B16088, Forwards Monthly Operating Report for Millstone Nuclear Power Station,Unit 1 for Nov 1996 & Revised Rept for Dec 1995 & Jan-Oct 1996

From kanterella
(Redirected from ML20132D658)
Jump to navigation Jump to search
Forwards Monthly Operating Report for Millstone Nuclear Power Station,Unit 1 for Nov 1996 & Revised Rept for Dec 1995 & Jan-Oct 1996
ML20132D658
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/16/1996
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20132D663 List:
References
B16088, NUDOCS 9612200063
Download: ML20132D658 (3)


Text

-

5 l').

n,,\\ Northeast naimme orrim. nope rerry na., roierrora, er Utilities System e.o w 128 i

Waterrord, CT 06385-0128 l

(203) 447-1791

]

DEC 161996 Docket Nos. 50-245 B16088 Re: 10CFR50.71(a) i U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No.1 Facility Operating License No. DPR-21 Monthly Operating Report l

In accordance with the reporting requirements of Technical Specification Section 6.9.1.6 for Millstone Unit No.1, enclosed is the monthly operating report for the month of November 1996 l

Millstone Unit No 1 has recently chosen to redefine the nature of its continued shutdown, due j

to the fact that the Unit is classified as a Category 3 facility which requires NRC approval to restart. Also, the NRC has issued a Confirmatory Order requiring implementation of an j

independent Corrective Action Verification Program, and has issued an Order requiring a third-party review of the Employee Concerns Program at Millstone Station. Millstone Unit No.1 has I

chosen December 13,1995, as the date when the present outage became a forced outage.

This was the date that Millstone Unit No.1 received a request for information pursuant to 10CFR50.54(f).m This redefinition has affected the cumulative totals for forced shutdown rates in the Millstone Unit No.1 reports dating back to December 1995. Previous reports have been revised to reflect this change in definition of the continued shutdowns, and have been provided as an attachrc. ant to this letter.

l Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY j

N

] 90 n 4 g*

PaulIIInnenkamp V

Director - Unit Operations X$

Millstone Unit No.1 i

Attachments (2) cc:

See page 2

\\

(1) NRC letter to R. E. Busch, dated December 13,1995.

I 9612200063 961216 PDR ADOCK 05000245 R

PDR

s

,~

U. S. Nuclear Regulatory Commission B16088/Page 2 j

cc:

Dr. W. D. Travers, Director, Special Projects H. J. Miller, Region ! Administrator i

S. DembOK, NRC Praject Manager, Millstone Unit No.1 T. A. Eastick, Senior Resident inspector, Millstone Unit No.1 l

r d

1 4

.~

Docket No. 50-245 B16088 j

Millstone Unit No.1 Facility Operating License No. DPR-21 i

Monthly Operating Report - November 4

December 1996