Other: AECM-85-0303, Proposed Tech Specs,Changing Table 3.3.7.4-1, Remote Shutdown Sys Controls by Deleting Item 20, RHR to RCIC Head Spray Line, AECM-85-0350, Discusses Util Commitments Resulting from Proposed Tech Spec Changes Re Acceptable High/Low Pressure Boundary Design for RHR Headspray Line.Handswitches Will Be Removed from Remote Shutdown Panel for Valves E12-F023 & E12-F394, ML20133P171, ML20135E723, ML20135G134, ML20136B957, ML20138H894, ML20138J716
|
MONTHYEARAECM-82-492, Requests That License Condition 2.C.(44)(i)(a) Be Revised to Require Submittal Re Automatic Depressurization Sys Logic Mods by 821215.Previous Submittal Date of 821029 Erroneously Requested Due to Revised BWR Owners Group Schedule1982-10-21021 October 1982 Requests That License Condition 2.C.(44)(i)(a) Be Revised to Require Submittal Re Automatic Depressurization Sys Logic Mods by 821215.Previous Submittal Date of 821029 Erroneously Requested Due to Revised BWR Owners Group Schedule Project stage: Other AECM-82-603, Comments on BWROG-8260, NUREG-0737,Item II.K.3.18,Mod of Automatic Depressurization Sys Logic. Option 4,providing Bypass Timer Delay,Will Assure Adequate Core Cooling During Worst Case Conditions1982-12-14014 December 1982 Comments on BWROG-8260, NUREG-0737,Item II.K.3.18,Mod of Automatic Depressurization Sys Logic. Option 4,providing Bypass Timer Delay,Will Assure Adequate Core Cooling During Worst Case Conditions Project stage: Other AECM-85-0014, Forwards Addl Info,Requested in ,Re Concerns Involving Transfer of Control to Remote Shutdown Panel Resulting in Change in Operating Status of Load That May Be Detrimental to Safe Shutdown1985-01-17017 January 1985 Forwards Addl Info,Requested in ,Re Concerns Involving Transfer of Control to Remote Shutdown Panel Resulting in Change in Operating Status of Load That May Be Detrimental to Safe Shutdown Project stage: Other ML20133P1711985-08-12012 August 1985 Proposed Tech Specs,Reflecting Design Changes & Editorial Clarification Re Leak Rate Testing of RHR to Head Spray Isolation Valve & ECCS Actuation Instrumentation Project stage: Other AECM-85-0228, Application for Amend to License NPF-29,changing Tech Specs to Reflect Design Changes & Editorial Clarifications.Fee Paid1985-08-12012 August 1985 Application for Amend to License NPF-29,changing Tech Specs to Reflect Design Changes & Editorial Clarifications.Fee Paid Project stage: Request ML20135E7231985-08-30030 August 1985 Notice of Violation from Insp on 850708-12 Project stage: Other AECM-85-0263, Forwards Application for Amend to License NPF-29,requesting one-time Tech Spec Exception for Qualifications of Replacement Individual for Chemistry/Radiation Control Superintendent Position.Fee Paid1985-09-13013 September 1985 Forwards Application for Amend to License NPF-29,requesting one-time Tech Spec Exception for Qualifications of Replacement Individual for Chemistry/Radiation Control Superintendent Position.Fee Paid Project stage: Request ML20135G1341985-09-13013 September 1985 Proposed Tech Specs Reflecting one-time Exception for Qualifications of Replacement Individual for Chemistry/ Radiation Control Superintendent Position Project stage: Other ML20135G1291985-09-13013 September 1985 Application for Amend to License NPF-29,requesting one-time Tech Spec Exception for Qualifications of Replacement Individual for Chemistry/Radiation Control Superintendent Position Project stage: Request AECM-85-0303, Proposed Tech Specs,Changing Table 3.3.7.4-1, Remote Shutdown Sys Controls by Deleting Item 20, RHR to RCIC Head Spray Line1985-09-13013 September 1985 Proposed Tech Specs,Changing Table 3.3.7.4-1, Remote Shutdown Sys Controls by Deleting Item 20, RHR to RCIC Head Spray Line Project stage: Other ML20135F1051985-09-13013 September 1985 Application for Amend to License NPF-29,changing Tech Spec Table 3.3.7.4-1, Remote Shutdown Sys Controls, by Deleting Item 20, RHR to RCIC Head Spray Line. Fee Paid Project stage: Request ML20133A7611985-09-25025 September 1985 Proposed Changes to Tech Specs 6.3.1 & 6.4.1,providing Justification for Exemption from Requirements for Senior Reactor Operator Qualifications Project stage: Request AECM-85-0304, Application for Amend to License NPF-29,supplementing 850812,23 & 30 Submittals,To Provide Justification for Exemption from Tech Spec 6.3.1 & 6.4.1 Requirements for Senior Reactor Operator Qualifications1985-09-25025 September 1985 Application for Amend to License NPF-29,supplementing 850812,23 & 30 Submittals,To Provide Justification for Exemption from Tech Spec 6.3.1 & 6.4.1 Requirements for Senior Reactor Operator Qualifications Project stage: Supplement AECM-85-0305, Forwards Resumes of Two Individuals Appointed as Supervisors to Organization Radiation Control Function,Per Request for Addl Info Re 850712 Proposed Change to Tech Spec Figure 6.2.2.-11985-10-0202 October 1985 Forwards Resumes of Two Individuals Appointed as Supervisors to Organization Radiation Control Function,Per Request for Addl Info Re 850712 Proposed Change to Tech Spec Figure 6.2.2.-1 Project stage: Request AECM-85-0306, Responds to Request for Addl Info Re 850812 Application for Amend to License NPF-29.Prompt Resolution of Questions & Approval of Previously Submitted Tech Specs Needed for Outage Scheduled to Start on 8510121985-10-0505 October 1985 Responds to Request for Addl Info Re 850812 Application for Amend to License NPF-29.Prompt Resolution of Questions & Approval of Previously Submitted Tech Specs Needed for Outage Scheduled to Start on 851012 Project stage: Request AECM-85-0341, Forwards Addl Info Re ECCS Performance Analysis Which Supports Increase in Peak Cladding Temp of 51 F Compared to Current FSAR Analysis,Per Request.Fsar Changes Will Be Made If Design Change Implemented1985-10-22022 October 1985 Forwards Addl Info Re ECCS Performance Analysis Which Supports Increase in Peak Cladding Temp of 51 F Compared to Current FSAR Analysis,Per Request.Fsar Changes Will Be Made If Design Change Implemented Project stage: Other AECM-85-0346, Application for Amend to License NPF-29,revising Tech Spec 6.3.1 for one-time Exception of Reg Guide 1.8 Re Qualifications of Chemistry/Radiation Control Superintendent1985-10-23023 October 1985 Application for Amend to License NPF-29,revising Tech Spec 6.3.1 for one-time Exception of Reg Guide 1.8 Re Qualifications of Chemistry/Radiation Control Superintendent Project stage: Request ML20138J7161985-10-23023 October 1985 Proposed Tech Spec 6.3.1 for one-time Exception of Reg Guide 1.8 Re Qualifications of Chemistry/Radiation Control Superintendent Project stage: Other ML20138J7011985-10-24024 October 1985 Forwards Application for Amend to License NPF-29,revising Tech Spec 6.3.1 for one-time Exception of Reg Guide 1.8 Re Qualifications of Chemistry/Radiation Control Superintendent.Fee Paid Project stage: Request AECM-85-0350, Discusses Util Commitments Resulting from Proposed Tech Spec Changes Re Acceptable High/Low Pressure Boundary Design for RHR Headspray Line.Handswitches Will Be Removed from Remote Shutdown Panel for Valves E12-F023 & E12-F3941985-10-30030 October 1985 Discusses Util Commitments Resulting from Proposed Tech Spec Changes Re Acceptable High/Low Pressure Boundary Design for RHR Headspray Line.Handswitches Will Be Removed from Remote Shutdown Panel for Valves E12-F023 & E12-F394 Project stage: Other ML20136B9571985-11-0808 November 1985 Amend 7 to License NPF-29,modifying Tech Specs Re Valves Listed in Tables 3.3.7.4-1,3.6.4-1 & 4.3.2-1 & Electrical Protective Devices in Tables 3.8.4.1-1 & 3.8.4.2-1 Project stage: Other ML20137Q8971985-11-22022 November 1985 Safety Evaluation Re Low Pressure ECCS Sys Pressure Permissive Interlocks.Exceeding ASME Code Allowable Design Pressure for Interlocks Unacceptable Project stage: Approval ML20137Q8901985-11-22022 November 1985 Forwards Safety Evaluation Re 850812 Request for Amend to License NPF-29,adding Pressure Permissive Interlocks to Control Circuits for Low Pressure ECCS Injection Valves,Item 13 of 850812 Request Should Be Revised Project stage: Approval ML20138H8941985-12-11011 December 1985 Proposed Tech Spec,Allowing one-time Exception Re Qualifications of Chemistry/Radiation Control Superintendent Project stage: Other AECM-85-0404, Application for Amend to License NPF-29,revising Tech Spec 6.3.1 to Allow one-time Exception Re Qualifications of Chemistry/Radiation Control Superintendent1985-12-11011 December 1985 Application for Amend to License NPF-29,revising Tech Spec 6.3.1 to Allow one-time Exception Re Qualifications of Chemistry/Radiation Control Superintendent Project stage: Request AECM-86-0006, Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid1986-01-10010 January 1986 Forwards Technical Justification for Proposal to Delete Peak Recording Accelerographs Currently Installed on Reactor Piping Locations,Per Section 16.3.1 of Sser 6 (NUREG-0831).Response by 860228 Requested.Fee Paid Project stage: Other AECM-86-0082, Supplemental Application for Amend to License NPF-29, Modifying 851114 Proposed Change Re License Condition 2.C.(28) & Revising Tech Specs Concerning Design Changes to Be Implemented During First Refueling Outage.Fee Paid1986-03-21021 March 1986 Supplemental Application for Amend to License NPF-29, Modifying 851114 Proposed Change Re License Condition 2.C.(28) & Revising Tech Specs Concerning Design Changes to Be Implemented During First Refueling Outage.Fee Paid Project stage: Supplement ML20154R5461986-03-21021 March 1986 Proposed Tech Specs Revising License Condition 2.C.(28) Re Requirement for Corporate Mgt Officials on Nuclear Operations Staff & Modifying Tables 3.3.7.2-1 & 4.3.7.2-1 to Reflect Design Change Project stage: Other ML20155D8101986-04-0808 April 1986 Summary of 860401 Meeting W/Utils Re Resolution of Issue of Interlocks for ECCS Injection Valves Which Also Function as Pressure Isolation Valves.Viewgraphs & List of Attendees Encl Project stage: Meeting ML20205S2021986-05-27027 May 1986 Forwards Safety Evaluation Supporting Util 860110 Proposal to Remove Four Peak Recording Accelerographs Installed on Reactor Piping Due to Inoperability Caused by Operating Transients & Adequacy of Other Seismic Instrumentation Project stage: Approval ML20205S2151986-05-27027 May 1986 Safety Evaluation Supporting Util 860110 Proposal to Remove Four Peak Recording Accelerographs Mounted on Reactor Piping Project stage: Approval AECM-86-0163, Provides Addl Info to 860321 Proposed Change PCOL-86/04 to License NPF-29 Re Mods to Automatic Depressurization Sys Per BWR Owners Group Evaluation of NUREG-0737,Item II.K.3.18. Info Clarifies Changes Made to Sys Initiation Circuitry1986-05-30030 May 1986 Provides Addl Info to 860321 Proposed Change PCOL-86/04 to License NPF-29 Re Mods to Automatic Depressurization Sys Per BWR Owners Group Evaluation of NUREG-0737,Item II.K.3.18. Info Clarifies Changes Made to Sys Initiation Circuitry Project stage: Request AECM-86-0111, Forwards Supplemental Info Re Design Change to Add Interlocks to ECCS Injection Valves,Per NRC 860403 Telcon. Approval of 850812 Proposed Amend to Tech Specs Also Requested1986-05-30030 May 1986 Forwards Supplemental Info Re Design Change to Add Interlocks to ECCS Injection Valves,Per NRC 860403 Telcon. Approval of 850812 Proposed Amend to Tech Specs Also Requested Project stage: Supplement ML20207E7261986-07-15015 July 1986 Proposed Changes to Tech Spec Seismic Monitoring Instrumentation Tables 3.3.7.2-1 & 4.3.7.2-1 to Delete four- Peak Recording Accelerographs on Reactor Piping & Make Measurement Values Consistent Project stage: Request AECM-86-0208, Forwards Addl Info Re Emergency Containment Venting in Response to Item 1.1 of 860527 Request.Encl Rev 1 to ...Emergency Procedures Upgrade Program Procedures Generation Package Addresses Remaining Request1986-07-15015 July 1986 Forwards Addl Info Re Emergency Containment Venting in Response to Item 1.1 of 860527 Request.Encl Rev 1 to ...Emergency Procedures Upgrade Program Procedures Generation Package Addresses Remaining Request Project stage: Request AECM-86-0221, Application for Amend to License NPF-29,changing Tech Spec Seismic Monitoring Instrumentation Tables to Delete four- Peak Recording Accelerographs on Reactor Piping & Make Measurement Values Consistent.Fee Paid1986-07-15015 July 1986 Application for Amend to License NPF-29,changing Tech Spec Seismic Monitoring Instrumentation Tables to Delete four- Peak Recording Accelerographs on Reactor Piping & Make Measurement Values Consistent.Fee Paid Project stage: Request ML20209D1521986-08-28028 August 1986 Notice of Consideration of Issuance of Amend to License NPF-29 & Proposed NSHC Determination & Opportunity for Hearing Re Addition of Specs to Table 3.3.3-1, ECCS Actuation Instrumentation Project stage: Other ML20210L7951986-08-28028 August 1986 Notice of Consideration of Issuance of Amend to License NPF-29 & Proposed Nhsc Determination & Opportunity for Hearing Re 850812,0925,1005 & 22 Requests for Revs to Listed Tech Spec Tables on ECCS Actuation Instrumentation Project stage: Other ML20209D1361986-09-0202 September 1986 Requests Notice of Consideration of Issuance of Amend to License NPF-29 & Proposed NSHC Determination & Opportunity for Hearing Re Addition of Specs to Table 3.3.3-1, ECCS Actuation Instrumentation Be Expeditiously Published in Fr Project stage: Other ML20215E4051986-10-0606 October 1986 Amend 20 to License NPF-29,revising Tech Specs to Reflect Installation of Pressure Interlocks for Injection Valves in Low Pressure ECCS & Mod to Automatic Depressurization Sys Actuation Logic Project stage: Other ML20215E4131986-10-0606 October 1986 Safety Evaluation Supporting Amend 20 to License NPF-29 Project stage: Approval AECM-86-0329, Submits List of Affected Tech Spec Pages,Effective Dates & Associated Amend Numbers,In Response to NRC 860827 & 1006 Requests1986-10-14014 October 1986 Submits List of Affected Tech Spec Pages,Effective Dates & Associated Amend Numbers,In Response to NRC 860827 & 1006 Requests Project stage: Other AECM-86-0332, Advises of Effective Dates for Amends 6 & 8 to License NPF-29 for Listed Tech Specs,In Response to 851021 & 860827 Requests1986-10-17017 October 1986 Advises of Effective Dates for Amends 6 & 8 to License NPF-29 for Listed Tech Specs,In Response to 851021 & 860827 Requests Project stage: Other 1985-08-30
[Table View] |
Text
r-y.'k,
]
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi EulMGMhid5 P. O. B O X 164 0. J A C K S O N, MIS SIS SlP PI 39215-1640 August 12, 1985 O. D. KINGSLEY, JR.
VICE PREllOENT NUCLEAR OPERATK)N5 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation j
Washington, D. C.
20555 Attention:
Mr. Harold R. Denton, Director
Dear Mr. Denton:
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 File: 0260/0840/L-860.0 Proposed Amendment to the Operating License (PCOL-85/11 Additional Submittal)
AECM-85/0228 In accordance with the provisions of 10 CFR 50.59 and 10 CFR 50.90, Mississippi Power & Light (MP&L) requests an amendment to License NPF-29, for Grand Gulf Nuclear Station (GGNS) Unit 1.
In accordance with the provisions of 10 CFR 50.30, three (3) signed originals and forty (40) copies of the requested amendment are enclosed. The attachment provides the complete technical justification and discussion to support the requested amendment. This amendment has been reviewed and accepted by the Plant Safety Review Committee (PSRC) and the Safety Review Committee (SRC).
Based on the guidelines presented in 10 CFR 50.92, it is the opinion of MP&L that this proposed amendment involves no significant hazards considerations.
In accordance with the requirements of 10 CFR 170.22, we have determined that the proposed amendment is considered to be administrative in nature.
Based on the guidance provided by the Project Manager (NRC), we have determined that the application fee is $150. A remittance of $150 is attached to this letter.
8508140185 850812
\\
DR ADOCK 05000416
>D O'
PDR s
D t
Q ;;(cde@ /(153 J14AECM85072401 - 1 Member Middle South Utilities System
7 _,-
4/
o.
e AECM-85/0228 Page 2 As a matter of good operating practice, we will maintain frequent contact
'with your staff during the review period to ensure that the date of issuance of these changes'will coincide with completion of the proposed modifications.
Yours t ly.
,/:))
ODK:dmm Attachments: GGNS PCOL-85/11 (Additional Submittal) cc:
Mr. J. B. Richard (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr. R. C. Butcher (w/a)
Mr. James M. Taylor, Director (w/a)
Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Dr. J. Nelson Grace, Regional Administrator (w/a)
U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Dr. Alto.. B. Cobb (w/a)
State Health Officer State Board of Health Box 1700 Jackson, Mississippi 39205 l
l l
l l
J14AECM85072401 - 2 l
L_ ---
: y AECM-85/0228 Page 4 BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION LICENSE No. NPF-29 DOCKET No. 50-416 IN THE MATTER OF MISSISSIPPI POWER & LIGHT COMPANY and MIDDLE SOUTH ENERGY, INC.
l and SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION AFFIRMATION I, O. D. Kingsley, Jr., being duly sworn, stated that I am Vice President, Nuclear Operations of Mississippi Power & Light Company;.that on behalf of Mississippi Power & Light Company, Middle South Energy, Inc., and South Mississippi Electric Power Association I am authorized by Mississippi Power & Light Company to sign and file with the Nuclear Regulatory Commission, this application for amendment of the Operating License of the Grand Gulf Nuclear Station; that I signed this application as Vice President, Nuclear Operations of Mississippi Power & Light Company; and that the statements made and the matters set forth therein are true and correct to t best of my knowledge, it.iormation and belief.
- 0. W Ki igsl 7
STATE OF MISSISSIPPI COUNTY OF HINDS SUBSCRIBED AND SWORN TO before me, a Notary Public, in and for the County and State above named, this / M day of h mc
, 1985.
(SEAL)
Ein L,
y Notary Public My commission expires:
f.!/ Cnrhin Errb1 SO. 21. IW J14AECM85072401 - 4