Forwards Supplemental Info to 801231 Response to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Info Provides Description of Ongoing Qualification Assurance Program
ML19347E226
Person / Time
Site: Beaver Valley
Issue date: 03/12/1981
From: Dunn C
DUQUESNE LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-79-01B, IEB-79-1B, TAC-42459, NUDOCS 8104240291
Download: ML19347E226 (2)


Text

. _ _

14;c-

~

b des

'Af g

si2) 4ss-sooo E'U,'lU.""*

15219 March 12, 1981 United States Nuclear Regulatory Commission

(-

s Office of Inspection and Enforcement Attn:

Boyce H. Grier, Regional Director Q

Region I APR 2 21981% F3 631 Park Avenue i

King of Prussia, Pennsylvania 19406 5

0. s,

$toer s,

Reference:

Beaver Valley Power Station, Unit No. 1 y

Docket No. 50-334, License No. DPR-66 Y

IE Bulletin 79-01B m

Gentlemen:

This information supplements our report, dated December 31, 1980, to IE Bulletin 79-OlB.

In Section 5, " Qualification Assurance Program,"

of the subject report, we addressed the need to review and evaluate our procurement and maintenance program in order to establish and maintain an integrated prccurement and tracking program which fully addresses equipment qualification.

Attached is a description of our ongoing qualification assurance program.

If you have any questions, please contact my office.

Very truly yours, C.N.f s~~~

Dunn Vice President, Operations l

Attachment l

t 8104340201

7 e-41 5.0 QUALIFICATION ASSURANCE PROGRAM A program for maintaining the environmental qualification of IEB 79-OlB related components has been developed for use at Beaver Valley Unit 1.

This program encompasses the following areas:

1)

Equipment procured and installed for design changes or plant modifications.

2)

Equipnent replaced or repaired due to equipment failures.

3)

Periodic replacement of equipment which has been identified as having a limited service life.

Presently, these activities are being accomplished as follows:

1)

The procurement of spare parts and the replacement of existing equipment are monitored to assure that parts or equipment pur-chased complies with current environmental qualification requirements.

2)

Supervisors in applicable Station groups have been instructed that a review must be performed, prior to procuring equipment or performing maintenance regarding Class 1E electrical equipment at Beaver Valit y, to determine whether the equipment is included on the BVPS79-01B Master List.

For items on the Master List, Station Engineering will coordinate a review of the procedures or specifications to be used in order to assure that equipment qualification requirements are maintained.

3)

A computeriztd tracking program has been initiated to assure timely replacement or renewal of equipment which has been identified as having a limited service life.

Based on equipment installation dates and recommended upgrading requirements, equipment / parts will be periodically replaced as required to ensure that environmental qualifications are maintained.

While current activities adequately address the issue of qualification assurance, further methods to facilitate the implementation of this program are being considered.

These include:

generating status reports from the tracking computer on a regular basis for staff review; updating purchase specifications and maintenance procedures in advance of need to expedite purchase and maintenance activities; re-establishing re-order points to assure available spare parts; and identifying 79-01B related items on the spare parts computer program. Where feasible, these methods may be used to enhance the overall effectiveness of the qualification assurance program.

e 8

e