-92 3/, ,-3 b