MONTHYEARML20217F1951999-10-0707 October 1999 Application for Amend to License NPF-29,to Revise Licensing Basis to Credit One of Insights/Conclusions of NUREG-1465, Revised Source Term Insights ML20211E7061999-08-20020 August 1999 Application for Amend to License NPF-29,incorporating Many of Generic Improvements Agreed Upon Between Industry & NRC Since GGNS Conversion to ITS ML20196K0791999-06-29029 June 1999 Suppl to 980720 Application for Amend to License NPF-29, Implementing BWROG Enhanced Option I-A,reactor Stability long-term Solution.Rev to TS 3.4.1 Inadvertently Omitted from Original Application ML20196G6901999-06-23023 June 1999 Application for Amend to License NPF-29,revising TS Associated with Various Esfss Which Need No Longer Be Credited Following Design Basis Fuel Handling Accident ML20206K5241999-05-0606 May 1999 Application for Amend to License NPF-29,changing TSs Required to Support Ggns,Cycle 11 Operation,Including Slmcpr.Portions of Encl Re Addl Info on Calculated Cycle Specific SL MCPR for Plant Cycle 11 Withheld ML20206R9271999-01-12012 January 1999 Application for Amends to Licenses NPF-29 & NPF-47,proposing Required Actions Consistent with NRC Accepted Change to BWR Improved TS NUREG-1433 & NUREG-1434 ML20236T1551998-07-20020 July 1998 Application for Amend to License NPF-29,revising TSs Re BWROG Enhanced Option I-A Reactor Stability Long Term Solution ML20198J3451998-01-0909 January 1998 Revised Application for Amend to License NPF-29,providing Clarifications to Amend & Adding Restriction to Allowed Interval Extensions Re Option B of 10CFR50,app J ML20198N3851997-10-28028 October 1997 Application for Amend to License NPF-29,revising TS to Implement Option B & Ref SE Issued by NRR for Ggns'S App J Exemption as Implementing Document for performance-based Leakage Testing Program ML20210V5461997-09-18018 September 1997 Application for Amend to License NPF-29,reflecting Decrease of Two Recirculation Loop SLMCPR to 1.11 & Single Recirculation Loop SLMCPR Limit to 1.12.Proprietary Info Re SLMCPR for Cycle 10,encl.Proprietary Info Withheld ML20134E1191996-10-22022 October 1996 Application for Amend to License NPF-29,revising TS Figure 3.4.11-1, Minimum Reactor Vessel Metal Temperature Vs Reactor Vessel Pressure, Curves Using Methodology of Reg Guide 1.99,Rev 2, Radiation Embrittlement.. ML20117P4421996-09-19019 September 1996 Application for Amend to License NPF-29,changing Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20117G6661996-08-27027 August 1996 Application for Amend to License NPF-29,modifying Tech Specs Surveillance Requirements for Safety/Relief Valves ML20116F0141996-07-31031 July 1996 Rev 1 to Application for Amend to License NPF-29,revising TSs Required to Support Cycle 9,reload 8.Rev 1 to J11-02863SLMCPR, GGNS Cycle 9 Safety Limit MCPR Analysis Encl.Rept Withheld ML20113B7341996-06-20020 June 1996 Application for Amend to License NPF-29,redefining Secondary Containment Boundary to Allow Encl Bldg to Be Inoperable During Upcoming Refueling Outage ML20112E1741996-05-31031 May 1996 Application for Amends to Licenses NPF-29 & NPF-47 Adding Addl Acceptable Required Actions to Tech Spec Limiting Condition for Operation (LCO) 3.9.1, Refueling Equipment Interlocks ML20117F4541996-05-0909 May 1996 Application for Amend to License NPF-29,modifying SRV Surveillance Test for Relief Mode of Operation ML20117D6901996-05-0909 May 1996 Application for Amend to License NPF-29,revising TSs to Support Unit 1,cycle 9 Including Changes to SLMCPR & Ref for Analytical Methods Used to Determine Core Operating Limits ML20111B2631996-05-0808 May 1996 Application for Amend to License NPF-29,placing Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20108E3551996-05-0606 May 1996 Application for Amend to License NPF-29,changing Name from Mississippi Power & Light to Entergy Mississippi,Inc ML20107E2521996-04-18018 April 1996 Application for Amend to License NPF-29,prohibiting Performance of 24-h EDG Maint Run While Unit in Either Mode 1/2 RBG-42766, Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells1996-04-18018 April 1996 Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells ML20100J8311996-02-22022 February 1996 Application for Amend to License NPF-29,modifying Safety Setpoint to Tolerance Requirements for Safety/Relief Valves ML20097C3491996-02-0101 February 1996 Application for Amend to License NPF-29,revising TS Bases to Include Changes Since 950221 Approval of TS Bases RBG-42193, Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage1995-11-20020 November 1995 Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage ML20087B5031995-08-0101 August 1995 Application for Amend to License NPF-29,by Revising TS Assoc W/Various ESF Sys Following Design Fuel Handling Accident ML20086N2071995-07-21021 July 1995 Application for Amend to License NPF-29,proposing to Recapture Approx 2 1/2 Yrs of Low/No Power Operation by Extending 40-yr Operating License Term from 220616 to 241101 ML20078S4891995-02-14014 February 1995 Application for Amend to License NPF-29 Consisting of Changes to TS Requirements 4.4.1.4.a.1 & 4.6.1.4.a.2 ML20078N6481995-02-10010 February 1995 Application for Amend to License NPF-29,consisting of Mod to Proposed Amend to OL (PCOL-93/13),requesting to Perform Drywell Bypass Leakage Rate Surveillance on Performance Based Interval ML20079B4431994-11-0909 November 1994 Application for Amend to License NPF-29,revising TS Associated W/Various ESF Sys Following Design Basis Fuel Handling accident.Mark-up of Current Ts,Proposed TS & mark- Up Improved TS Encl ML20076F9781994-10-12012 October 1994 Application for Amend to License NPF-29,consisting of PCOL-94/01,closing & Deleting License Condition 2.C.(26) for Turbine Disc integrity.Mark-up of Affected OL Page & Proprietary Supporting Info Encl.Proprietary Info Withheld ML20069P4401994-06-17017 June 1994 Proposed Amend to OL (PCOL-94/02),removing License Conditions for EDGs Associated w/NUREG-1216 ML20059H6011994-01-13013 January 1994 Application for Amend to License NPF-29,consisting of Proposed Amend to OL PCOL-93/15,removing 2,324 Spent Fuel Pool Storage Limit & Allowing Full Use of Spent Fuel Storage Spaces ML20059A4801993-10-22022 October 1993 Application for Amend to License NPF-29,modifying Testing Frequencies for Drywell Bypass Test & Airlock Tests ML20059B0131993-10-15015 October 1993 Application for Amend to License NPF-29,converting Current GGNS TS to TS Based Largely on NUREG-1434,Rev 0 ML20056E2861993-08-17017 August 1993 Application for Amend to License NPF-29,proposing Changes to Amend TS Section 3/4.3.7.10, Loose Part Detection Sys by Relocating Loose Part Detection Instrumentation to Administrative Controls ML20056D5321993-08-11011 August 1993 Proposed Change to OL (PCOL-93/09) to License NPF-29, Amending TS Section 3/4.3.7.5 by Relocating Certain Accident Monitoring Instrumentation from TS to Administrative Control,Per NUREG-1434,Rev 0,w/respect to RG 1.97 ML20046D2041993-08-11011 August 1993 Proposed Change to OL (PCOL-93/07) to License NPF-29, Amending TS Section 3/4.3.7.10, Loose Part Detection Sys by Relocating Locating Loose Part Detection Instrumentation from TS to Administrative Controls,Per NUREG-1434,Rev 0 ML20046D1911993-08-11011 August 1993 Proposed Change to OL (PCOL-93/06) to License NPF-29, Revising TS to Support Compliance W/New Requirements of 10CFR20 & 10CFR50.36a ML20056C7131993-07-15015 July 1993 Application for Amend to License NPF-29,proposing Changes to Remove Operability Requirements for auto-test Feature of Load Shedding & Sequencing Sys & Increase AOT for Inoperable Load Shedding & Sequencing Sys from Eight to Twelve Hours ML20045H7111993-07-14014 July 1993 Application for Amend to License NPF-29,changing TS to Eliminate Previous Retrictions on Ensuring Operability of Igniters in Encl Areas & Igniters in Open Areas Adjacent to Inoperable Igniters & Redefining Hydrogen Ignition Sys ML20044F1571993-05-20020 May 1993 Proposed Amend PCOL-93/04 to License NPF-29,revising TS 4.8.3.1.2 & 4.8.3.2.2 to Remove Operability Requirements for auto-test Feature of Load Shedding & Sequencing (LSS) Sys & Increase AOT for Inoperable LSS Sys from Eight to 24 H ML20044F1621993-05-20020 May 1993 Proposed Amend PCOL-92/09 to License NPF-29,removing Unnecessary Operability Requirements for IRMs & APRMs During Plant Shutdown Conditions.Ts Changes Follow NUREG-1434, Rev 0 Requirements ML20116D1391992-10-29029 October 1992 Application for Amend to License NPF-29,consisting of Proposed Change,Revising TS Per Generic Ltr 88-16, Removal of Cycle Specific Parameter Limits from TS, That Will Change Each Fuel Cycle ML20118A5681992-09-14014 September 1992 Application for Amend to License NPF-29,deleting TS Tables 3.6.4-1 Re Containment & Drywell Isolation Valves, 3.6.6.2-1 Re Secondary Containment Ventilation Sys & 3.8.4.2-1 Re MOV Thermal Overload Protection,Per GL 91-08 ML20113H6001992-07-29029 July 1992 Application for Amend to License NPF-29,consisting of PCOL-92/03,changing Selected TS Instrumentation Surveillance Test Intervals & Allowed Outage Times,Based on Cited GE Repts ML20101B6681992-05-29029 May 1992 Application for Amend to License NPF-29,changing TS Bases 3/4.9.7, Crane Travel - Spent Fuel & Upper Containment Fuel Storage Pools ML20096B8861992-05-0606 May 1992 Application for Amend to License NPF-29,changing TS Re Primary Containment Penetration Conductor Overcurrent Protective Devices,Under Exigent Circumstances,Per Generic Ltr 89-10 ML20095K0351992-04-30030 April 1992 Application for Amend to License NPF-29,changing TS 3/4.3.1 Re Reactor Protection Sys instrumentation,3/4.3.6 Re Control Rod Block Instrumentation & 3/4.3.7.6 Re Source Range Monitors,Per Violations in Insp Rept 50-416/92-04 ML20095E7341992-04-22022 April 1992 Suppl to 910626 Application for Amend to License NPF-29, Modifying Wording of Requested Change to LCO 3.3.2,Action B Re Extension of Instrumentation Surveillance Intervals & Allowed Outage Times 1999-08-20
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217F1951999-10-0707 October 1999 Application for Amend to License NPF-29,to Revise Licensing Basis to Credit One of Insights/Conclusions of NUREG-1465, Revised Source Term Insights ML20211E7061999-08-20020 August 1999 Application for Amend to License NPF-29,incorporating Many of Generic Improvements Agreed Upon Between Industry & NRC Since GGNS Conversion to ITS ML20196K0791999-06-29029 June 1999 Suppl to 980720 Application for Amend to License NPF-29, Implementing BWROG Enhanced Option I-A,reactor Stability long-term Solution.Rev to TS 3.4.1 Inadvertently Omitted from Original Application ML20196G6901999-06-23023 June 1999 Application for Amend to License NPF-29,revising TS Associated with Various Esfss Which Need No Longer Be Credited Following Design Basis Fuel Handling Accident ML20206K5241999-05-0606 May 1999 Application for Amend to License NPF-29,changing TSs Required to Support Ggns,Cycle 11 Operation,Including Slmcpr.Portions of Encl Re Addl Info on Calculated Cycle Specific SL MCPR for Plant Cycle 11 Withheld ML20206R9271999-01-12012 January 1999 Application for Amends to Licenses NPF-29 & NPF-47,proposing Required Actions Consistent with NRC Accepted Change to BWR Improved TS NUREG-1433 & NUREG-1434 ML20236T1551998-07-20020 July 1998 Application for Amend to License NPF-29,revising TSs Re BWROG Enhanced Option I-A Reactor Stability Long Term Solution ML20217P0241998-04-0606 April 1998 Amend 135 to License NPF-29,revising TSs for GGNS to Permit Implementation of Containment Leak Rate Testing Provisions of 10CFR50,App J,Option B ML20198J3451998-01-0909 January 1998 Revised Application for Amend to License NPF-29,providing Clarifications to Amend & Adding Restriction to Allowed Interval Extensions Re Option B of 10CFR50,app J ML20198N3851997-10-28028 October 1997 Application for Amend to License NPF-29,revising TS to Implement Option B & Ref SE Issued by NRR for Ggns'S App J Exemption as Implementing Document for performance-based Leakage Testing Program ML20210V5461997-09-18018 September 1997 Application for Amend to License NPF-29,reflecting Decrease of Two Recirculation Loop SLMCPR to 1.11 & Single Recirculation Loop SLMCPR Limit to 1.12.Proprietary Info Re SLMCPR for Cycle 10,encl.Proprietary Info Withheld ML20134E1191996-10-22022 October 1996 Application for Amend to License NPF-29,revising TS Figure 3.4.11-1, Minimum Reactor Vessel Metal Temperature Vs Reactor Vessel Pressure, Curves Using Methodology of Reg Guide 1.99,Rev 2, Radiation Embrittlement.. ML20117P4421996-09-19019 September 1996 Application for Amend to License NPF-29,changing Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20117G6661996-08-27027 August 1996 Application for Amend to License NPF-29,modifying Tech Specs Surveillance Requirements for Safety/Relief Valves ML20116F0141996-07-31031 July 1996 Rev 1 to Application for Amend to License NPF-29,revising TSs Required to Support Cycle 9,reload 8.Rev 1 to J11-02863SLMCPR, GGNS Cycle 9 Safety Limit MCPR Analysis Encl.Rept Withheld ML20113B7341996-06-20020 June 1996 Application for Amend to License NPF-29,redefining Secondary Containment Boundary to Allow Encl Bldg to Be Inoperable During Upcoming Refueling Outage ML20112E1741996-05-31031 May 1996 Application for Amends to Licenses NPF-29 & NPF-47 Adding Addl Acceptable Required Actions to Tech Spec Limiting Condition for Operation (LCO) 3.9.1, Refueling Equipment Interlocks ML20117D6901996-05-0909 May 1996 Application for Amend to License NPF-29,revising TSs to Support Unit 1,cycle 9 Including Changes to SLMCPR & Ref for Analytical Methods Used to Determine Core Operating Limits ML20117F4541996-05-0909 May 1996 Application for Amend to License NPF-29,modifying SRV Surveillance Test for Relief Mode of Operation ML20111B2631996-05-0808 May 1996 Application for Amend to License NPF-29,placing Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20108E3551996-05-0606 May 1996 Application for Amend to License NPF-29,changing Name from Mississippi Power & Light to Entergy Mississippi,Inc ML20107E2521996-04-18018 April 1996 Application for Amend to License NPF-29,prohibiting Performance of 24-h EDG Maint Run While Unit in Either Mode 1/2 RBG-42766, Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells1996-04-18018 April 1996 Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells ML20100J8311996-02-22022 February 1996 Application for Amend to License NPF-29,modifying Safety Setpoint to Tolerance Requirements for Safety/Relief Valves ML20097C3491996-02-0101 February 1996 Application for Amend to License NPF-29,revising TS Bases to Include Changes Since 950221 Approval of TS Bases RBG-42193, Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage1995-11-20020 November 1995 Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage ML20087B5031995-08-0101 August 1995 Application for Amend to License NPF-29,by Revising TS Assoc W/Various ESF Sys Following Design Fuel Handling Accident ML20086N2071995-07-21021 July 1995 Application for Amend to License NPF-29,proposing to Recapture Approx 2 1/2 Yrs of Low/No Power Operation by Extending 40-yr Operating License Term from 220616 to 241101 ML20078S4891995-02-14014 February 1995 Application for Amend to License NPF-29 Consisting of Changes to TS Requirements 4.4.1.4.a.1 & 4.6.1.4.a.2 ML20078N6481995-02-10010 February 1995 Application for Amend to License NPF-29,consisting of Mod to Proposed Amend to OL (PCOL-93/13),requesting to Perform Drywell Bypass Leakage Rate Surveillance on Performance Based Interval ML20079B4431994-11-0909 November 1994 Application for Amend to License NPF-29,revising TS Associated W/Various ESF Sys Following Design Basis Fuel Handling accident.Mark-up of Current Ts,Proposed TS & mark- Up Improved TS Encl ML20076F9781994-10-12012 October 1994 Application for Amend to License NPF-29,consisting of PCOL-94/01,closing & Deleting License Condition 2.C.(26) for Turbine Disc integrity.Mark-up of Affected OL Page & Proprietary Supporting Info Encl.Proprietary Info Withheld ML20069P4401994-06-17017 June 1994 Proposed Amend to OL (PCOL-94/02),removing License Conditions for EDGs Associated w/NUREG-1216 ML20059H6011994-01-13013 January 1994 Application for Amend to License NPF-29,consisting of Proposed Amend to OL PCOL-93/15,removing 2,324 Spent Fuel Pool Storage Limit & Allowing Full Use of Spent Fuel Storage Spaces ML20059A4801993-10-22022 October 1993 Application for Amend to License NPF-29,modifying Testing Frequencies for Drywell Bypass Test & Airlock Tests ML20059B0131993-10-15015 October 1993 Application for Amend to License NPF-29,converting Current GGNS TS to TS Based Largely on NUREG-1434,Rev 0 ML20056E2861993-08-17017 August 1993 Application for Amend to License NPF-29,proposing Changes to Amend TS Section 3/4.3.7.10, Loose Part Detection Sys by Relocating Loose Part Detection Instrumentation to Administrative Controls ML20046D2041993-08-11011 August 1993 Proposed Change to OL (PCOL-93/07) to License NPF-29, Amending TS Section 3/4.3.7.10, Loose Part Detection Sys by Relocating Locating Loose Part Detection Instrumentation from TS to Administrative Controls,Per NUREG-1434,Rev 0 ML20046D1911993-08-11011 August 1993 Proposed Change to OL (PCOL-93/06) to License NPF-29, Revising TS to Support Compliance W/New Requirements of 10CFR20 & 10CFR50.36a ML20056D5321993-08-11011 August 1993 Proposed Change to OL (PCOL-93/09) to License NPF-29, Amending TS Section 3/4.3.7.5 by Relocating Certain Accident Monitoring Instrumentation from TS to Administrative Control,Per NUREG-1434,Rev 0,w/respect to RG 1.97 ML20056C7131993-07-15015 July 1993 Application for Amend to License NPF-29,proposing Changes to Remove Operability Requirements for auto-test Feature of Load Shedding & Sequencing Sys & Increase AOT for Inoperable Load Shedding & Sequencing Sys from Eight to Twelve Hours ML20045H7111993-07-14014 July 1993 Application for Amend to License NPF-29,changing TS to Eliminate Previous Retrictions on Ensuring Operability of Igniters in Encl Areas & Igniters in Open Areas Adjacent to Inoperable Igniters & Redefining Hydrogen Ignition Sys ML20044F1571993-05-20020 May 1993 Proposed Amend PCOL-93/04 to License NPF-29,revising TS 4.8.3.1.2 & 4.8.3.2.2 to Remove Operability Requirements for auto-test Feature of Load Shedding & Sequencing (LSS) Sys & Increase AOT for Inoperable LSS Sys from Eight to 24 H ML20044F1621993-05-20020 May 1993 Proposed Amend PCOL-92/09 to License NPF-29,removing Unnecessary Operability Requirements for IRMs & APRMs During Plant Shutdown Conditions.Ts Changes Follow NUREG-1434, Rev 0 Requirements ML20116D1391992-10-29029 October 1992 Application for Amend to License NPF-29,consisting of Proposed Change,Revising TS Per Generic Ltr 88-16, Removal of Cycle Specific Parameter Limits from TS, That Will Change Each Fuel Cycle ML20118A5681992-09-14014 September 1992 Application for Amend to License NPF-29,deleting TS Tables 3.6.4-1 Re Containment & Drywell Isolation Valves, 3.6.6.2-1 Re Secondary Containment Ventilation Sys & 3.8.4.2-1 Re MOV Thermal Overload Protection,Per GL 91-08 ML20113H6001992-07-29029 July 1992 Application for Amend to License NPF-29,consisting of PCOL-92/03,changing Selected TS Instrumentation Surveillance Test Intervals & Allowed Outage Times,Based on Cited GE Repts ML20101B6681992-05-29029 May 1992 Application for Amend to License NPF-29,changing TS Bases 3/4.9.7, Crane Travel - Spent Fuel & Upper Containment Fuel Storage Pools ML20096B8861992-05-0606 May 1992 Application for Amend to License NPF-29,changing TS Re Primary Containment Penetration Conductor Overcurrent Protective Devices,Under Exigent Circumstances,Per Generic Ltr 89-10 ML20095K0351992-04-30030 April 1992 Application for Amend to License NPF-29,changing TS 3/4.3.1 Re Reactor Protection Sys instrumentation,3/4.3.6 Re Control Rod Block Instrumentation & 3/4.3.7.6 Re Source Range Monitors,Per Violations in Insp Rept 50-416/92-04 1999-08-20
[Table view] |
Text
- - --- - -- -- - - - _-
Enttrgy Op rntlana,Inc.
W ENTERGY eo eox 756 Port Gibson.MS 39150 Tel 601437 2800 C. R. Hutchinson We Present Gt Ntric;v Stiton May 6, 1996 U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C. 20555 Attention: Document Control Desk
Subject:
Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 Change in Company Name from Mississippi Power and Light to Entergy Mississippi, Inc.
Proposed Amendment to the Operating License (PCOL-96/06)
GNRO-96/00052 Gentlemeri:
Entergy Operations, Inc. is submitting by this letter a proposed amendment to the Grand Gulf Nuclear Station (GGNS) Operating License. The proposed amendment would reflect that the name of Mississippi Power & Light Company (MP&L) has been changed to Entergy Mississippi, Inc. This is only a name change. The corporate existence continues uninterrupted and alllegal characteristics remain the same. There is no change in the state of incorporation, registered agent, registered office, directors, officers, rights or liabilities of the company. Noris there a change in the function of the Company or the way in which it does business. MP&L's financial responsibility for GGNS and its sources of funds to support the facility will remain the same. Further, this name change does not impact the existing ownership of GGNS or the existing entitlement to power and will not alter the existing antitrust license conditions applicable to MP&L or MP&L's ability to comply with these conditions or with any of its other obligations or responsibilities under the license.
This application is being filed simultaneously with a similar applicat;on by Arkansas Power
& Light Company to change its name to Entergy Arkansas, Inc. in the Arkansas Nuclear One, Units 1 and 2, licenses, by Gulf States Utilities, Inc. to change its name to Entergy Gulf States, Inc. In the River Bend Station license, and by Louisiana Power & Light Company to change its name to Entergy Louisiana, Inc in the Waterford 3 license.
100040 I
! 9605100201 960506 PDR ADOCK 05000416 P PDR pf
'If
1 l
May 6, 1996 GNRO-96/00052 Page 2 of 4 These name changes are being made to improve customer identification by establishing a consistent, well recognized name, "Entergy", for our business in the region that we serve. The company name changes became effective April 22, 1996. We request NRC Staff complete its review and approval of this administrative change at its earliest convenience.
Attach nent 2 provides a detailed description of the proposed changes,
} justification, and the No Significant Hazards Considerations. Attachment 3 is a copy of the marked-up Facility Operating License and Antitrust Condition pages.
Numerous other Entergy Operations documents will require revision (for example, l Updated Final Safety Analysis Report). Those document revisions are forthcoming.
Based on the guidelines in 10 CFR 50.92, Entergy Operations, Inc. has 4
concluded that this proposed amendment involves no significant hazards
- considerations. Attachment 2 details the basis for this determination.
In accordance with the provisions of 10 CFR 50.4, the signed original of the !
requested amendment is enclosed.
Yours truly,
/ f H/MJL
/p attachments: 1. Affirmr n per 10 CFR 50.30 (1 page)
- 2. Discus.an and Justification (4 pages) i 3. Mark-up of Affected Facility Operating License and Antitrust Conditions cc: (See Next Page)
May 6, 1996 GNRO-96/00052 Page 3 of 4 i
cc: Mr. J. Tedrow (w/a)
Mr. R. B. McGehee (w/a) !
Mr. N. S. Reynolds (w/a) )
Mr. H. L. Thomas (w/o)
Mr. J. W. Yelverton (w/o)
Mr. Leonard J. Callan (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 ,
Arlington, Texas 76011 Mr. J. N. Donohew, Project Manager (w/2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 Dr. Eddie F. Thomspon (w/a)
State Health Officer State Board of Health l P.O. Box 1700 l Jackson, Mississippi 39205
~
,, Attachment 1 to GNRO-96/00052
. i i .
BEFORE THE i l
UNITED STATES NUCLEAR REGULATORY COMMISSION i
LICENSE NO. NPF-29 1
DOCKET NO. 50-416 4
IN THE MATTER OF j 1
MISSISSIPPI POWER & LIGHT COMPANY j and l l SYSTEM ENERGY RESOURCES, INC. I j and 4
SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION I and l
4 ENTERGY OPERATIONS, INC. l l
AFFIRMATION
) I, C. R. Hutchinson, being duly swom, state that I am Vice President, Operations Grand Gulf Nuclear Station, of Entergy Operations, Inc.; that on behalf of Entergy Operations,
, Inc., System Energy Resources, Inc., and South Mississippi Electric Power Association I am authorized by Entergy Operations, Inc. to sign and fi!e with the Nuclear Regulatory
- Commission, this application; that I signed this application as the Vice President,
, Operations Grand Gulf Nuclear Station, of Entergy Operations, Inc.; and that the statements made and the matters set forth therein are true and correct to the best of my knowledge, information and belief.
l
/, -
l' C. R. Hutchinson STATE OF MISSISSIPPI COUNTY OF ClasAcene SUBSCRIBED AND SWORN T Public, in and for the County and
. Stt:te above named, this 8g before dayme, of aN ety ,1996.
s
.(SEAL)
Notary Public Y6Titn K My cemmisalon expires:
ESEkEEdEdE53N soxe umu == == ==
w
. Attachment 2 to GNRO-96/00052 l
l CHANGE IN COMPANY NAME FROM MISSISSIPPI POWER &
LIGHT TO ENTERGY MISSISSIPPI, INC.
PROPOSED AMENDMENT TO THE OPERATING LICENSE DISCUSSION AND JUSTIFICATION
-.r, r v
l-i Attachment 2 to GNRO-96/00052 Page 1 of 3 i
A. AFFECTED DOCUMENT (S)
The following document is affected by the proposed change.
Facility Operating License, License No. NPF-29 Antitrust Conditions, Appendix C to Operating License No. NPF-29 4
] The proposed changes are detailed in Attachment 3.
B. BACKGROUND The name of one of the license holders for Grand Gulf Nuclear Station has changed effective April 22,1996. The change is:
Mississippi Power & Light Company is now Entergy Mississippi, Inc.
This is only a name change. The corporate existence continues uninterrupted and all legal characteristics remain the same. There is no change in the state of incorporation, registered agent, registered office, directors, officers, rights or liabilities of the operating companies. These name changes are being made to improve customer identification by establishing a consistent, well recognized name, "Entergy", for our business in the region that we serve.
To reflect th.e name change of Mississippi Power & Light Company is an administrative change to the license. It does not require a technical, financial qualification, or an antitrust review.
C. CURRENT TECHNICAL SPECIFICATION REQUIREMENTS The current Facility Operating License and Antitrust Conditions use the wording Mississippi Power & Light Company (MP&L) and MP&L. Due to a company name change, this name should be changed to reflect the new company name.
D. PROPOSED TECHNICAL SPECIFICATION CHANGE The proposed change replaces the words Mississippi Power & Licht Company (MP&L) or MP&L in the Facility Operating License and Antitrust Conditions with the new company name, Entergy Mississippi, Inc.
E. JUSTlFICATION This is only a name change. The corporate existence continues uninterrupted and all legal characteristics remain the same. There is no change in the state of incorporation, registered agent, registered office, directors, officers, rights or liabilities of the operating companies. These name changes are being made to improve customer identification by establishing a consistent, well recognized name, "Entergy", for our business in the region that we serve.
l l
Attachment 2 to GNRO-96/00052 Page 2 of 3 f
Therefore, this change does not reduce the level of safety imposed by the current requirements.
F. ENVIRONMENTAL CONSIDERATION 10 CFR 51.22 (c) identifies certain licensing and regulatory actions which are eligible for categorical exclusion from the requirement to perform an environmental assessment. Entergy Operations, Inc. has reviewed this request and determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22 (c). Pursuant to 10 CFR 51.22 ,
(b), no environmental impact statement or environmental assessment needs to '
be prepared in connection with the issuance of this amendment.
G. NO SIGNIFICANT HAZARDS CONSIDERATION l
Entergy Operations, Inc. proposes to change the current Grand Gulf Nuclear l
Station Facility Operating License and Antitrust Conditions. The specific ;
proposed change is to reflect that the name of one of the companies owning Grand Gulf Nuclear Station has legally changed from Mississippi Power & Light ;
Company to Entergy Mississippi, Inc. i The Commission has provided standards for determining whether a no signifier 1t hazards consideration exists as stated in 10 CFR 50.92(c). A proposed amendment to an operating license involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not:
(1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety.
Entergy Operations, Inc. has evaluated the no significant hazards consideration in its request for this license amendment and determined that no significant hazards consideration results from this change. In accordance with 10 CFR 50.91(a), Entergy Operations, Inc. is providing the analysis of the proposed amendment against the three standards in 10 CFR 50.92(c). A description of the no significant hazards consideration determination follows:
- 1. The proposed change does not significantly increase the probability or consequences of an accident previously evaluated.
The proposed change documents changing the legal name of the company. The proposed change will not affect any other obligations. The company will still own all of the same assets, serve the same customers, and all existing obligations and commitments will continue unaffected.
, . Attachment 2 to GNRO-96/00052 Page 3 of 3 Therefore, the proposed change does not significantly increase the probability or consequences of an accident previously evaluated.
II. The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
The administrative changes in the Operating License requirements do not involve any change in the design or operation of the plant. The company will still own all of the same assets, serve the same customers, and all existing obligations and commitments will continue unaffected.
Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.
Ill. The proposed change does not involve a significant reduction in a margin of safety.
The proposed change is administrative in nature, as described above; therefore, this change does not reduce the level of safety imposed by any current requirements. The company will still own all of the same assets, serve the same customers, and all existing obligations and commitments will continue unaffected.
Therefore, the proposed changes do not cause a significant reduction in the margin of safety.