MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0009, Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0474, Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0435, Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0375, Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant JAFP-97-0341, Monthly Operating Rept for Aug 1997 for Jfnpp1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Jfnpp JAFP-97-0297, Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0242, Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0203, Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp JAFP-97-0178, Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0126, Monthly Operating Rept for Mar 1997 for JAFNPP1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for JAFNPP JAFP-97-0093, Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant JAFP-97-0056, Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0012, Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0476, Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant JAFP-96-0448, Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0401, Monthly Operating Rept for Sept 1996 for Jfnpp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Jfnpp JAFP-96-0352, Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0300, Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0275, Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0240, Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0196, Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant1996-04-30030 April 1996 Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0156, Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0113, Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0066, Monthly Operating Rept for Jan 1996 for JAFNPP1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for JAFNPP JAFP-96-0023, Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0535, Monthly Operating Rept for Nov 1995 for Jafnpp1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Jafnpp JAFP-95-0486, Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant JAFP-95-0444, Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant JAFP-95-0413, Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0372, Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with ML20216D9541999-07-28028 July 1999 Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii) ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with1999-06-0202 June 1999 Annual Summary of Changes,Tests & Experiments for 1997/1998. with JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced ML20202J0891999-02-0303 February 1999 Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power Plant ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20198F9991998-12-0404 December 1998 Assessment of Licensing Basis for Use of Containment Overpressure Credit for Net Positive Suction Head Analyses Power Authority of State of New York,James a Fitzpatrick Nuclear Power Plant ML20196J3501998-12-0404 December 1998 SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with ML20196F9251998-11-25025 November 1998 Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant ML20195J7521998-11-18018 November 1998 Rev 7 to Jaf Colr ML20195K4211998-11-17017 November 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii) ML20195E1051998-11-13013 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817 ML20197G6221998-11-0606 November 1998 Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick Sfp ML20155H5321998-11-0303 November 1998 Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD Bolting ML20155H5801998-11-0303 November 1998 Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XI JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20155C2821998-10-30030 October 1998 Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant ML20154L6591998-10-14014 October 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000 JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20153D2591998-09-21021 September 1998 SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement ML20153B5611998-09-0101 September 1998 Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer Replacement ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant ML20237E8361998-08-25025 August 1998 Rev 6 to Colr ML20237E9471998-08-0808 August 1998 Rev 6 to Colr JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant ML20236X5881998-07-29029 July 1998 Safety Evaluation Supporting Amend 245 to License DPR-59 ML20236V8181998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant ML20153B5781998-07-28028 July 1998 Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer Replacement ML20236X3831998-07-14014 July 1998 Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06 ML20154L9201998-07-10010 July 1998 SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP ML20202G9081998-02-0606 February 1998 Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2 JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] |
Text
__
.,. .g OPERATING DATA REPORT DOCKET NO. 50-333 DATE Mar 1985 COMPLETED hy J. Cook TELEPHONE (315)342-3840
_0PERATING STATUS
- 1. Unit Name: FitzPatrick : Notes :
- 2. Reporting Period: 850201 - 850228 : :
- 3. Licensed Thermal Power (MWt): 2436 : :
- 4. Nameplate Rating (Gross MWe): 883 : :
- 5. Design Electrical Rating (Net MWe): 821 : :
- 6. Maximum Dependable Capacity (Gross MWe): 830 : :
- 7. Maximum Dependable Capacity (Net MWe): ~B10
- 8. If Changes occur in Capacity Ratings (Items 3 Through 7) Since Last Report,Give Reasons:
NONE
- 9. Power Level To Which Restricted, If Any (Net MWe): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 672 1416 84097
- 12. Number Of Hours Reactor Was Critical 352.8 1096.8 00/12.5
- 13. Reactor Reserve Shutdown Hours 0 0 u
- 14. Hours Generator On-Line 352.8 1096.5 39U44.1
- 15. Unit Reserve Shutdown Hours 0 0 u
- 16. Cross Thermal Energy Generated (MWH) 836136 2555532 123494/50
- 17. Gross Electrical Energy Generated (MWH) 286010 8/3930 43134ziu
- 18. Net Electrical Energy Generated (MWH) 276710 845655 412436/U
- 19. Unit Service Factor 52.5% 77.5% 70.2%
- 20. Unit Availability Factor 52.5% 77.5% /U.2%
- 21. Unit Capacity Factor (Using MDC Net) 50.8% 73.7% 63./A
- 22. Unit Capacity Factor (Using DER Net) 50.2% 72.7% 59.7%
- 23. Unit Forced Outage Rate 0% 0% 13.3%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estinated Date of Startup: May 6, 1985
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIA!. ELECTRICITY COMMERCIAL OPERATION 8503100257 850228 PDR ADOCK 05000333 R PDR
AVERAGE DAILY UNIT POWER LEVEL
, DOCKET NO. 50-333 --
UNIT FitzPatrick DATE March 1985 l
COMPLETED BY J. Cook TELEPHONE (315)342-3840 MONTH February 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 713 17 -
2 802 18 -
4 3 802 19 -
l 4 804 20 -
5 801 21 -
6 802 22 -
7 793 23 -
4 8 791 24 -
9 788 25 -
10 787 26 -
11 777 27 -
12 771 28 -
13 767 29 -
14 530 30 -
15 -
31 -
16 - -
SUMMARY
- The FitzPatrick Plant operated at near full thermal power until f
850214 when the unit was shutdown for refueling.
i .
. . .. , - . - - - ~_ _ - .. - - -
., <.,s i
4 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE i
FEBRUARY 1985 The FitzPatrick plant operated at near full' thermal power for the first j fourteen days of this reporting period. On February 14, 1985, the unit.
was shutdown for refueling ending cycle 6. During the shutdown while testing the turbine load unbalance circuitry, a mispositioned pressure
! transmitter isolation valve caused an' initiate signal which ultimately scrammed the plant. An evaluation for cause and corrective action =has been initiated. (See LER-85-006).
At the end of the reporting period, the FitzPatrick plant-is shutdown with startup scheduled to commence May 6, 1985.
1 4
t i
i 1
6 s
l l
J i
l i
I l
l i
i
t UNIT SilUTDOWSS AND F0WER-REDUCTIONS DOCKET NO. '
UNIT NAME DATE REPORT MONTH COMPLETED BY TELEPHONE l "
x xoo R e 3G 7w z $d LICENSEE S'is CAUSE & CORRECTIVE l' NO. DATE E' "$ 8 $U# EVENT $$ $$ ACTION TO
$ $ d is S $ REPORT # $" @. " PREVENT RECURRENCE ov x gmg 8 3 850214 S 319.2 C 3 85-006 TB N/A SHUTDOWN FOR REFUELING (cumulative hrs. 319.2) l SEE NARRATIVE
SUMMARY
1 i
2 3 4 1
F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A-Equipment Failure (E : plain) 1-Manual for Peparation of Data B-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File NUREG D-Regulatory Restriction 4-Other(h. plain) 0161 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other(Explain)
)
NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
FEBRUARY 1985 ACTION TAKEM REPAIR WORK REOUEST NO. HOW CAUSE OF RESULTS OF 10 PRECLUDE TIME DATE SYSTEM CO"PONENT NO. DETECTED MALFUNCTION MALFUNCTION RErURRENCE HOURS 850207 02-3 023108 JIC AGE GEARS WEARING / REPLACED C-13, CLEANED 5.0 TR-89 PRINT MECH CHART GEARS PROBLEM 850226 03 035577 OPS STICKY SWITCHES SCRAM LTS ON 09-5 CLEANED SWITCH 3.0 ROD 38-43 LACK OF USE FULL DISPLAY ACTUATORS / CHECKED OK 850219 03 027962 OPS N/A RETEST CERTAIN RODS PERFORMED IMP-3.7/ 4.0 ROD INDIC. FAILED FULL INDIC OK-TRANS TO MAINT.
850218 03 034496 OPS AGE R0D SPURIOUSLY REPLACED SWITCH / 8.0 ROD 34-37 DESELECTS ITSELF TESTED OK 850206 03 034490 OPS UNKNOWN RED & GREEN LTS ON PERFORMED IMP-3.7/ 1.5 ROD 06-19 AT SAME TIME PROBLEM DISAPPEARS 850130 03 034489 OPS WEAR / AGE NO CHART ADVANCE / REPLACED PEN AMP, 6.0 FR-528 NO BLACK PEN REPAIRED LOOSE GEAR 850218 03-800 034643 OPS AGE SELECT BUTTON NOT REPLACED SWITCH / 8.0 ROD 38-23 OPERATING PROPERLY TESTED OK 850213 07 023156 JIC DIRTY GEARS ON SLUGGISH RESPONSE CLEANED GEARS /RAN 1.5 R-45 RECORDER IMP-G14
NEW YORK F0WER AITTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT s'
MAINTENANCE
SUMMARY
FEBRUARY 1985 ACTION TAKEN REPAIR WORK REOUEST NO. HOW CAUSE OF RESULTS OF 'IO PRECLUDE TIME DATE SYSTEM CO"PONENT NO. DETECTED MALFI'NCTION MALFUNCTION PErURRENCE HOURS 850212 07 034487 OPS UNKNOWN SELECT SWITCH WILL CHECKED SWITCH AND 16.0 ROD 34-19 NOT WORK FOR B RBH RELAY /0K 840214 11 034625 OPS PARTIALLY PLUGGED DISCREPENCY-METER PERFORMED ISP-82, 9.0 LI-66 SENSING LINE AND DIPSTICK ADJ TRANSMITTER ZERO AND SPAN 850206 16-1 034610 OPS RECORDER OUT RECORDER READING CALIBRATED RECORDER 18.0 DPR-200 0F CALIBRATION LOWER THAN PER ISP-35 COMPUTER 850131 17 034528 ops OUT OF CALIBRATION "A" SIDE READING CALIBRATED BLACK PEN / 10.0 RR-433 ERRATIC CLEAN SLIDEWIRE 850220 23 034640 OPS SWITCH FLOAT INDICATES OPEN SWITCH TO BE REPLACED 8.0 A0V-53 ASSEMBLY WHEN FULLY DRND BY MAINTENANCE 850216 23 023046 JIC AGE-DAMAGE INSTRUMENTS REPAIRED AND 11.0 PI-311/PI-312 DURING OVERHAUL DAMAGED RECALIBRATED 850217 23 029187 JIC NATURAL WEAR / ISOLATION VALVE INSTALLED NEW VALVE 3.0 PT-83 AGE LEAKS AND PRESSURE TESTED 850128 27 029642 OPS BAD SAMPLE FLOW 101A READS REPLACED FLOW DIAPHRAGM 224 MAZ-101 REGULATOR DOWNSCALE
NE*J YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE SUPMARY FEBRUARY 1985 ACTION TAEEN REPAIR WORK REOUEST NO. Il0W CAUSE OF RESULTS OF 10 PRECLUDE TIME DATE SYSTEM CO"PONENT NO. DETECTED MALFITNCTION MALFUNCTION P Ert'RRENCE l!OURS 850214 71 023177 JIC PREVENTATIVE SETPOINT VERIF. WORKED THROUGH EXIDE 8.0 INV-3B MAINTENANCE ON LPCI U.P.S. PROCEDURE 850222 76 034526 OPS N/A TIMER NEEDS SET PERFORMED ST76J11- 1.0 SOV-106 FOR 145-155 SEC NO ADJ. NECESSARY 850211 93 034628 OPS SPEED SENSING EDG WOULD NOT CORRECTED SHORT 16.0 EDG "D" CKT MALFUNCTION SHUT OFF IN+65V BUS l
l
r.
IEW YORK POWER AUIHORITY JAMES A. FITZPATRICK NUCEAR POWER FIAl?T SAFEIY REIATED ELECIRICAL & IECHANICAL !!AINITNANCE SlWARY FEBRUARY 1985 REPAIR WORK R$UEST / TIME DATE SYSTEM C W P0t E rr HOW DEIECTED CAUSE OF 1%1RJNCTION ACTION TAIGN 'IO PRECLUDE RECURRENCE HOURS 2/15/85 08 22525 OPS Misadjusted limit Adjusted limit switch; cleaned and 8 Refuel Bridge switch and corrosion. and lubricated th mb switch.
2/26 10 34647 LIRI Worn packing. Repacked. 22 MDV-27A 2/26 10 35505 LLRT Ucrn packing. Repacked. 63 MOV-25A 2/19 29 34504 OPS Water in position Replaced switch internals and 6 ADV-86B indication switch. gasket.
2/27 07 26385 OPS Faulty switch. Replaced switch. 8 7A-53E 2/15 24 34650 OPS Bent Door Linkage. Straightened linkage. 2 EOD-1 2/28 10 35413 LIRT Seat Irak. Disass abled ground seat and disc 166 MOV-31A -reassmbled.
3/2 08 34642 OPS Faulty solenoid. Replaced solenoid. 33 Pcfuel Bridge Monorail Hoist 2/1 01-125 34565 OPS Defective elapsed Replaced meter. 2 FN-1B time meter.
2/21 11 22661 N/A No malfunction. Performed F-ST-06 D & E 16 EV-14 A&B 2/11 24 34616 OPS Bent linkage. Straightened linkage. 32 EOD-1
- s
]
!! hBI YORK POWER AUI110RITY
, JAES A. FITZPATRICK NUCLEAR POWER PIXr SAFETY REIATED ELECIRICAL & MECHANICAL MAINIDMNCE SGNARY 4
1 lezAIR WORK REQUEST # TIME DAIE SYSIDI C WPONENT HOL7 Drau;1tu CAUSE OF MAIRRKT, ION ACTION TAKEN TO PRECLUDE RECUPJENCE HOURS i
2/6 24 34493 OPS Bent linkage. Straightened linkage. 10 EDD-2 :
1/30 27 34322 OPS Misadjusted limit Adjusted limit switch. 3 I VB-2 switch. t
. 2/7 46 34611 Breaker Faulty trip device. Checked cut motor and cabling. 76 j P-2A Tripped replaced trip device. ,
- 1/29 66 36274 N/A No tralfunction. Replaced unit cooler fan motors 6Je 278 to environmental qualification i
UC22A-K requirements.
J d
2/7 71 34626 OPS Dirt. Cleaned inverter and circuit 15 IIN-3B breakers replaced fuses.
2/20- 02 22623 N/A No malfunction. Disassenbled reactor vessel for 920 ,
j . VI refueling. ,
a 2/16 08 22659 Prevmtive Wear Adjusted brakes 18 Refuel Bridge - Maintenance Monorail i Hoist i
[
i l i
s-
r ,
+. 't J;me3 A. FitaPitrick Nucle:r Powre Plant PO. Ebu 41 Lycoming. New York 13093 315 342.3840 Harold A. Glovier
- b NewYorkPower
& Authority March 7, 1985 JAFP-85-0226 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: DOCUMENT CONTROL DESK
REFERENCE:
DOCKET No. 50-333
Dear Sir:
Enclosed please find the J. A. FitzPatrick Operating Status Report for the month of February, 1985. Refueling information remains the same as previously submitted.
If there are any questions concerning this report, please contact John Cook at (315) 342-3 40, Ext. 439.
HAROLD A. GLOVIER IIAG:JPC:mac cc: Internal Distribution Enclosures Ilg '