MONTHYEARML19316A7241980-05-21021 May 1980 Forwards Test Rept for Environ Qualification Test of Penn Union & Marathon Terminal Blocks. Rept Satisfies Util August 1979 Commitment to Test Electrical Terminal Blocks Project stage: Other ML19345D0641980-11-0707 November 1980 Submits Supplemental Response to IE Bulletin 79-01B Re Pressurizer Level Transmitter LT-RC-459 Failure & Replacement Transmitter Failure.Sys Component Work Sheet Encl Project stage: Supplement ML19340E8351980-12-12012 December 1980 Forwards Supplemental Response to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment, Identifying Procedures to Provide Addl Guidance for Coping W/Environmentally Unqualified Electrical Equipment Project stage: Supplement ML19343B7681980-12-19019 December 1980 Submits List of Westinghouse Documents to Be Marked as Proprietary & Removed from Pdr.Documents Also Identified in Westinghouse Project stage: Other ML19341A3921980-12-30030 December 1980 Summary of 801202 Meeting W/Util Re Deficiencies in Licensee Response to IE Bulletin 79-01.Agenda Encl Project stage: Meeting ML19347E2261981-03-12012 March 1981 Forwards Supplemental Info to 801231 Response to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Info Provides Description of Ongoing Qualification Assurance Program Project stage: Supplement ML20004B5981981-04-28028 April 1981 Responds to IE Bulletin 79-01B Re Namco Limit Switches. Prototype Design Being Developed.Limit Switch Sealing Scheduled for First Outage Following Design Completion Project stage: Other ML20004F9671981-06-22022 June 1981 Informs That Applicant Performed Review of & Subsequent Replies ,0202,0312 & 0428 in Response to IE Bulletin 79-01B.Item-by-item re-evaluation in Detailed,Documented Manner Will Be Provided Project stage: Other ML20009B1061981-06-29029 June 1981 Forwards Equipment Qualification Branch Safety Evaluation for Environ Qualification of safety-related Electrical Equipment.Also Forwards Technical Evaluation of Revision 1 to Licensee Response to IE Bulletin 79-01B Project stage: Approval ML20031G1331981-10-15015 October 1981 Forwards Amend 1 to Environ Qualification Documentation Rept for IE Bulletin 79-01B,Vols 1 & 2,in Response to NRC 810608 Safety Evaluation Re Environ Qualification of safety- Related Electrical Equipment Project stage: Other ML20041A1401982-02-11011 February 1982 Advises That Info Requested in NRC Re Environ Qualification of safety-related Electrical Equipment Is Being Submitted to Franklin Research Ctr W/Ltr Project stage: Other ML20054L5141982-06-30030 June 1982 Forwards Updated Executive Summary,Section 1.2 of IE Bulletin 79-01B Rept.List Updated to Reflect Replacement Equipment Installed During Refueling Outage as Well as Info Re Equipment Testing & Procurement/Delivery Schedules Project stage: Other ML20070T3231983-02-0101 February 1983 Responds to SER for Environ Qualification of safety-related Electrical Equipment.Deficiencies Identified Will Not Impair Continued Safe Operation.Reclassification of Manufacturers Info Continuing.Justification for Continued Operation Encl Project stage: Other ML20072L3461983-03-25025 March 1983 Forwards Environ Qualification Documentation Rept, 90-day Response Required by NRC SER for Environ Qualification of safety-related Electrical Equipment Project stage: Other ML20073T1161983-05-0202 May 1983 Forwards Franklin Research Ctr Proprietary Equipment Environ Qualification Worksheets,In Response to 830329 Clarification of Environ Qualification Ser.Previous Submittals Justified Continued Operation.Worksheets Withheld (Ref 10CFR2.790) Project stage: Other ML20071G8321983-05-19019 May 1983 Forwards Response to 10CFR50.49 Rulemaking Re Environ Qualification of Electrical Equipment.When Master List of Equipment Is Coupled W/Recent Response to Ser,More Complete Overview Is Presented Project stage: Other ML20100M5211984-11-29029 November 1984 Forwards Updated Equipment Qualification Items Summary, Including Description of Methods of Environ Qualification for Each Equipment Item Discussed at 840405 Meeting,In Response to SER Re Environ Qualification Project stage: Meeting ML20101Q4941985-01-0202 January 1985 Informs That Actions for Resolving Environ Qualification Deficiencies for Cold Leg Safety Injection Branch Line Flow Transmitters FT-SI-961,962 & 963 Stated in 841129 Rept Will Differ.Rosemount Transmitter FT-SI-943 Installed Project stage: Other ML20101S6001985-01-25025 January 1985 Certifies Compliance w/10CFR50.49, Environ Qualification of Electric Equipment Important to Safety for Nuclear Power Plants, Per Generic Ltr 84-24.Certifications Do Not Apply to Reg Guide 1.97 Equipment Project stage: Other 1981-06-29
[Table View] |
Text
. _ _
14;c-
~
b des
'Af g
si2) 4ss-sooo E'U,'lU.""*
15219 March 12, 1981 United States Nuclear Regulatory Commission
(-
s Office of Inspection and Enforcement Attn:
Boyce H. Grier, Regional Director Q
Region I APR 2 21981% F3 631 Park Avenue i
King of Prussia, Pennsylvania 19406 5
- 0. s,
$toer s,
Reference:
Beaver Valley Power Station, Unit No. 1 y
Docket No. 50-334, License No. DPR-66 Y
IE Bulletin 79-01B m
Gentlemen:
This information supplements our report, dated December 31, 1980, to IE Bulletin 79-OlB.
In Section 5, " Qualification Assurance Program,"
of the subject report, we addressed the need to review and evaluate our procurement and maintenance program in order to establish and maintain an integrated prccurement and tracking program which fully addresses equipment qualification.
Attached is a description of our ongoing qualification assurance program.
If you have any questions, please contact my office.
Very truly yours, C.N.f s~~~
Dunn Vice President, Operations l
Attachment l
t 8104340201
7 e-41 5.0 QUALIFICATION ASSURANCE PROGRAM A program for maintaining the environmental qualification of IEB 79-OlB related components has been developed for use at Beaver Valley Unit 1.
This program encompasses the following areas:
1)
Equipment procured and installed for design changes or plant modifications.
2)
Equipnent replaced or repaired due to equipment failures.
3)
Periodic replacement of equipment which has been identified as having a limited service life.
Presently, these activities are being accomplished as follows:
1)
The procurement of spare parts and the replacement of existing equipment are monitored to assure that parts or equipment pur-chased complies with current environmental qualification requirements.
2)
Supervisors in applicable Station groups have been instructed that a review must be performed, prior to procuring equipment or performing maintenance regarding Class 1E electrical equipment at Beaver Valit y, to determine whether the equipment is included on the BVPS79-01B Master List.
For items on the Master List, Station Engineering will coordinate a review of the procedures or specifications to be used in order to assure that equipment qualification requirements are maintained.
3)
A computeriztd tracking program has been initiated to assure timely replacement or renewal of equipment which has been identified as having a limited service life.
Based on equipment installation dates and recommended upgrading requirements, equipment / parts will be periodically replaced as required to ensure that environmental qualifications are maintained.
While current activities adequately address the issue of qualification assurance, further methods to facilitate the implementation of this program are being considered.
These include:
generating status reports from the tracking computer on a regular basis for staff review; updating purchase specifications and maintenance procedures in advance of need to expedite purchase and maintenance activities; re-establishing re-order points to assure available spare parts; and identifying 79-01B related items on the spare parts computer program. Where feasible, these methods may be used to enhance the overall effectiveness of the qualification assurance program.